Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17286A734 + (10:39:15, 8 January 2025)
- ML17286A733 + (10:39:16, 8 January 2025)
- TAC:74086 + (10:39:16, 8 January 2025)
- 05000397/LER-1990-022, :on 900930,pressure Decrease Occurred in Containment Instrument Air Sys When Nitrogen Cryogenic Tank Was Inadvertently Depleted.Containment Nitrogen Inerting Procedures PPM 2.3.1 & 2.3.7 Revised + (10:39:18, 8 January 2025)
- IR 05000397/1991007 + (10:39:23, 8 January 2025)
- ML17286A730 + (10:39:25, 8 January 2025)
- GO2-91-074, Advises of Delay of Up to 1 Wk for Beginning of 1991 Maint & Refueling Outage.Delay Necessitated by Request from BPA That Unit Remain on Line Due to Regional Power Needs. Shutdown Currently Scheduled for week-end of 910419 + (10:39:26, 8 January 2025)
- ML17286A728 + (10:39:26, 8 January 2025)
- GO2-91-083, Submits Addl Info Re 910228 Application for Amend to License NPF-21,changing Tech Spec Safety Limit for Thermal Power, High Pressure & High Flow + (10:39:28, 8 January 2025)
- TAC:79884 + (10:39:28, 8 January 2025)
- IR 05000397/1991009 + (10:39:31, 8 January 2025)
- ML17286A720 + (10:39:32, 8 January 2025)
- GO2-91-068, Monthly Operating Rept for Mar 1991 for Washington Nuclear Plant 2 + (10:39:33, 8 January 2025)
- ML17286A717 + (10:39:34, 8 January 2025)
- GO2-91-081, Forwards Amend to Tech Specs Providing Additions &/Or Deletions to Paragraph 6.9.3.2 of Insert B,Including Explanation of Reasons for Each Change,Per NRC Project Manager Request + (10:39:35, 8 January 2025)
- ML17286A713 + (10:39:37, 8 January 2025)
- IR 05000397/1990011 + (10:39:41, 8 January 2025)
- ML17286A706 + (10:39:42, 8 January 2025)
- ML17286A699 + (10:39:42, 8 January 2025)
- GO2-91-067, Lists Actions to Be Taken During Refueling Outage,Scheduled to Begin on 910413,to Ensure Safety of Plant Operations.Four Shift Rotations Will Be Utilized During Outage While Shutdown in Operational Modes 4 & 5 + (10:39:43, 8 January 2025)
- GO2-91-072, Comments on Reactor Operator Written Exam Administered on 910405 & Advises of Two Correct Answers for Question 089 + (10:39:45, 8 January 2025)
- ML17286A696 + (10:39:47, 8 January 2025)
- ML17286A695 + (10:39:48, 8 January 2025)
- ML17286A694 + (10:39:49, 8 January 2025)
- ML17286A693 + (10:39:50, 8 January 2025)
- GO2-91-065, Forwards Remediation Program Outline for Control Room Supervisor on Crew & Shift Manager on Crew B + (10:39:51, 8 January 2025)
- GO2-91-066, Suppls 880208 Response to Generic Ltr 87-05 Re Assessment of Measures to Mitigate &/Or Identify Potential Degradation of Containment.Weekly Surveillance on Six of Eight Sand Pocket Drains Will Be Discontinued + (10:39:52, 8 January 2025)
- GO2-91-064, Application for Amend to License NPF-21,requesting Battery Load Profiles Utilized to Verify Operability Re Tech Spec Surveillance Requirements 4.8.2.1.d.2 Be Relocated to FSAR + (10:39:54, 8 January 2025)
- ML17286A690 + (10:39:54, 8 January 2025)
- 05000397/LER-1990-030, :on 901117,discovered That Outboard RCIC Turbine Steam Supply Isolation valve,RCIC-V-8 Returned to Svc W/Unacceptable Stroke Time Due to Inadequate Procedures. Valve RCIC-V-8 Stroke Time Changed + (10:39:57, 8 January 2025)
- ML17286A686 + (10:39:58, 8 January 2025)
- ML17286A685 + (10:39:59, 8 January 2025)
- ML17286A683 + (10:40:00, 8 January 2025)
- GO2-91-062, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-01 on 910122-25.Corrective Actions:Tech Spec Change Request Submitted to Remove Scram Accumulator Check Valve Surveillance & Acceptance Criteria Procedure Revised + (10:40:01, 8 January 2025)
- ML17286A679 + (10:40:04, 8 January 2025)
- ML17286A680 + (10:40:04, 8 January 2025)
- ML17286A677 + (10:40:06, 8 January 2025)
- ML17286A678 + (10:40:06, 8 January 2025)
- GO2-91-054, Suppl to 910228 Application for Amend to License NPF-21, Revising Tech Spec Safety Limits for Thermal Power,High Pressure & High Flow + (10:40:07, 8 January 2025)
- ML17286A676 + (10:40:07, 8 January 2025)
- GO2-91-057, Requests Deferral of Remaining Annual Operator Requalification Exams in Order to Complete Listed Actions in Response to Weaknesses/Deficiencies Noted in Licensed Operator Requalification Program + (10:40:09, 8 January 2025)
- GO2-91-055, 1990 Annual Environ Operating Rept + (10:40:10, 8 January 2025)
- GO2-91-053, Submits Annual Reporting Requirement Level of Financial Protection for 1991 + (10:40:12, 8 January 2025)
- GO2-91-051, Responds to NRC Re Violations & Deviations in Insp Rept 50-391/90-31.Corrective Actions:Bearing Will Be Disassembled & Inspected & Evaluation Performed to Determine Feasibility of Design Change + (10:40:14, 8 January 2025)
- GO2-91-044, Resubmitted Forwarding Ltr for WNP-2 Annual Operating Rept 1990. Original Ltr Undated + (10:40:16, 8 January 2025)
- ML17286A665 + (10:40:17, 8 January 2025)
- GO2-91-046, Monthly Operating Rept for Feb 1991 for Washington Nuclear Plant 2 + (10:40:18, 8 January 2025)
- ML17286A663 + (10:40:19, 8 January 2025)
- GO2-91-049, Application for Amend to License NPF-21 Revising Tech Spec 3/4.3.2 & Table 4.3.2.1-1 Re Isolation Actuation Instrumentation & Surveillance Requirements + (10:40:20, 8 January 2025)
- GO2-91-052, Forwards Justification for Continued Plant Operation W/ Unsatisfactory Licensed Operator Requalification Program,Per 910312 Meeting W/Nrc.Individuals & Crews Who Failed Util or NRC Exam Removed from Licensed Duties + (10:40:23, 8 January 2025)
- TAC:75738 + (10:40:24, 8 January 2025)