ML17291B187
| ML17291B187 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/29/1995 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 9601040279 | |
| Download: ML17291B187 (5) | |
See also: IR 05000397/1995030
Text
1
~pS RECII~
Wp0
~ ~i
Q
1
(4
+***"
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R EG I ON IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
DEC 2 9 l995
Washington Public Power Supply System
ATTN:
J.
V. Parrish.
Vice President
Nuclear Operations
3000 George Washington
Way
P.O.
Box 968.
MD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-30
Thank you for your letter of December
12 '995 'n response
to our
letter and Notice of Violation dated
November
14.
1995.
We have reviewed your
reply and find it responsive to the concerns
raised in our Notice of
Violation.
We will review the implementation of your corrective actions
during
a future inspection to determine that full compliance
has
been achieved
and will be maintained.
Sincerely.
~<~g~gcr~
TP mas
P.
wynd Director
Wivis ion of Reactor
Sa fety
Docket:
50-397
License:
CC:
Washington Public Power Supply System
ATTN:
J.
H.
Swai les.
WNP-2 Plant Manager
P.O.
Box 968.
MD 927M
Richland.
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George Washington
Way
P.O.
Box 968.
MD 396
Richland.
99352-0968
9601040279
951229
ADOCK 05000397
8
Washington Public Power Supply
System
-2-
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair. Chairman
P.O.
Box 43172
Olympia. Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swanky
WNP-2 Licensing Manager
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Washington Public Power
Supply System
ATTN:
P.
R.
Bemis. Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Mail Drop PEZO)
Richland.
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser.
99350-0190
Winston
& Strawn
ATTN:
M. H. Phi lips.
Esq.
1400
L Street.
N.W.
D.C.
20005-3502
Washington Public Power Supply
System
-3-
bcc to DNB (rE01) ~ii
bcc distr ib. by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E.
WCFO)
Senior Project Inspector
(DRP/E.
WCFO)
Leah Tremper
(OC/LFDCB.
MS:
TWFN 9E10)
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
H.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:tWN530AK,LTR
To receive copy of document, indicate in box: "C" a Copy without enclosures
"E" ~ Copy with enciosures "N" ~ No copy
RS:PSB
LTRicketson:c
12/@ /95
C:PSB
BMurray
12/
/95
D:DRSi
TPGwynn
12~95
'L
PBE:DRP
HWon
12/+ /95
':DRS
TPGwynn ',
12/-
/95.
Washington Public Power Supply
System.
-3-
bcc to
DMB ( IE01)
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:~WN530AK.LTR
To receive copy of document, indicate in box: "C"
Copy wi hout encl sures "E"
Copy with enclosures "N" a No copy
RS:PSB
LTRicketson:c
12/
/95
C:PSB
BMurray
12/
/95
0:DRS
TPGwynn
12
95
PBE:DRP
HWong
12/af/95
0: DRS
TPGwynn
.
12/ C /95'