Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17285B456 + (10:45:00, 8 January 2025)
- ML17285B434 + (10:45:01, 8 January 2025)
- ML17285B453 + (10:45:01, 8 January 2025)
- ML17285B433 + (10:45:02, 8 January 2025)
- ML17285B431 + (10:45:03, 8 January 2025)
- TAC:63413 + (10:45:04, 8 January 2025)
- ML17285B429 + (10:45:04, 8 January 2025)
- ML17285B428 + (10:45:05, 8 January 2025)
- ML17285B427 + (10:45:05, 8 January 2025)
- 05000397/LER-1990-012, :on 900527,failure of Diesel Generator Slip Ring End Bearing Resulted in Fire in Bearing Area.Caused by Mfg Error,Design Deficiency & Personnel Error.Emergency Operating Procedures Used to Deal W/Fire + (10:45:07, 8 January 2025)
- IR 05000397/1990018 + (10:45:09, 8 January 2025)
- ML17285B423 + (10:45:11, 8 January 2025)
- ML17285B422 + (10:45:12, 8 January 2025)
- GO2-90-136, Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised + (10:45:13, 8 January 2025)
- ML17285B420 + (10:45:13, 8 January 2025)
- GO2-90-134, Provides Engineering Evaluation Re Loss of Signal from Containment Monitoring Sys.Concludes That Unauthorized Work Activity by Craftsman Isolated + (10:45:14, 8 January 2025)
- ML17285B415 + (10:45:16, 8 January 2025)
- 05000397/LER-1989-010-01, :on 890501,experienced Momentary Loss of 120-volt Ac Power to Bus & on 890503,bus Suffered Sustained Loss of 120-volt Ac Power.Caused by Nameplate Falling Into Reactor Protection Sys Bus a Supply Circuitry + (10:45:18, 8 January 2025)
- ML17285B410 + (10:45:19, 8 January 2025)
- ML17285B408 + (10:45:20, 8 January 2025)
- 05000397/LER-1990-014, :on 900703,HPCS Sys Pump Suction Switchover from Condensate Storage Tanks to Suppression Pool Occurred Due to Suppression Pool High Water Level Condition.Caused by Procedural Inadequacy.Procedures Modified + (10:45:22, 8 January 2025)
- GO2-90-133, Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns + (10:45:23, 8 January 2025)
- ML17285B402 + (10:45:25, 8 January 2025)
- ML17285B403 + (10:45:25, 8 January 2025)
- GO2-90-132, Application for Amend to License NPF-21,implementing Generic Ltr 88-16, Removal of Cycle-Specific Parameter Limits from Tech Specs. Amend Revises Tech Specs 1.0,3/4.2.1,3/4.2.3, 3/4.2.4,3/4.4.1,B3/4.2.1,B3/4.2.3 & 6.9 + (10:45:26, 8 January 2025)
- GO2-90-130, Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs + (10:45:28, 8 January 2025)
- GO2-90-131, Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per . Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys + (10:45:29, 8 January 2025)
- ML17285B397 + (10:45:31, 8 January 2025)
- ML17285B396 + (10:45:32, 8 January 2025)
- ML17285B393 + (10:45:33, 8 January 2025)
- IR 05000397/1990014 + (10:45:37, 8 January 2025)
- ML17285B390 + (10:45:38, 8 January 2025)
- ML17285B386 + (10:45:39, 8 January 2025)
- ML17285B385 + (10:45:40, 8 January 2025)
- GO2-90-122, Forwards Util 1990 Emergency Exercise Scenario.W/O Encl + (10:45:41, 8 January 2025)
- IR 05000397/1990015 + (10:45:44, 8 January 2025)
- ML17285B379 + (10:45:45, 8 January 2025)
- GO2-90-123, Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur + (10:45:46, 8 January 2025)
- GO2-90-124, Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring + (10:45:47, 8 January 2025)
- ML17285B377 + (10:45:47, 8 January 2025)
- GO2-90-125, Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed + (10:45:49, 8 January 2025)
- ML17285B372 + (10:45:49, 8 January 2025)
- GO2-90-119, Comment Supporting Petition for Rulemaking PRM-50-55 Re Frequency of FSAR Revs,Per 10CFR50.71(e)(4) Requirements + (10:45:51, 8 January 2025)
- TAC:64670 + (10:45:52, 8 January 2025)
- ML17285B369 + (10:45:53, 8 January 2025)
- TAC:56181 + (10:45:53, 8 January 2025)
- 05000397/LER-1990-013, :on 900610,ESF Isolations & Actuations Occurred Due to Breaker Trip.Cause of Event Not Determined.Power Restored to E-MC-7A & Isolations Restored + (10:45:54, 8 January 2025)
- GO2-90-118, Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager + (10:45:55, 8 January 2025)
- GO2-90-120, Responds to NRC Re Violations Noted in Insp Rept 50-397/90-10.Corrective Actions:Access Doorway to RHR HX Room Posted as High Radiation Area & Health Physics Technician Counseled on Radiological Posting Requirements + (10:45:56, 8 January 2025)
- GO2-90-116, Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ + (10:45:58, 8 January 2025)
- ML17285B362 + (10:45:59, 8 January 2025)