ACCELERATED DISTRIBUTION DEMOI"RATION SYSTEM
'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9104020161 DOC.DATE: 91/03/22 NOTARIZED-NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION OXSEN,A.L.
Washington Public Power Supply. System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.
Region 5 (Post 820201)
SUBJECT:
Submits action actions taken to ensure safe operation of plant,per 910321 S
22 operational evaluation.
DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR g ENCL Q SIZE:
TITLE: Operator Licensing Examination Reports NOTES:
RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS NRR/DLPQ/WHF REG EXTERNAL: NRC PDR COPIES'TTR ENCL 1
1 2
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME ENG,P.L.
NRR SHANKMAN,S NRR/DLPQ/LOLB10 RGN5 FILE 01 NSIC COPIES LTTR ENCL
'1 1
1 1
1 1
1 1
R D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11 A
D D
ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96B
~ 3000 George Washington Way
~ Richland, Washington 99352 March 22,1991 Docket No. 50-397 JB Martin Regional Administrator United States Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
Subject:
Basis for Continued Operation for WNP-2 Following Operational Evaluation Conducted on March 21,22 1991 On March 14,1991, the Supply System submitted to you a Basis for Continued Operation following the failure of our Licensed Operator Requalification Program.
On March 21st and 22nd, an Operational Evaluation of our four operating crews was conducted.
One of the four crews (Crew B) failed the evaluation.
In addition, three individuals failed during the evaluation process.
The Supply System has carefully evaluated the basis for continued operation with three qualified crews-until our scheduled shutdown for refueling the weekend of April 12,1991.
P The followingactions have been taken to ensure the continued safe operation ofWNP-2.
This document has been reviewed with Senior Supply System Management and has received Plant Operating Committee review and approval.
The three individuals that failed the evaluation have been removed from all licensed duties.
They will not be returned to licensed duties until they have successfully completed an NRC approved Requalification Examination, similar to the process anticipated for the previous requalification examination failures.
2.
We have created a three-shift rotation comprised of licensed operators who have successfully demonstrated their abilities during the recent NRC Operational Evaluation, The crews willwork twelve hour shifts as outlined in Attachment 1.
We willcontinue to comply with the overtime requirements specified in the WNP-2 Plant Technical Specifications. The Reactor Operator replacing the Reactor Operator who failed on Crew E has been evaluated by the NRC as a qualified replacement.
910P0~01 05000397 910322 pDF; ADOCK pD~
V
J.B. Martin U.S. Nuclear Regulatory Commission March 22, 1991 Page 2 of 2 3.
We have provided additional support to the operating crews while we are in this operational condition. Specifically, as of March 23,1991, we will add an additional Senior Reactor Operator to the control room staff to provide for additional shift oversight during normal operation and for emergency flow chart support during emergency conditions. In addition, the on site STA described in our previous BCO willnow be assigned to the Control Room (as contrasted with our previous assignment of capable of responding to the control room in 10 minutes). This shift manning is depicted in Attachment 2.
4.
A remediation program for the Control Room Supervisor on Crew E and the Shift Manager on Crew B willbe developed, submitted to the NRC and executed with.
final examination by March 29, 1991.
Our management over-sight of control room activities described in our previous BCO willbe expanded'to include the new elements presented here. It willalso be expanded to ensure back shift coverage of shift activities.
The Supply System is confident that it can maintain safe operation ofWNP-2 with these administrative controls until our upcoming refueling outage in three weeks.
Our three shifts are comprised of experienced operators who have completed recent team command and control training and extensive evaluation.
Our control room man'ning is being augmented by an additional Senior Reactor Operator for shift over-sight and accident management ifnecessary.
In addition, we have expanded the role of the Shift Technical Advisor by increasing his presence in the control room at all times.
Our management and Quality Assurance oversight of control room activities willcontinue. Ifduring these over-sight tours we determine that the capabilities of our control room staff are-jeopardized, we willtake immediate steps to shut down the unit.
The Supply System willcontinue to evaluate the root cause for these license failures.
We expect to maintain a high level of communication with your office as we conclude our evaluation.
Sincerely,
. Lee Oxsen Deputy Managing Director (MD 387)
Attachment
0 11 pj CREW NAME r
C Mann Estes Henderson Blake Hughes
'amos ATTACHMENT 1 OPERATIONS SHIFT SCHEDULE CREW NAME Hancock Zimmerman Strote Nelson Hlavaty Lambel (Ex)
D Langdon Rockey Hendrick Gregory Woods Moore (Ex)
Extra Shaeffer Merhar Baird Rambo Prescott Westergard Gallagher Note Crew Date (Ex) personnel are not qualified Starting Saturday 3/23/91, staff an extra,SSS to allow bringing the SRO qualified SSS to the control room.
Sat Sun Mon Tue Wed Thu Fri 23 24 25 26 27 28 29 D
E C
D D
D X
X X
G G
G G
G G
G X
X X
X D
D D
D Date D
E C
30 31 1
2 3
G G
G G
G X
X D
D D
D D
X X
X 4
5 X
X D
D G
G Date 6
7 8
9 10 11 12 D
E C
X D
D, D
D D
X X
X G
G G
G G
X D
D G
G X
X Date 13 14 D
E C
X X
G G
D D
0 ATTACHMENT 2
Current BFO, Four Shift'otation SM CRS S]'A onsite STA RO RO Extr a NQ RO Revised BFO, Three Shift rotation Note 2
Extr a SRO SM CRS STA STA on call Note 1
RO RO Extra NQ RO Note 1 - STA will be assigned to the Control Room Note 2 - Extra SRO assigned to the Control Room to assist in shift oversight/accident management