Forwards Insp Rept 50-397/90-14 on 900514-0617.Violations Re Inadequate Grounding Practices & Failure to Follow Std Electrical Practices Noted
ML17285B390
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/11/1990
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17285B391 List:
References
NUDOCS 9007270001
Download: ML17285B390 (4)


See also: IR 05000397/1990014

Text

gS REOII,

~

~+

'

0

0

o'4*<<+

Docket No. 50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE,SUITE 210

WALNUTCREEK, CALIFORNIA94595

Washington Public Power Supply System

P.

0.

Box 968

Richland, Washington

99352

Attention:

Mr.

G.

C. Sorensen

Manager Regulatory

Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

C. J.. Bosted

and

. R.

C. Sorensen

of this office on May 14 - June 17,

1990 of activities

authorized

by NRC Operating

License

No. NPF-21,

and to the discussions

of

their findings held by the inspectors with Mr. J.

Baker and other members of

the Supply System's staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel

and observations

by the inspectors.

As discussed in paragraph

9 of the enclosed report,

an attempt to energize

the

25KV portion of the unit electrical

system

on June 3, 1990, resulted in a

major electrical fault due to the associated

electrical lines having been

inadvertently left grounded to the station ground.

We understand that you are

conducting

an assessment

of this event,

which was still in progress

at the

conclusion of this inspection,

however, preliminary results

and our own review

indicate that inadequate

grounding practices

and

a failure to follow standard

electrical practices

contributed significantly to the event.

Although the

equipment involved was not safety-related,

the procedures

used to control the

work are

common to the facility.

Therefore; you are requested

to inform this

office, within thirty days of the date of this letter, of your final

assessment

of the causes

of the event

and the actions you plan to correct

those

causes.

Based

on the results of this inspection, it appears

that one of your

activities was not conducted in full compliance with NRC requirements.

A

Severity Level

V violation was identified,

as discussed

in paragraph

9.

In

view of improvements

already

implemented to address this concern,

and pursuant

to 10 CFR Part 2, Appendix C, this item is not being cited in-a Notice of

Violation.

Accordingly, a response

to this item is not required.

0

gp

iP-OOO ]

9OP7 1

p DECI

O~OOI-I->>

I='DC

I((

In accordance

with 10 CFR 2.790 (a3,

a copy of this letter

and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

oo roov

q

)

Enclosure:

Inspection Report No. 50-397/90-14

S.

A. Richards,

Chief

Reactor Projects

Branch

cc w/enclosure:

A. L. Oxsen,

Deputy Managing Director

Q.

D. Bouchey, Directo~, Assurance

& Licensing

J.

W. Baker,

WNP-2 Plant Manager

A. G. Hosier,

WNP-2 Licensing Mana'ger

G.

E.

Ooupe,

Esq.

M.

H. Philips; Bishop,

Cook, Purcell

8 Reynolds,

State of Washington

.

-3-

Enclosure:

Inspection

Report

No. 50-397/90-14

cc:

A.

L. Oxsen,

Deputy Managing Director

G.

D. Bouchey, Director, Assurance

8 Licensing

J.

W. Baker,

WNP-2 Plant Manager

A.

G. Hosier,

WNP-2 Licensing Manager

G.

E.

Doupe,

Esq.

M.

H.

Phi lips; Bishop,

Cook, Purcell

8 Reynolds

State of Washington

bcc:

C.

Bosted

A.

Hon

C.

Sorensen

Project Inspector

Res>dent

Inspector

docket file

G.

Cook

B. Faulkenberry

J. Martin

REGION V/dot

PJohnson

i/

/90

SRichards

7/n /90

YES /

NO

] YES /

NO

] YES /

NO

] YES /

NO

]

YES /

NO

]

Enclosure:

Inspection Report

No. 50-397/90-14

cc:

A. L.

G.

D.

'.

M.

A. G.

G.

E.

M. H.

State

Oxsen,

Deputy Managing Director

Bouchey, Director, Assurance

& Licensing

Baker,

MNP-2 Plant Manager

Hosier,

WNP-2 Licensing Manager

Doupe,

Esq.

Philips; Bishop,

Cook, Purcell

& Reynolds

of ktashington

bcc:

C. Bosted

A. Hon

C. Sorensen

POP

CSo ensen

7/ lt /9~

C

sted

7/(( /v0

PJohnson

SRichards

7/II/ ID

REQUEST

PY

REQUEST

C

PY

STCP

YES /

NO

]

YES /~

]

YES

HO

E

TCP]

YES

NO

]