January 22, 1996 Mr. J.
V. Parrish (Mai Drop 1023)
Vice President Nuclear Operations 3000 George Washington Way Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968
SUBJECT:
REVISED SAFETY EVALUATION FOR APPROVAL OF TOPICAL REPORT FTS-131, "APPLICATIONS TOPICAL REPORT FOR BWR DESIGN AND ANALYSIS," FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)
NUCLEAR PROJECT NO.
2 (WNP-2)
(TAC NOS.
M81723 AND M94055)
Dear Mr. Parrish:
By letter dated October 12,
- 1994, we issued a safety evaluation (SE) that approved FTS-131 with seven conditions.
By [[letter::GO2-95-169, Documents Util Understanding of Conditions Specified in NRC SER for TR WPPSS-FTS-131, Applications TR for BWR Design & Analysis,|letter dated August 28, 1995]], the Supply System documented its understanding of certain conditions in the SE.
Following a conference call on September 15, 1995, the Supply System provided by letter dated December 21, 1995, additional information to address SE condition six.
The additional information provided the basis for the Supply System's conclusion that the water level model used for analyses using the methods in FTS-131 was conservative compared to Siemens Power Corporation (SPC) methods for significant reactor vessel level transients.
We have completed our review of the additional information.
Our evaluation is provided in the enclosed amendment to the original SE.
The staff has concluded that the licensee adequately demonstrated that the water level prediction for feedwater controller failure transient is conservative when compared to that predicted by SPC.
The staff therefore is removing limitation and restriction six from the original SE and by extension, is removing limitation and restriction four from the technical evaluation report provided by the staff's contractor.
This completes our work on TAC No. M94055.
Please contact me at 301-415-1352 if you have any questions.
Sincerely, James W. Cl)tford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
SE Amendment
'c w/enclosure:
See next page DOCUMENT NAME: WNP94055.LTR DISTRIBUTION:
Docket File PUBLIC JRoe EAdensam WBateman JClifford EPeyton ACRS PDIV-2 Reading
- OGC, 015B18
- KPerkins, WCFO
- JDyer, RIV
- HWong, WCFO RFrahm, Sr.,
SRXB OFC PD IV-2/LA PDIV-2/PM NAME EFey&ti JCl iAord:pk DATE l Qh/96 I /~96 OFFICIAL RECORD COPY 960i250ii3 960i22 PDR ADQCK 050003'P7 P
1 I
't
,t 1
January 22, 1996 Hr. J.
V. Parrish (Nihil Drop 1023)
Vice President Nuclear Operations 3000 George Washington Way Mashington Public Power Supply System P.O.
Box 968
- Richland, Mashington 99352-0968
SUBJECT:
REVISED SAFETY EVALUATION FOR APPROVAL OF TOPICAL REPORT FTS-131, "APPLICATIONS TOPICAL REPORT FOR BWR DESIGN AND ANALYSIS," FOR THE MASHINGTON PUBLIC POWER SUPPLY. SYSTEM (MPPSS)
NUCLEAR PROJECT NO.
2 (MNP-2)
(TAC NOS.
H81723 AND H94055)
Dear Hr. Parrish:
By letter dated October 12,
- 1994, we issued a safety evaluation (SE) that approved FTS-131 with seven conditions.
By [[letter::GO2-95-169, Documents Util Understanding of Conditions Specified in NRC SER for TR WPPSS-FTS-131, Applications TR for BWR Design & Analysis,|letter dated August 28, 1995]], the Supply System documented its understanding of certain conditions in the SE.
Following a conference call on September 15, 1995, the Supply System provided by letter dated December 21, 1995, additional informati'on to address SE condition six.
The additional information provided the basis for the Supply System's conclusion that the water level model used for analyses using the methods in FTS-131 was conservative compared to Siemens Power Corporation (SPC) methods for significant reactor vessel level transients.
Me have completed our review. of the additional information.
Ou'r evaluation is provided. in the enclosed amendment to the original SE.
The staff has concluded that the licensee adequately demonstrated that the water level prediction for feedwater controller failure transient is conservative when compared to that predicted by SPC.
The staff therefore is removing limitation and restriction six from the original SE and by extension, is removing limitation and restriction four from the technical evaluation report provided by the staff's contractor.
This completes our work on TAC No. N94055.
Please contact me at 301-415-1352 if you have any questions.
Sincerely, James W. Cl>iform, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
SE Amendment cc w/enclosure:
See next page DOCUMENT NAME: WNP94055.LTR
~OISTRIBU III Docket File PUBLIC JRoe EAdensam WBateman JClifford EPeyton ACRS PDIV-2 Reading OGC, 015818
- KPerkins, WCFO
- JDyer, RIV
- HWong, WCFO RFrahm, Sr.,
SRXB OFC NAHE DATE OFF PDIV-2/LA PDIV-2/PH EFeey
'iiPii JCli ord:pk l Q(/96 t /~96 CIAL RECORD COPY
Hr. J.
V. Parrish cc w/enclosure:
Hr. G. 0. Smith MNP-2 Plant General Hanager Mashington Public Power Supply System P. 0.
Box 968
- Richland, Mashington 99352-0968 Chief Counsel (Hail Drop 396)
Washington Public Power Supply System P.O.
Box 968
- Richland, Mashington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0. Box 43172 Olympia, Washington 98504-3172 Hr. D. A. Swank (Hail Drop PE20)
WNP-2 Licensing Hanager Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Hr. Paul R.
Bemis (Hail Drop PE20)
Director, Regulatory and Industry Affairs Washington Public Power Supply System P.O.
Box 968
'ichland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.
Box 69
- Prosser, Washington 99350-0190 Hr. R. C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 69
- Richland, Mashington 99352-0968 H. H. Philips, Jr.,
Esq.
Winston 8 Strawn 1400 L Street, N.M.
Washington, DC 20005-3502
~
l J
4 J