ML17285B377

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1990 for Washington Nuclear Plant Unit 2
ML17285B377
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1990
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9007180136
Download: ML17285B377 (7)


Text

ACCELERATED DI TRIBUTION DEMONSTRATION SYSTEM t

ing REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007180136 DOC.DATE: 90/06/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1990 for Washington Nuclear Plant Unit 2.W/900706 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs NOTES ENCL SIZE:

RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NR~

LPEB10 G~FLE Ol EXTERNAL: EGGG BRYCE,J.H NRC PDR COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 3

3 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 29 ENCL 29 yt

~

~ '1

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.o. Box 96B

~ 3000 George Washington Way

~ Richland, Washington 99362 Docket No.

50-397 July 6, 1990 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT JUNE 1990 Transmitted herewith is the Monthly Oper ating Report as required by our Technical Specifications 6.9.1.6.

Very Truly Yo r s, C.

. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc:

Mr. J.

B. Martin-Mr. C. J. Bosted-Ms. Dottie Sherman Mr. J. T. Wheelock Mr.

W.

H. Lovelace NRC Region V

NRC Resident Inspector (901A)

- ANI, Farmington CT INPO

- NRC, Washington D.C.

90071S0136 900630 PDR ADOCK 05000397 R

PDC

L

'I a

, \\

II

LNIT SHUTDONNS / REDUCTIONS DOCKET NO.

50-397 UNIT NN 1E WHP-2 DATE

/2/gO COMPLETED BY REPCAT PERIOD June 19 90

mcnth, year Rtf.

banD'TTTP'Dmin~

nznsQH

~vr. i m TELE'NE 509)377-2486 90-02 4/21/90 S

720 C

4 RC Fuel xx Refueling operation completed.

However, outage was extended due to failure of a Diesel Generator.

Rewinding of Diesel Generator rotor is in progress.

SUhtiAAY WNP-2 remained shutdown the entire month of June as described above.

T'YPE F-Forced S-Sched

~

F-Admin G-Oper Error H-Other A-Equip Failure 0-Maint or Test C-Aefue ling D-Regulatory Restriction E-Operator Training

& License Examinat.ion METHOD 1-Manual 2-manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM & COMPOtENT Exhxbzt F & H Instructions for Preparation of Data E'ntry Sheet Licensee Event Aepnrt (LER) File (NUAEG-0161)

EP

~

r AVERAGE DAILY UNIT POHER LEVE DOCKET NO.

50-397 UNIT HNP"2 DATE MONTH June 1990 DAY AVERAGE DAILY POt4ER LEVEL (t~wE-Net) 2.

3.

5.

6.

7.

8.

9.

10.

12.

13; 14.

15.

16.

\\E 17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

Zg 30.

31.

EPEPLEIE I~

I IIE~

DAY AVERAGE DAILY POMER LEVEL (m E-Net)

INSTRUCTIONS I

On this form, list the average daily unit power level in tNe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%

line (or the restricted power level line).

In such

cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

$ C QEE

OPERATING DATA REPORT WNP-2 01-JU1-90 1.

DOCKET: 50-397 2.

REPORTING PERIOD:

Jun-90 3.

UTILITY CONTACT:

OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 720 4.

LICENSED THERMAL POWER (MWt):

5.

NAMEPLATE RATING (GROSS MWe):

6.

DESIGN ELECTRICAL RATING (NET MWe):

7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

3323 1200.9 1100 1140 1095 10.

POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

11.

REASONS FOR RESTRICTIONS, IF ANY:

12.

REPORT PERIOD HOURS 13.

HOURS REACTOR CRITICAL 14.

RX RESERVE SHTDWN HRS 15.

HRS GENERATOR ON LINE 16.

UNIT RESERVE SHUTDOWN HOURS 17.

GROSS THERMAL ENERGY (MWH) 18.

GROSS ELECTRICAL ENERGY (MWH) 19.

NET ELECTRICAL ENERGY (MWH) 20.

UNIT SERVICE FACTOR 21.

UNIT AVAILABILITYFACTOR 22.

UNIT CAPACITY FACTOR (MDC NET) 23.

UNIT CAPACITY FACTOR (DER NET)

24. UNIT FORCED OUTAGE RATE 25.

FORCED OUTAGE HOURS MONTH 720 0.0 0.0 0.0 0.0 0

0

-9590 0.0%

0.04 0.04 0.04 0.04 0.0 YEAR CUMULATIVE 4343 48607.2 2653.8 35729.1 0.0 340.4 2639.5 34487.4 0.0 381.7 8233337 96577777 2739380 32143330 2625543 30911686 60.84 71.04 60 '+o 71 '~o 55.24 58.14 55.04 57.84 0.04

8. O~o 0.0 2996.2 26

~

SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATEi DURATION)

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

7/17/90