Advises That Action for Generic Ltr 89-08, Erosion/ Corrosion Induced Pipe Wall Thinning, Closed,Per Util
ML17286A495
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/12/1990
From: Eng P
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
GL-89-08, GL-89-8, TAC-73563, NUDOCS 9012130223
Download: ML17286A495 (4)


Text

December 12, 1990 Docket No. 50-397 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System 3000 George Washington Way P. 0.

Box 968 Richland, Washington 99352 9012130223 901212 PDR ADOCK 05000397 P

PDC 'i

Dear Mr. Sorensen:

SUBJECT:

LICENSEE CONFIRMATION OF ITS RESPONSE TO GENERIC LETTER 89-08, "EROSION/CORROSION -

INDUCED PIPE WALL THINNING" (TAC NO. 73563)

By letter dated July 20, 1989 (G02-89-122),

Washington Public Power Supply System responded to Generic Letter (GL) 89-08, "Erosion/Corrosion - Induced Pipe Wall Thinning."

In your response, you confirmed that a long term erosion/

corrosion monitoring program has been implemented at your facility.

You also stated that you will generally inspect items estimated to violate the design minimum wall thickness two years before the projected end of life instead of three years as previously stated.

Staff review revealed that this practice meets the intent of the GL.

The licensing action for this matter is considered closed.

Sincerely, Original signed by Patricia L. Eng, Project Manager Project Directorate V

Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION PD5 Reading flVirgilio PEng ACRS (10)

SKosci e lny RZimmerman, RV NRC

& Local PDRs BBoger DFoster EJordan FWitt PD5 Plant File OFC DATE

LA PD5/D
DFoster

/9 345 ~PM PD5/D 3

5

D PD5 DRP345 W
PEng:s
JOyer ~
P-/// /90

)+/g /90 0

Document Name:

WNP 2 TAC 73563 1

t U

e I

V Ib k

\\

ll

Hr. G. C. Sorensen Washington Public Power Supply System WPPSS Nuclear Project No. 2 (WNP-2)

CC:

Mr. J.

W. Baker WNP-2 Plant Manager Washington Publ'ic Power Supply System P.O.

Box 968, MD 927M Richland, Washington 99352 G. E.

C. Doupe, Esq.

Washington Public Power Supply System 3000 George Washington Way P. 0.

Box 968 Richland, Washington 99532 Mr. R.

G. Waldo, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, MD 956B

Richland, Washington 99352 Mr. A. Lee Oxsen, Acting Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, MD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 280 Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Conmission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners P. 0.

Box 190

Prosser, Washington 99350-0190 Mr. R.

C. Sorensen U. S. Nuclear Regulatory Commission P. 0.

Box 69 Richland, Washington 99352 Nicholas S. Reynolds, Esq.

Winston 8 Strawn 1400 L Street, N.W.

Washington, D.C.

20005-3502

4