Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17286A537 + (10:41:59, 8 January 2025)
- ML17286A534 + (10:42:01, 8 January 2025)
- GO2-90-208, Forwards Rev 10 to Emergency Preparedness Plan + (10:42:02, 8 January 2025)
- ML17286A532 + (10:42:04, 8 January 2025)
- TAC:69161 + (10:42:05, 8 January 2025)
- ML17286A530 + (10:42:05, 8 January 2025)
- GO2-90-207, Expresses Appreciation for 901129 Meeting Re Recently Issued Performance Assessment Rept.Actions Taken to Remedy Weaknesses Identified in 901108 Will Be Addressed at Next Quarterly Mgt Meeting + (10:42:06, 8 January 2025)
- IR 05000321/2017007 + (10:42:11, 8 January 2025)
- ML17286A527 + (10:42:12, 8 January 2025)
- IR 05000397/1990030 + (10:42:14, 8 January 2025)
- ML17286A524 + (10:42:15, 8 January 2025)
- ML17286A522 + (10:42:16, 8 January 2025)
- IR 05000397/1990027 + (10:42:20, 8 January 2025)
- ML17286A518 + (10:42:21, 8 January 2025)
- GO2-90-204, Responds to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. No Subj motor-operated Valves Identified at Facility + (10:42:22, 8 January 2025)
- ML17286A516 + (10:42:22, 8 January 2025)
- 05000397/LER-1990-028, :on 901023,degradation of Primary Containment Pressure Boundary Caused Plant Shutdown,Due to Cracks on HPCS Small Bore Piping + (10:42:24, 8 January 2025)
- ML17286A501 + (10:42:26, 8 January 2025)
- 05000397/LER-1990-029, :on 901108,inadequate Containment Penetration Testing Associated W/Wetwell Hatch Pressure Warning Devices Discovered + (10:42:27, 8 January 2025)
- ML17286A497 + (10:42:28, 8 January 2025)
- TAC:73563 + (10:42:28, 8 January 2025)
- ML17286A495 + (10:42:29, 8 January 2025)
- ML17286A492 + (10:42:30, 8 January 2025)
- ML17286A489 + (10:42:31, 8 January 2025)
- GO2-90-202, Forwards Relief Requests RP-1,RV-1 and RV-25 Supporting Which Requested Interim Approval of Rev 3B to Pump & Valve Inservice Test Program Plan + (10:42:32, 8 January 2025)
- GO2-90-201, Documents Closure of Open Items in 880329 Response to NRC SER Re Dcrdr & Responds to Generic Ltr 88-20.Resolution of Potential Need for Increase in Size of Primary Containment Valve Will Be Incorporated Into Individual Plant Exam + (10:42:34, 8 January 2025)
- 05000397/LER-1990-026, :on 901024,inadequate Electrical Power Supply Separation Discovered in Two Control Room Panels Due to Design Error + (10:42:38, 8 January 2025)
- GO2-90-197, Advises That BPA Obligated to Guarantee Payment of Deferred Premium Per 10CFR140.21 + (10:42:39, 8 January 2025)
- 05000397/LER-1990-024, :on 900907,diesel Generator Started on Undervoltage Due to Voltage Disturbances + (10:42:41, 8 January 2025)
- 05000397/LER-1990-027, :on 901030,diesel Fuel Oil Not Tested for Sulfur Content & Water in Accordance W/Tech Specs + (10:42:49, 8 January 2025)
- GO2-90-194, Requests That NRC Reactor Operator Exam Be Scheduled for Wk of 910401-05 + (10:42:50, 8 January 2025)
- ML17286A453 + (10:42:53, 8 January 2025)
- GO2-90-192, Responds to Findings & Concerns Identified in EOP Insp Rept 50-397/90-20.Corrective Actions:Licensee to Verify Correct Incorporation of All EOP Calculations Into Existing EOPs + (10:42:54, 8 January 2025)
- ML17286A448 + (10:42:56, 8 January 2025)
- ML17286A444 + (10:42:57, 8 January 2025)
- IR 05000397/1990025 + (10:42:59, 8 January 2025)
- ML17286A438 + (10:43:00, 8 January 2025)
- GO2-89-122, Responds to Generic Ltr 89-08 Re erosion/corrosion-induced Pipe Wall Thinning.Long Term Pipe Wall Thinning Monitoring Program Implemented by Procedure 8.3.63 + (10:43:01, 8 January 2025)
- GO2-90-187, Monthly Operating Rept for Oct 1990 for Washington Nuclear Plant 2 + (10:43:02, 8 January 2025)
- ML17286A429 + (10:43:04, 8 January 2025)
- IR 05000397/1990023 + (10:43:06, 8 January 2025)
- ML17286A422 + (10:43:07, 8 January 2025)
- TAC:76314 + (10:43:07, 8 January 2025)
- GO2-90-184, Discusses Util Equipment Setpoint Methodology Program.Harsh Environ Calculations Delayed Until 910601 + (10:43:08, 8 January 2025)
- ML17286A420 + (10:43:08, 8 January 2025)
- GO2-90-182, Forwards Status Rept on commerical-grade Dedication Process, Per Commitment in Response to Insp Rept 50-397/89-21 + (10:43:10, 8 January 2025)
- ML17286A409 + (10:43:12, 8 January 2025)
- IR 05000397/1990016 + (10:43:15, 8 January 2025)
- TAC:77654 + (10:43:16, 8 January 2025)
- ML17286A401 + (10:43:17, 8 January 2025)