ML17291B127
| ML17291B127 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/22/1995 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 9512040003 | |
| Download: ML17291B127 (8) | |
See also: IR 05000397/1995099
Text
Mj.~~A J.
X
~UDOCS OFFSITE FACILITY)
REGULAT~ INFORMATION DISTRIBUTION~TEM (RIDS)
'~'CESSION NBR:9512040003
DOC.DATE: 95/ll/22
NOTARIZED: NO
DOCKET I
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
0500'0397
UTH.NAME
AUTHOR AFFILIATION
ERsJ ~ ED
Region
4 (Post
820201)
ECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Discusses
951024 meeting
re
SALP rept 50-397/95-99
issued
on
950927 for activities at plant authorized
by NRC license
NPF-21.List of meeting attendees
encl.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation
R sponse
NOTES:
P
'R
0
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
RNAL: LITCO BRYCEiJ H
NRC PDR
COPIES
LTTR ENCL
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIB
A 0
T
C
FIL
CENTER
NRR DRCH7HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
COPIES
LTTR ENCL
R
'
D
',
C
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE KVASTE!CONTACTTHE DOCUMENTCONTROL
DESk, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM
DIS'I'RIBUTIONLISTS FOR DOCUMENTS YOU DON"I NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
+gS IlEQy>
0
n0
I
X
0
+o
++**+
UNITEDSTATES
CLEAR REGULATORY COMMISSI
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
NOV 2 2]ggg
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
PUBLIC MEETING WITH WASHINGTON PUBLIC
POWER
SUPPLY
SYSTEM
ON
SYSTEMATIC ASSESSMENT
OF
LICENSEE
PERFORMANCE
OCTOBER 24,
1995
This refers to the
NRC meeting
open to public observation
conducted
on
October
24,
1995, at the Washington Public Power Supply System
(Supply System)
office, in Richland,
This meeting discussed
the Systematic
Assessment
of Licensee
Performance
(SALP) Report 50-397/95-99
which was issued
on September
27,
1995 for activities at
WNP-2 authorized
by
NRC License
and operated
by the Supply System.
Attendees
at the meeting
are listed in
Enclosure
1 to this letter.
The meeting provided
an opportunity for us to communicate
our perspectives
for
each of SALP functional
area
and our insights into the factors which
NRC
considered
when determining the
SALP ratings.
Your comments during the
meeting were beneficial in understanding
your perspectives
on the findings
discussed
in the
SALP Report.
We appreciate
your openness
and candor during
the discussions.
We will review your response
to the
SALP Report
when it is
submitted.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter will be placed in the
NRC's Public Document
Room.
Should you have
any questions
concerning this matter,
we will be pleased
to
discuss
them with you.
Enclosure:
As Stated
cc w/enclosure:
Washington Public
Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
99352-0968
Richland,
'P5i2040003 95ii22
ADQCK 05000397
6
J.
E. Dyer, Directo
Division of Reactor Projects
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George
Way
P.O.
Box 968,
HD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Hanager
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
E Strawn
ATTN:
H.
H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
3
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
Resident
Inspector
DRSS-FIPB
HIS System
'ranch
Chief (DRP/E,
WCFO)
RIV File
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
.H.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
To receivecopyof document, indicate inbox: G
Copywithou en
o
res
E'
Copy with enclosures
N
~ No copy
C:DRP
F
HJWon
11/~/95
D:WCFO
KEPerki
ll
/95
D:DRP
JEDyer
11/
/95
OFFICIAL RECORD
COPY
Qgopr ~
ENCLOSURE
1
ATTENDEES AT NRC/WPPSS
MEETING ON OCTOBER 24,
1995
NRC SALP MEETING
Washin ton Public Power
Su
l
S stem
V. Parrish,
Vice President
Nuclear Operations
P.
Bemis, Director, Regulatory
and Industry Affairs
J. Swailes,
Plant General
Manager
J.
