ML17285B427
| ML17285B427 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/31/1990 |
| From: | John Baker, Hutchison L WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9008170005 | |
| Download: ML17285B427 (8) | |
Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM yO
~'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9008170005 DOC.DATE: 90/07/31 NOTARIZED: NO DOCKET g
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jul 1990 for Washington Nuclear Plant 2.W/900808 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
SIZE:
D RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.
INTERNAL: ACRS AEOD/DSP/TPAB NR+/DL LPEB1 0 EG~XEP 01 EXTERNAL: EGGG BRYCE,J.H NRC PDR
'OPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 3
3 1
1 "RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 LPDR NSN COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 A
D D
I S
/llo (o854 o ~ ~~
R D
D NOTE TO ALL"RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR.NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 29 g ~Q
I'"
~
r I0 I
k P ~
p I
V
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96B
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No.
50-397 August 8',
1990 U. S.
Nuclear, Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear,
Sir,:
SUBJECT:
NUCLEAR PLANT NO.
2 MONTHLY OPERATING REPORT JULY 1990 Transmitted herewith is the Monthly Operating Report as required by our, Technical Specifications 6.9. 1.6.
Very Truly Yours, J.
. Baker, (N/D 927M)
WNP-2 Plant Manager, JWB/lc Enclosure cc:
Nr,.
Nr,.
Ns.
Nr,.
Nr>.
J.
B. Nartin-C. J. Bosted-Dottie Sherman J. T. Wheelock W.
H. Lovelace NRC Region V
NRC Resident Inspector, (901A)
" INPO NRC; Washington D.C.
- 9008i70005 900731
'FDR ADOCK 05000397 R ',~
PDC QQOpySIS
~ tiP il
A
)i f
~<<
l
~
4
<<I VERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-397 UNIT WNP-2 DATE 8/1/90 2.
3.
5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
16.
\\<<
tlONTH July 1990 DAY AVERAGE DAILY POWER LEVEL (t~iwE-Net) 17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27 ~
28.
29 ~
30.
31.
COMPLETED B Y LB Hutchi son TELEPHONE (509) 377"2486 DAY AVERAGE DAILY POWER LEVEL INSTRUCTIONS On this form, list the average daily unit power level in VWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line).
In such
- cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
RERIIT PERIOD ~gul lggo
- month, year Hil.
ODD~K TT~E W/Ils RER!sgig 90-02 4/21/90 S
744 C
LNIT SflUTDONNS / REDUCTIONS mRm~ =vl l llÃfl RC Fuel xx DOCKET NO.
50-397 UNIT NAME WNP-2 DATE 8/1/90
'OMPLETED BY LB Hutchison TELE'ONE (609) 377-2486 R
C HRENC i
Outage continued through the month for completion of repairs and restoration to service of a Diese'I Generator..s
'U~p~ARY WNP-2 remained shutdown the entire month of July as described above.
T'YPE F-Forced S-Sched A-Equip Failure B-Maint or Test C-Refueling D-Regulatory Restriction E-Operator Training h License Examination F-Admin G-Oper Error H-Other 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM I COMPONENT Exhibit F h H Instructions for Preparation of Data Entry Sheet Licensee Event Report (LER) File (NUREG-0161)
OPERATING DATA REPORT WNP-2 01-Aug-90 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Jul-90 3.
UTILITY CONTACT:
OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 744 4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET MWe):
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
NONE 3323 1200.9 1100 1140 1095 10.
POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11.
REASONS FOR RESTRICTIONS, IF ANY:
NONE 12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744 0.0 0.0 0.0 0.0 0
0
-9968 0.04 0.04
- 0. 0>o 0.0<
- 0. O~o 0.0 YEAR CUMULATIVE 5087 49351.2 2653.8 35729.1 0.0 340.4 2639.5 34487.4 0.0 381.7 8233337 96577777 2739380 32143330 2615575 30901718 51.94 69.9ll 51.94 70.7>
47.04 57.24 46 '+o 56 '+o 0.04
- 8. 0>o 0.0 2996.2 2 6 ~
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATEi DURATION )
NONE
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
V