Forwards SALP Rept 50-397/90-23 for June 1989 to Aug 1990. Weaknesses Noted in Areas Including,Preventive Maint Program,Procedure Quality & Corrective Actions Associated W/ Emergency Preparedness & Security Areas
ML17286A422
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/08/1990
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17286A424 List:
References
NUDOCS 9011150196
Download: ML17286A422 (5)


See also: IR 05000397/1990023

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9011150196

DOC.DATE: 90/ll/08

NOTARIZED: NO

DOCKET

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

MARTIN,J.B,

Region

5 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

'MAZUR,D.W.

Washington Public Power Supply System

SUBJECT: Forwards

SALP Rept 50-397/90-23 for June

1989 to Aug 1990.

Weaknesses

noted in areas

including, preventive maint

program, procedure quality

6 corrective actions associated

w/

emergency

preparedness

& security areas.

DISTRIBUTION CODE:

IE40D

COPIES

RECEIVED:LTR j

ENCL +

SIZE:

TITLE: Systematic

Assessment

of Licensee

Performance

(SALP) Report

NOTES:

RECIPIENT

ID CODE/NAME

PD5 LA

ENGPP.L.

INTERNAL: ACRS

AEOD/DSP/TPAB

DEDRO

NRR/DLPQ/LHFB11

NRR/DOEA/OEAB11

NRR/DREP/PRPB11

NRR/DRIS/RSIB9A

NUDOCS-ABSTRACT

OGC/HDS2

RGN5

FILE

01

EXTERNAL: EG&G/BRYCE,J.H.

NRC PDR

COPIES ".,

LTTR ENCL

1

0

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PD5

PD

AEOD/DOA

COMMISSION

NRR SHANKMAN,S

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9D

NRR/DRIS/RSGB9D

NRR/PMAS/ILRB12

OE

G FILE

2

L ST LOBBY WARD

NSIC

COPIES

LTTR ENCL

1

1

1

1

5

5

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

31

ENCL

30

<I,H Afg>

Wp0

"~ ~c

k**y+

Docket No. 50-397,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

November 8,

1990

"(i

Washington Public Power Supply System

P.

0.

Box 968

Richland, Washington

99352

Attention:

Mr.

D.

W. Mazur

Managing Director

Gentlemen:

Subject:

Systematic

Assessment

of Licensee

Performance

(SALP)

The NRC's Systematic

Assessment

of Licensee

Performance

(SALP) Board has

completed its periodic evaluation of the performance of your Washington

Nuclear Project

No.

2 (WNP-2) facility for the period June 1,

1989 through

August 31,

1990.

The performance of WNP-2 was evaluated

in the functional areas

of Plant

Operations,

Radiological Controls, Maintenance/Surveillance,

Emergency

Preparedness,

Security,

Engineering/Technical

Support,

and Safety

Assessment/equality

Verification.

The criteria used in conducting this

assessment

and the

SALP Board's evaluation of your performance

in these

functional areas

are contained in the enclosed

SALP report.

Overall, the

SALP Board found your performance

to be generally

good and

directed

toward safe facility operation.

Your performance

in most areas

was

judged to have

improved over the previous period, with a Category

1 rating

assigned

to Plant Operations

and Safety Assessment/equality

Verification.

No

area

was assigned

a Category

3 rating.

However,

as discussed

in the enclosed

report, your attention is still needed

to ensure

timely and effective

completion of improvement programs

you have initiated.

The principal concerns

of the

SALP Board and of NRC management

involve

(1) weaknesses

in your preventive maintenance

program,

(2) procedure quality

and adherence

in several

areas,

and (3) lagging corrective actions associated

with the Emergency

Preparedness

and Security areas.

Weaknesses

were also

noted that were specific to the following areas:

Radiological Controls adherence

of plant personnel

to basic radio-

logical work practices.

Maintenance/Surveillance Performance

of preventive maintenance

activities,

and maintenance

procedure quality and adherence,

Engineering/Technical

Support -- workload and training of the Plant

Technical staff.

November 8,

1990

In addition,

an inspection of your- Emergency. Operating

Procedures

(EOP)

shortly after the end of the assessment

period found that your

verification'nd

validation program for

EOPs

was weak.