Burn, Director, Engineering
G. Smith, Director, Quality
R. Webring, Director, Support Services
J.
Baker, Director, Training
R. Bresnahan,
Director, Information and Services
G. Denniston,
Director,
Human resouirces
D. Galloway, Director, Internal Audit
C. Schwarz,
Operations
Manager
H. Honopoli, Maintenance
Manager
J. Albers, Radiation Protection
Manager
W. Waddell, Regulatory Support
Manager
G.
Reed,
Emergency
Preparedness
Manager
P. Inserra,
Quality Services
Manager
D. Martin, Security
Programs
Manager
R.'arbee,
System Engineering
Manager
D. Atkinson, Reactor/Fuels
Engineering
Manager
A. Langdon, Assistant
Operations
Manager
R. Matthews, Electrical
Design Hanager
T. Heade,
Engineering
Programs
Manager
P. Harness,
Mechanical
Design Manager
D. Swank,
Licensing Manager
G. Gelhaus,
WNP-2 Projects
Manager
J. Huth, Quality Services
Manager
C. Noyes, Quality Control Hanager
T. Love, Chemistry Manager
D. Coleman,
Reguilatory Services
Manager
H. Etchamendy,
Procurement
Manager
C. Whitcomb, Administration
E Records
Manager
H. Flasch,
Assistant to the Managing Director
G. Sanford,
Planning,
Scheduling,
Outage
Manager
W. Barley, Vice President Staff
D. Larkin, Assistant to Engineering Director
L; Sharp, Assistant to Engineering Director
J. Wyrick, Assistant to the Plant General
Hanager
J. Holder, Regulatory
and Industry Affairs
A. Houncer,
Chief Counsel
J.
Kucere, Cheif Financial Officer
M. Hedges,
Corporate
Chemist
W. Kiel, State
Liaison
A. Klauss,
Lead Offsite Emergency
Planning
W. Oxenford,
Outage/Work Control Supervisor
I. Borland, Acting Corporate
Radiological
Health Officer
R. Winslow, Radiation Protection
Support Supervisor
T.
J.
J.
Y.
H.
C.
H.
S.
G.
J.
S.
B.
T.
T.
D.
NRC
Northstrom,
Environmental
Laboratory Superviosr
Givin, Security Force Supervisor
Pedro,
Licensing Engineer
Derrer,
Licensing
Hatcher, Staff Attorney
Townsend,
Operations
Department
Ale, Senior Informations Specialist
Senner,
Public Affairs Officer
Tupper, Director, Communications/External
Affairs
Taylor, Information Specialist
Benzel,
Executive Assistant to the Hanaging Director
Kasko, Administrative Assistant,
Regulatory
and Industry Affairs
Hardy, Executive Assistant,
Vice President
Nuclear Operations
Bostrom,
Manager of Projects
(Bechtel)
Cruet,
Siemens
S.
J.
K.
W.
K.
H.
J.
R.
J.
D.
M.
E.
Collins, Deputy Regional Administrator
Dyer, Director, Division of Reactor Projects
Perkins, Director, Walnut Creek Field Office
Bateman,
Project Director,
PDIV-2,
Brockman,
Deputy Director, Division of Reactor Safety
Mong, Chief, Reactor Projects
Branch
E
Clifford, Senior Project Manager,
Barr, Senior Resident
Inspector
Mitchell, Regional
Coordinator,
OEDO
Kunihiro, State Liaison
Hammond,
Public Affairs Officer
Brown, Intern,
Others
D.
R.
J.
J.
D.
E.
Williams, Nuclear Engineer,
Bonneville Power Administration
Hazurkrivicz, Chief Operations
Branch,
Bonnevile
Power Administration
Lewis, Bonneville Power Administration
Zeller, Washington
Energy Facility Site Evaluation Council
HcHanman, Tri-City Herald
Heintz,
News Director,
KONA Radio