Docket No. 50-397
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE,SUITE 210
WALNUTCREEK, CALIFORNIA94596
JUL -3 10gP
Washington Public Power Supply System
P.
0.
Box 968
3000 George
Way
Richland,
99352
Attention:,
Mr.
G.
C.
Sorensen,
Manager,
Reg'ulatory
Programs
Gentlemen:
Subject:
NRC Inspection of WNP-2
This letter refers to the inspection
conducted
by Messrs.
E.
M. Garcia
and
M. Cillis of this office on May 21 - 25,
1990 of activities authorized
by
NRC
Operating
License
No.
and to the discussion
of findings held by the
inspectors with Mr. J.
Baker
and other members of the Supply System's staff at
the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection'eport.
Within these
are'as,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and ob'servations
by the inspectors.
Based
on the results of this inspection, it appears
that one of your
activities
was not conducted in full com~pliance with NRC requirements
as
discussed
in Section 2.F of the enclosed
report.
The violation is not being
cited because
the criteria specified in Section
V.G of the Enforcement Policy
were satisfied.
A number of observations
in the enclosed
report indicate
a lack of individual
responsibility for good radiological practices.
Continued lack of individual
responsibility could result in an event with significant radiological
consequences.
It may be appropriate for WPPSS
management
to reemphasize its
expectations
in this area.
In accordance
with 10 CFR 2. 790(a),
a copy of this letter
and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
GP J-~
R.
A.
arano,
D rector
Division of Radia ion Safety
and Safeguards
%IX>7i;i0034 9I,>O7iI.;
I'-'rW
irIOt;V. O.--;I>~'.-jI='P 7
PDL
Enclosure:
Inspection
Report
No. 50-397/90-15
cc: w/enclosure
J.
W. Baker,
WNP-2 Plant Manager
A.
L. Oxsen, Assistant
Managing Director for Operations
G.
D. Bouchey, Director, Assurance
8 Licensing
A.
G. Hosier,
WNP-2 Licensing Manager
G.
E.
Doupe,
Esq.
M.
H. Philips; Bishop,
Cook, Purcell
8 Reynolds
T. Strong,
DSHS State of Washington
State of Washington
-2-
bcc w/copy of enclosure:-
Docket File
Project Inspector
Resident Inspector
G.
Cook
B. Faulkenberry
J. Hartin
A. Johnson
P.
Johnson
bcc w/o enclosure:
H. Smith
N. Western
J. 2ollicoffer
REGION V
.
kC
EGarci~s
HCillis
W /9~~ y/y/9O
73
(p
g'J
son
FWens
awski
GYuhas
.
7f/Q /90
'7p/y /90
1 p/g /90
E
/
NO
] YES /
0
] YES /
0
] YES /
NO
] YES /
NO
]
yfz:190
E
/
NO
]
ES /
NO