ML17286A448
| ML17286A448 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/20/1990 |
| From: | Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Oxsen A WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17286A446 | List: |
| References | |
| NUDOCS 9011290185 | |
| Download: ML17286A448 (6) | |
Text
Docket No. 50-3970, UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE'210 WALNUTCREEK, CALIFORNIA94596 November 20, 1990 Hashington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Attention:
Mr. A. L. Oxsen Deputy Managing Director Gentlemen:
Subject:
Management Meeting This will confirm the telephone discussion on November 19, 1990 between Mr. P. Johnson of this office. and Mr. G. Sorensen of the Supply System staff concerning a management meeting to be held between NRC and Supply System management representatives at the Supply System Headquarters office in
- Richland, ItIashingtoII at 8:d0 a.m.
on November 28, 1990.
The purpose of this meeting is to discuss the 1989-90 Systematic Assessment of Licensee Performance (SALP}, along with other issues.
A copy of the proposed agenda for this meeting is enclosed.
Also enclosed is a copy of our internal meeting notice which lists the anticipated attendees at this meeting.
Sincerely,
Enclosure:
Copy of Agenda Copy of NRC Meeting Notice cc:
See next page Div1s1on of Reactor Safety and Projects
t I,
f I
i
November 20, 1990 CC:
Nr. N. H. Philips, Esq.
Winston 5 Strawn 1200 Seventeenth
- Street, H.W.
Washington, DC 20036 Nr. G.
E.
- Doupe, Esq.
Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352 Mr. Curtis Eschels, Chai rman Energy Facility Site Evaluation Council Hail Stop PY-11 Olympia, Washington 99504 Dr.
G.
D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, ND280 Richland, Washington 99352 Mr. J.
W. Baker WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box 968, ND 927M
- Richland, Washington 99352
ll
Enclosure 1
SALP MANAGEMENT MEETING WASHINGTON PUBLIC POWER SUPPLY'SYSTEM November 28, 1990 AGENDA 1.
Opening
- Remarks, Purpose of Conference J.
B. Martin, Regional Administrator,. and D.
W. Mazur, Supply System Managing Director 2.
Discussion of NRC Systematic Assessment of Licensee Performance (SALP),
for June 1,
1989 through August 31, 1990.
"a.
Overview J.
B. Martin, Regional Administrator b.
Review of SALP Assessment -- S.
A. Richards, Chief, Reactor Projects Branch Plant Operations Maintenance/Surveillance Engineering/Technical Support Safety Assessment/equality Yerificatfon c.
Review of SALP assessment
-- F. A. Wenslawski, Deputy Director, Division of Radiation Safety and Safeguards Radiological Controls Emergency. Preparedness Security d.
Summation -- J.
B. Martin, Regional Administrator e.
Comments by tne Washington Public Power Supply System 3.
Briefings by the Washington Public Power Supply System High Pressure Core Spray (HPCS) system socket weld cracks - assess-ment and corrective actions.
Recent isolations of normal supply to the Containment Instrument Air system (LERs 90-18, 90-22, and 90-23).
4.
Closing remarks
t 1
à fl