Text
'FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules Washington Public Power Supply System o
3000 George Washington Way; Richland, WA 99352 (Name and Address of Owner) 2 Pl,n, WNP-2'anford Reservation'enton Count 'ashin ton (Name and Address of Plant)
Plant Unit WNP 2
- 4. Owner Certificate of Authorization (ifrequired)
- 5. Commercial Service Date~~6. National Board Number for Unit
- 7. Components Inspected 1 of 25 Component or Appurtenance RPV RHR"V"53A MS"V"28A MS"V-28D MS-V-22A MS"Y-22D RCIC-Y-66 RCIC"Y"65 RCIC-V-8 RHR-V"23 RHR-Y"41A RHR"HX"1A Manufacturer or Installer CBIN Nuclear, Co.
Anchor/Darling Valve Co.
Rockwell Mfg. Co.
Rockwell Mfg. Co.
Rockwell Mfg. Co.
Rockwell Mfg. Co.
Anchor/Darling Valve Co.
Velan Engineering Co.
Velan Engineering Co.
Anchor/Dar ling Valve Co.
Yelan En ineerin Co.
Delta Southern Co.
Manufacturer or Installer Serial No.
T"45 E6330-2"2 JU-53 JT-78 JV-2 JT-41 IN321 0334 77 IN-104 0064 35009"74-1 State or Province No.
29936"84W N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A National Board No.
N/A 78 71 81.
68 N/A N/A N/A N/A 3489 Lg Bore Pipe Notes:
(1)
Bechtel The piping examined is i NIS-1 form.
N/A eluded on Pag 4 thr ough 2
N/A of this Noter Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is Srh in. x 11 in.,
(2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at thc top of this form.
This form (E00029) may be obtained from the order Dept., AsME, 345 E. 47th st., New York, N.Y.
10017 l
'ei0>70I47 S9>004 PDR ADOCK 05000397 8
m
('ORM NIS-1 (back) 2of 25 444
- 8. Exstnination Dates 6/22/88 to 6/26/89
- p. Inspection lntereal from 12/213 84 ro ~1'l3/94
- 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required..
for currentintcrval. Approximately 47K of the examinations required for this inspec-'ion interval at.e complete.
See pages 4 through 25 for examinations completed*
- 11. Abstract of Conditions Noted.
See Page 3
- 12. Abstract of Corrective Measures Recommended and Taken See Page 3
19~ Sig,d WPPSS Date Owner VIe certify that the statements made in this report are correct and the examinations and corrective rnea-sures taken conform to the rules of the ASME Code, Section Xl.
. frt t
'1 Ey I
rtt Certificate ofAuthorization No. (ifapplicable)
Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel t/i f
have inspected the components described in this Owners'ata Report during the period 6 27 88 to 6/26/89 and state that to the best of my knowledge and belief, theOwner has performed examinations and taken corrective measures described in this Owners'ata Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners'ata Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date Inspect r's Signature Commissions National Board, State, Province and No.
- (cont) at this refueling outage.