UNITED STATES NUCLEAR REGULATORY COMMISSIO REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 JAN -2 l996 Washington Public Power Supply System ATTN:
J.
V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.
Box 968, MD 1023
- Richland, Washington 99352
SUBJECT:
NRC INSPECTION REPORT 50-397/95-15 AND NOTICE OF'VIOLATION Thank you for your letter of August 1,
- 1995,
.in response to our letter and Notice of Violation dated July 5, 1995.
Violation 397/9515-01 pertained to a
fire watch not being present during work involving ignition sources on May 24, 1995.
In your reply, you denied that a violation occurred.
Your positio'n was based on your contention that the fire watch involved could have promptly detected and responded to the signs of an incipient fire when he was some distance away from the work area, in an adjoining area of the room at a telephone.
You also contend that the fire watch was only absent for a short period (approximately 2 minutes).
Our interpretation of your fire protection program and the National Fire Protection Association (NFPA) code applicable to these circumstances leads us to conclude that leaving the immediate area represented an inadequate fire watch in that it did not fulfill the requirement for continuous coverage.
We note that your fire protection program specified in Plant Procedures Manual 1.3. 10, "Fire Protection Program Implementation," states that during spark producing operations a "fire watch remains at the job site for 1/2 hour after the work is done."
As our inspection report describes, after observing the grinding operations with combustible polyethylene bags
- nearby, the NRC inspectors returned to the work area and did not find a fire watch posted in the area.
In as much as the NRC inspectors standing at the location where the grinding occurred could not see the firewatch in the adjoining area of the
- room, we do not accept your assertion that he met the intent for a continuous fire watch.
We also note that the fire extinguisher for the fire watch's use was located very close to the work area.
The fire watch may not have been able to get to the fire extinguisher in response to a fast developing fire had
,one occurred.
Therefore, we conclude that the requirement for a continuous fire watch in the immediate area of the work for a period of 1/2 hour was not met.
Our view is that the conditions cited in the original Notice of Violation involved important equipment (control rod drive system
- pumps, associated
- valves, and piping) with combustible material in the area of the grinding work.
- However, in view of the additional information you provided on the location and duration of absence of the fire watch, we now consider this to be a violation of minor significance.
As such, it will be treated as a noncited violation, consistent with Section IV of the NRC Enforcement Policy.
9b0llb0022 9b0102 PDR ADQCK 05000397 8
Washington Public Power Supply System Should you have any questions concerning the reclassification of this violation, please do not hesitate to call me.
Sincerely, Docket:
50-397 License:
NPF-21 mue o
ins Deputy Regional Administrator CC:
Washington Public Power Supply System ATTN:
J.
H. Swailes, WNP-2 Plant Manager P.O.
Box 968>
MD 927M
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
Chief Counsel 3000 George Washington Way P.O.
Box 968, MD 396
- Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Frederick S. Adair, Chairman P.O.
Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:
D. A. Swank, WNP-2 Licensing Manager P.O.
Box 968 (Nail Drop PE20)
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
P.
R. Bemis, Director Regulatory and Industry Affairs P.O.
Box 968 (Nail Drop PE20)
- Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190
- Prosser, Washington 99350-0190
'I Washington Public Power Supply System Winston
& Strawn ATTN:
M. H. Philips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
Washington Public Power Supply System JAN -2 f996 bcc>>,to
. DMB,(IE01) bcc distrib.
by RIV:
L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector MIS System RIV Fil e Branch Chief (DRP/TSS)
M.
Hammond (PAO, WCFO)
DOCUMENT NAME:
R:i WN2iWN515AK.DEC To receive copy of document, indicete in box: "C" ~ Copy without enclosures "E" =
with enclosures "N" a No copy RIV:C:DRP/E HJWon;df*
12/21/95 D:WCFO KEPerkins*
12/21/95 D:DRP JEDyer gyes.
12/ZS/95 DR S
Co lins
/ 6/96
- previous y concurre OFFICIAL RECORD COPY
Washington Public Power Supply System JAN -2 F996 bcc to DHB (IE01) bcc distrib.
by RIV:
L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Leah Tremper (OC/LFDCB, HS:
TWFN 9E10)
Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)
H.
Hammond (PAO, WCFO)
DOCUHENT NAHE:
R:i WN2iWN515AK.DEC To receive copy of document, indicate inbox: "C" ~ Copy without enclosures "E" ~
with enclosures "N" ~ No copy RIV:C:DRP/E HJWon ;df*
DR D:DRP D WCFO KEPerkins*
JEDyer S
Co lins 12/21/95 12/21/95 12/Zq/95
/ >/96
- previous y concurre OFFICIAL RECORD COPY