Due to the importance of the

EOPs,

this area

deserves

your prompt

attention.'n

overview of this assessment

is provided in Section II of the enclosed

report.

Strengths,

weaknesses,

and Board recommendations

are provided in

Section IV, Performance

Analysis.

Based

upon discussions

with your staff,

a management

meeting to discuss

the

results of the

SALP Board's

assessment

has

been

scheduled for November 28,

1990.

Arrangements for this meeting will be discussed

further with your staff

in the near future.

Since

no functional area

was assessed

Category

3,

a written response

to the

enclosed initial report is not required.

However, you may submit comments

on

the enclosed report, if desired, within 30 days after the

November 28,

1990

meeting.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosed

SALP report will be placed in the NRC's Public Document

Room,

as well as

any

comments

you.may wish to 'submit to the

NRC regarding the content of the

SALP

report.

The NRC's Office for Analysis and Evaluation of Operational

Data performed

an

assessment

of Licensee

Event Reports

submitted for WNP-2.

This assessment

was

provided

as

an input to the

SALP process;

a copy is therefore

included

as

an

attachment

to the enclosed

report.

Should you have

any questions

concerning

the enclosed

SALP report,

we will be

pleased

to discuss

them with you.

Sine

ely,

Enclosures:

SALP Report

No. 50-397/90-23

J.

B. Martin

Regional

Administr ator

cc w/enclosure:

A.

L. Oxsen,

Deputy Managing Director

G.

D. Bouchey, Director, Assurance

and Licensing

J.

W. Baker,

WNP-2 Plant Manager

A.

G. Hosier,

WNP-2 Licensing flanager

G.

E.

Doupe,

Esq.

M.

H. Philips, Esq.,

Winston and Strawn

State of Washington

INPO

November 8,

1990

bcc w/enclosure:

~ Chairman Carr

. Commissioner

Rogers

Commissioner Curtiss

Commissioner

Remick

J. Taylor,

EDO

J. Sniezek,

EDO

.

M. Slosson,

EDO

,- T. Murley,

NRR

, J. Lieberman,

OE

DCS

PDR

LPDR

bcc w/o enclosure:

LFMB

Maurine Smith

B. Faulkenberry

G.

Cook

G. Grant,

NRR

N. Western

SALP File

Docket File

P. Prescot,

NRR

SALP Board Members

J.

Dyer,

NRR

Re i

V

0

X

10/2k/90

PJ

n

n

10/L"/90

KP4 5

SRichards

)i /q/90

RScarano

g ///90

pp gk

J.oOP

J

MVirgilio, NRR

(( / S/90

EST

COPY

EST

COPY

ES /

NO

YES /

NO

K erk'

90

RZimmerman

/

/90

REQUEST

COPY

REQUEST

COPY

YES

NO

YES

/.

N

'E

COPY

UEST

COPY

/

NO

YES /

NO

JM

jf

/90

REQUEST

COPY

YES

NO

N

TO

PDR

ES /

NO

REQUEST

C

PY

YES /

NO

-3-

November 8,

1990

bcc w/enclosure:

Chairman Carr

Commissioner

Rogers

Commissioner Curtiss

Commissioner

Remick

J. Taylor,

EDO

J. Sniezek,

EDO

M. Slosson,

EDO

T. Murley,

NRR

J.

Lieberman,

OE

DCS

PDR

LPDR

bcc w/o enclosure:

LFMB

Maurine Smith

B. Faulkenberry

G.

Cook

G. Grant,

NRR

N. Western

SALP File

Docket File

P. Prescott,

NRR

SALP Board Members

J.

Dyer,

NRR

Region

V

DProulx

/

/90

cb)>

~

CW

PJohnson

/

/90

SRichards

/

/90

RScarano

MVirgilio, NRR

II / b/90

~

/

/90

REQUEST

COPY

REQUEST

COPY

REQUEST

COPY

EST

COPY

REQUEST

COPY

YES /

NO

YES /

NO

YES

NO

YES /

NO

YES /

NO

KPerkins

/

/90

E

UEST

COPY

ES /

NO

RZimmkfian

JMartin

II /7/90

/

/90

RE

UEST

COPY

REQUEST

COPY

NO

YES /

NO

S

TO PDR

YES /

NO