Text
CATEGORY 2
REGUL'ATOINFORMATION
DISTRIBUTION 'TEM
(RIDE)
ACCESSIOM NBR:9512290331
DOC.DATE: 95/12/26
NOTARIZED: NO
DOCKET I
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
UTH.NAME
AUTHOR AFFILIATION
ER,J.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/95-31
on 951015-1125
& notice of
violation.Violation of NRC concern
due because it indicates
~
continuing weakness
in radiation protection practices
at
WNP-2.
DISTRIBUTION CODE:
IEOZD
COPIES
RECEIVED:LTR Q ENCL I
SIZE: 5 +
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
RNAL: LITCO BRYCE,J
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIB
P'NTER
ARRI'URGE'f
B
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US
TO REDUCE WASTE)
CONTACT THE DOCUMENT CONTROL DESK,
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS FOR
DOCUMENTS YOU DON'T NEEDl
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
UNIT E O STAT ES
C LEAR R EG ULATORY COMMISSI
, REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON. TEXAS 76011 8064
ore 26 895
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-31
This refers to the inspection
conducted
by Messrs.
R.
C. Barr,
G.
W. Johnston,
and
Ms. J.
L. Dixon-Herrity of this office on October
15 through
November
25,
1995, at the Washington Nuclear Project-2 facility.
The purpose of the
inspection
was to determine
whether activities authorized
by the license
were
conducted
safely
and in accordance
with NRC requirements.
At the conclusion
of the inspection,
the findings were discussed
with you and those
members of
your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
the
NRC has determined that one
violation of NRC requirements
occurred.
The violation is cited in the
enclosed
Notice of Violation (Notice)
and the circumstances
surrounding it are
described
in detail
in the subject inspection report.
The violation is of
concern
because it indicates
continuing weakness
in radiation protection
practices
at WNP-2.
You are required to respond to this letter
and should follow the instructions
specified
in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
addresses
the required response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further .NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter, its enclosure(s),
and your response will be placed
in the
NRC
Public Document
Room
(PDR).
To the extent possible,
your response
should not
include
any personal
privacy, proprietary,
or safeguards
information so that
it can
be placed in the
PDR without redaction.
ciI5i229033i 95i226
ADOCK 0500039'7
8
Washington Public
Power Supply
System
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Docket:
50-397
License:
Enclosures:
1.
2.
NRC Inspection
Report
50-397/95-31
J.
E. Dyer, Director
Division of Reactor Projects
cc w/enclosures:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Manager
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Washington Public
Power Supply
System
Washington Public
Power Supply System
ATTN:
P.
R.
Bemis, Direct'or
Regulatory
and Industry Affairs
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
8 Strawn
ATTN:
M. H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply
System
DEC 26 $95
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
- " bcc to
DMB (IE01) i
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
Senior Project
Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
To receive copy of document, indicete in boxt "C
e Copy without enclosures
"E
~ Copy with enclosures "N" = No copy
RI V:SRI: DRP/E
RCBarr
12// 5795
C:DRP/E
HJWong
12&) /95
D:DRP
JEDyer
12/Q /95
0
C A
CO
Co
12/
/95
12/
/95
Washington Public Power Supply
System
DEC 2B $95
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
( IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector"(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV Fi1 e
Branch Chief (DRP/TSS)
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
To receive copy of document, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
RIV:SRI: DRP/E
RCBarr
12//095
C:DRP/E
HJWong 0
12P5"/95
D:DRP
JEDyer
12/gCp/95
CO
0
12/
/95
12/
/95