ML17285A788

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1989 for Washington Nuclear Plant Unit 2.W/891009 Ltr
ML17285A788
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1989
From: Hutchinson L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910190082
Download: ML17285A788 (8)


Text

gC CELZ RATED Dl SBUT]ON DEMO?i SYSTEM STRIDOR REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8910190082 FACIL:50-397 WPPSS DOC.DATE: OTARIZED: NO Nuclear Project, Unzt 2, Washington Public Powe DOCKET 05000397 I

AUTH. NAME AUTHOR AFFILIATION HUTCHINSON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o e 'ng rept for Sept 1989 for WPPS 2 Nuclear Plant. 891009 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR .ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL' ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 SAMWORTH,R 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1

/~DQJ PB 10 1 1 NUDOCS-ABSTRACT 1 1 REG FILE 01 1 1 RGN5 1 1 EXTERNAL: EG&G SIMPSON, F 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOIR 'IO ALL 'RIBS" KMIPZERIS PIZASE HELP US TO REDUCE %ASTEl CGKIRCZ 'IHE DOCUMENI'ONSOL DESK RjON Pl-37 (EXT. 20079) KO EIJMZNATB %SR NAME ERCH DIPI%GMTZGN LISTS MR DCKXlMEHIS VXJ KH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR'2D9 ENCL 29

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99362 Docket No. 50-397 October. 9; 1989 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear. Sir,

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, September 1989 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours; gag.~

C. M. Powers (M/D 927M)

WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr. J. B. Martin NRC Region V Mr. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI; Farmington CT Mr. J. T. Wheelock INPO Mr.. W. H. Lovelace NRC, Washington D.C.

8510iVOOe2 SV0WSO PDR ADOCK 05000397 R PDC

0 ~ ~

E

~ ~

DOCKET NO. 50-0'lIT NAl lE DATE 10/1/89 WIT St lUTDOl'(NS / REDUCTIONS COlfPLETED l3Y LB HUTCHISON DEPOT PERIOD SEPT 19 898 TELEPI lONE -2 6 mcnth, year FI5. ~n Xiii colin~ ~880H T>~TilLo iZClK t t I fl'ntt 89-12 9/21/89 F 29 A 2 HC HT EXCH-D PLANT WAS MANUALLY SHUTDOWN BECAUSE OF RAPIDLY INCREASING CONDUCTIVITY DUE TO CONDENSER TUBE .

IN-LEAKAGE. TWO DAMAGED TUBES WERE PLUGGED AND PLANT REMAINED DOWN FOR REPAIR OF STEAM EXTRACTION LINES.

89-13 9/22/89 S 167.16 A HJ PIP EXX-E PLANT REMAINED DOWN FOR REPAIR/REPL'ACEMENT OF TWO FAILED STEAM EXTRACTION LINE EXPANSION:-

BELLOWS AND CONDENSER BAFFLE REPAIR. AFTER COMPLETION OF..-"REPAIR TO ALL DAMAGED COMPONENTS, THE PLANT WAS RETURNED TO SERVICE.

SOf'MY WNP-2 INCURRED 1 FORCED OUTAGE WHICH WAS EXTENDED FOR REPAIR OF RELATED COMPONENTS.

TYPE t lETl lOO SYSTEM & COhlPOhEHT F-Forced A-Equip Failure F-Admin l-manual Exhibit F & H S- ched 0-hlaint or Test ~ .G-Oper Error 2-manual Scratch Instructions for C-Refuel.ing H-Other 3-Auto Scram Preparation D-Regulatory Res triction 4-Continued Entry Sheet ol'ata E-Operator Training 9 Ilnducod Load Licensee Event Report

& License Examination 9-Other (LiER) File (NUAEG-0161)

tl ~

I

DOCKET NO. 50-397 UNIT WNP-2 DATE 10/1/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 flONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) ~ (MwE-Net) 745 17. 1062

2. 757 18. 1062 759 1050
3. 19.
4. 755 20. 944
5. 716 21. 673
6. 747 22.
7. 750 23.
8. 746~ 24.
9. 747 25.
10. 950 26.

1014 27.

1058 28.

12.

1061 29.

13.

1067 30. 550 14.

1045 31.

15.

1002 16.

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a gr aph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%

line (or the restricted power level line). In such cases,. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~ '

' > ~

OPERATING DATA REPORT WNP-2 Ol-Oct-89 1 ~ DOCKET: 50-397 2 REPORTING PERIOD: Sep-89 OUTAGE + ON-LINE HOURS 720

3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 109'5 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORTs GIVE REASONS 10 ~ POWER TO WHICH RESTRICTEDs IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONSs IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 6551 42055.2
13. HOURS REACTOR CRITICAL 537 5 4648.7 30866.3
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 523.8 4474.4 29638.9 16 'NIT RESERVE SHUTDOWN HOURS 0.0 1451765 0.0 12259391 381.7 81370596
17. GROSS THERMAL ENERGY (MWH) 18- GROSS ELECTRICAL ENERGY (MWH) 481010 4033680 27067180
19. NET ELECTRICAL ENERGY (MWH) 460308 3857783 26026091 20.

21.

22.

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITY FACTOR (MDC NET) 72.8/

72.8/

58.4/

68.3/

68.3/

53.8/

71 '/

70.5/

56.5/

23. UNIT CAPACITY FACTOR (DER NET) 58.1/ 53.5/ 56.3/
24. UNIT FORCED OUTAGE RATE 5.2/ 6 4/ 9 2/
25. FORCED OUTAGE HOURS 29 0 304.6 2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEsDATEsDURATION)

NNE

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~ ~

'