Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291B202 + (09:30:45, 8 January 2025)
- ML17291B200 + (09:30:46, 8 January 2025)
- ML17291B198 + (09:30:47, 8 January 2025)
- GO2-96-010, Provides Response to GL 94-03, Integranular Stress Corrosion Cracking of Core Shrouds in Bwrs + (09:30:48, 8 January 2025)
- IR 05000397/1995029 + (09:30:50, 8 January 2025)
- ML17291B195 + (09:30:51, 8 January 2025)
- GO2-96-008, Monthly Operating Rept for Dec 1995 for WNP-2 + (09:30:52, 8 January 2025)
- GO2-96-005, Informs That Go Smith Became Plant Manager,Effective 951221.JH Swailes Formerly Plant General Manager,Assigned Position of Director,Engineer + (09:30:53, 8 January 2025)
- PNO-IV-94-022, on 940426,manual Reactor Trip Occurred Due to Recirculation Flow Cycling.Licensee Plans to Remain Shutdown & Begin Refueling Outage 8 That Was Planned to Start 940429 + (09:30:56, 8 January 2025)
- ML17291B191 + (09:30:57, 8 January 2025)
- GO2-95-285, Informs NRC of Changes to Commitments Pertaining to Maint Procedure Update Program + (09:30:58, 8 January 2025)
- ML17291B187 + (09:30:58, 8 January 2025)
- ML17291B184 + (09:31:00, 8 January 2025)
- ML17291B182 + (09:31:01, 8 January 2025)
- ML17291B181 + (09:31:02, 8 January 2025)
- ML17291B179 + (09:31:03, 8 January 2025)
- GO2-95-282, Requests Approval for Use Alternative to ASME Boiler & Pressure Vessel Code Requirements for Exam of Longitudinal Welds in Class 1 & 2 Piping + (09:31:04, 8 January 2025)
- GO2-95-281, Provides Suppl Info Re Relief Request for Temporary non-code Repair of Standby Svc Water Piping,Per GL 90-05 + (09:31:05, 8 January 2025)
- GO2-95-277, Reactor Power Uprate Startup Test Rept, for WNP-2 + (09:31:06, 8 January 2025)
- ML17291B171 + (09:31:08, 8 January 2025)
- GO2-95-275, Forwards Proposed Alternative Exams for 10CFR50.55a(g)(6), Augmented Exam of Rv & Requests That Proposed Alternate to 10CFR50.55a(g)(6) Be Accepted as Revised Relief Request 2-ISI-001 for First 10-yr ISI Interval + (09:31:09, 8 January 2025)
- GO2-95-274, Withdraws Request for Amend to TS to Relocate Component Lists in Accordance W/Gl 91-08 & Selected Implementation of Commissions Policy Statement on TS Improvements + (09:31:10, 8 January 2025)
- GO2-95-283, Provides Supplemental Info Re Water Level Calculation in Retran Model + (09:31:12, 8 January 2025)
- GO2-95-271, Forwards Second 10-Yr ISI Program Plan Relief Request for Exam Category B-F + (09:31:13, 8 January 2025)
- GO2-95-272, Responds to NRC Re Violations Noted in Insp Rept 50-397/95-29.Corrective Actions:Valve Tested & Degraded. Exercising Frequency for RCIC-V-28 Increased from Weekly to daily.RCIC-V-28 Replaced W/Swing Type Check Valve + (09:31:15, 8 January 2025)
- IR 05000397/1995020 + (09:31:17, 8 January 2025)
- GO2-95-269, Responds to NRC Re Violation Noted in Insp Rept 50-397/95-30 on 950925-28.Corrective Actions:Door C-115 & Similar Doors Modified to Incorporate Fixed Hasps Through Which Padlocks Used to Lock Doors + (09:31:18, 8 January 2025)
- ML17291B163 + (09:31:19, 8 January 2025)
- ML17291B162 + (09:31:20, 8 January 2025)
- GO2-95-268, Forwards Rev 9 to Procedure Qci 6-4, Ultrasonic Exam Feedwater Nozzle Inner Radii, Per NUREG-0619 + (09:31:21, 8 January 2025)
- TAC:M91352 + (09:31:23, 8 January 2025)
- ML17291B159 + (09:31:23, 8 January 2025)
- ML17291B157 + (09:31:24, 8 January 2025)
- GO2-95-264, Monthly Operating Rept for Nov 1995 for WNP-2 + (09:31:25, 8 January 2025)
- ML17291B156 + (09:31:25, 8 January 2025)
- ML17291B151 + (09:31:27, 8 January 2025)
- GO2-95-254, Washington Public Power Supply Sys Annual Rept 1995. W/ + (09:31:28, 8 January 2025)
- IR 05000397/1995098 + (09:31:55, 8 January 2025)
- ML17291B147 + (09:31:57, 8 January 2025)
- ML17291B145 + (09:31:58, 8 January 2025)
- ML17291B144 + (09:31:59, 8 January 2025)
- GO2-95-252, Submits Annual Filing of Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor + (09:32:00, 8 January 2025)
- GO2-95-251, Responds to SALP Insp Rept 50-397/95-99 for Period 940401- 950902 + (09:32:03, 8 January 2025)
- ML17291B140 + (09:32:07, 8 January 2025)
- ML17291B137 + (09:32:08, 8 January 2025)
- ML17291B139 + (09:32:08, 8 January 2025)
- SBK-L-17170, Non-Proprietary Enclosure 1 to SBK-L-17156 + (09:32:10, 8 January 2025)
- ML17291B135 + (09:32:11, 8 January 2025)
- ML17291B133 + (09:32:12, 8 January 2025)
- IR 05000397/1995026 + (09:32:13, 8 January 2025)
- ML17291B127 + (09:32:14, 8 January 2025)