Forwards SE Approving IST Program Relief Request for Pumps & Valves Per 10CFR50.55a(f)(6)(i) & Authorizing Alternatives Per 10CFR50.55a(a)(3)(i).Associated TER Also Encl
ML17291B137
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/27/1995
From: Bateman W
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291B138 List:
References
GL-89-04, GL-89-4, NUDOCS 9512040325
Download: ML17291B137 (7)


Text

0' EIRE A

OO 0

qo

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 November 27, 1995 Hr. J.

V. Parrish (Hail Drop 1023)

Vice President Nuclear Operations 3000 George Washington Way Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968

SUBJECT:

INSERVICE TESTING PROGRAN RELIEF REGUESTS FOR PUHPS ANO VALVES WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

NUCLEAR PROJECT NO. 2 (WNP-2)

(TAC NO. H91159)

Dear Hr. Parrish:

We have completed our review of the requests for relief concerning the inservice testing (IST) program that were submitted in your letter dated December 16, 1994 (G02-94-280).

Our safety evaluation (SE) with the associated technical evaluation report (TER) is provided in the enclosure.

The staff grants relief or authorizes alternatives as discussed in the enclosure, subject to the limitations identified in Section 4 of the TER.

The staff has determined that granting relief pursuant to 10 CFR 50.55a(f)(6)(i) and authorizing alternatives pursuant to 10 CFR 50.55a(a)(3)(i) are authorized by law and will not endanger life or property, or the common defense and security and is otherwise in the public interest.

In making this determination, the staff has considered the impracticality of performing the required testing and the burden on the licensee if the requirements were

.imposed.

Please respond to the stated conditions within one year of the date of this SE describing the actions taken for actions

4. 1, 4.2, 4.4, 4.5, 4.6, and 4.7, and a commitment to comply with action 4.3.

Program changes involving new or revised relief requests should be submitted to the NRC.

Program changes that meet the positions in Attachment' to Generic Letter (GL) 89-04, "Guidance on Developing Acceptable Inservice Testing Programs,"

may be implemented provided the guidance in Section D to GL 89-04 is followed.

Program changes that add or delete components from the IST program should be periodically provided to the NRC.

POaR ADOCK 05000397 PDR

W 'la C',%~.-4w ~~r,

'ID Hr. J.

V. Parrish November 27, 1995 This completes our review of your second 10-year interval IST program plan.

If you have any questions, please contact your Project Manager, Hr. James W.

Clifford, at (301) 415-1352.

Sincerely, Original signed by:

Docket No. 50-397 cc w/encl:

See next page William H.,;Bateman,,'Director Project Directorate IV-2

Division of Reactor Projects III/IV Office of Nuclear'eactor Regulation

~.

"':DISTR IBUTION:

Docket File

Enclosure:

Safety Evaluation PUB1IC-

",> PDIV-2.,Re'ading, '~, '

',WRu'ss'el;1 /FMi'rag 1 i a RZimmerman

', ACRS, T,-2E26'

'"."~."-GHill

"(2)" '-

-'...OGC; 015B18.<

kPerkins, WCFO

~'JDyer, RIV; ".

"'Wong, WCFO JHi tchel,l,, 017G-21 II DOCUMENT NAME:

WNP91159.LTR OFC PDIV-2 PD V 2 OGC PDIV-2 D

R NAME EPeeyon DATE ll I

95 ll 95 ll /

95 11

/95 OFFICIAL RECORD COPY JC afford Egal' WBatema

l r

l I lgl CI 1

A,'

'H

>c i

I i"

h,g 1t 1

k 1

i j,l 1

C I. i II f

Hr. J. V. Parrish November 27, 1995 This completes our review of your second 10-year interval IST program plan.

If you have any questions, please contact your Project Hanager, Hr. James W.

Clifford, at (301) 415-1352.

Sincerely, Original signed by:

Docket No. 50-397

Enclosure:

Safety Evaluation cc w/encl:

See next page William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation DISTRIBUTION:

Docket File PUBLIC PDIV-2 Reading WRussell/FHiraglia RZimmerman JRoe EGAl WBateman JClifford EPeyton ACRS, T-2E26 GHill (2)

OGC, 015BIS
KPerkins, WCFO
JDyer, RIV
HWong, WCFO JHitchell, 017G-21 DOCUHENT NAME:

WNP91159.LTR OFC NAHE PDIV-2 Efeyeyon PD V

OGC PDIV-2/D R JC afford

~ac ~

WBatema DATE Il 'I /95 11

/95 ll ( /95 11

/95 OFFICIAL RECORD COPY

Mr. J.

V. Parrish cc w/encls:

Mr. J.

H. Swailes WNP-2 Plant General Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352-0968 Chief Counsel (Mail Drop 396)

Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P.

O.

Box 43172 Olympia, Washington 98504-3172 Mr. D. A. Swank (Hail Drop PE20)

WNP-2 Licensing Manager Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Mr. Paul R.

Bemis (Mail Drop PE20)

Director, Regulatory and Industry Affairs Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.

Box 69

Prosser, Washington 99350-0190 Mr. R.

C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 69

Richland, Washington 99352-0968 M. H. Philips, Jr.,

Esq.

Winston

& Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

Hr. J.

V. Parrish This completes our review of your second 10-year interval IST program plan.

If you have any questions, please contact your Project Manager, Mr. James W.

Clifford, at (301) 415-1352.

Sincerely, Docket No. 50-397

Enclosure:

Safety Evaluation cc w/encl:

See next page William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation