ML17291B157

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Re Second 10-yr Inservice Insp Program Plan & Associated Relief Requests for Plant Nuclear Project,Unit 2
ML17291B157
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/12/1995
From: Bateman W
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291B158 List:
References
TAC-M91352, NUDOCS 9512180130
Download: ML17291B157 (10)


Text

gy,8 RE00

+4 po

'g

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 12, 1995

$~ A%7 Hr. J. V. Parrish (Hail Drop 1023)

Vice President Nuclear Operations 3000 George Washington Way Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968

SUBJECT:

EVALUATION OF THE SECOND TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN AND ASSOCIATED RELIEF RE(UESTS FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEH (WPPSS)

NUCLEAR PROJECT NO.

2 (WNP-2)

(TAC NO. H91352)

Dear Hr. Parrish:

The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has reviewed the information you provided in your letter dated December 27,

1994, as supplemented by letter dated May 12, 1995.

Your letters provided the Second Ten-Year Interval Inservice Inspection (ISI) Program Plan, Revision 0, and associated relief requests for the WPPSS Nuclear Project No. 2.

The results of the staff review are provided in the enclosed Safety Evaluation (SE), with an attached Technical Evaluation Report from INEL.

As previously discussed in our February 1,

1995, letter, Relief Request 2ISI-01 (Part

1) for examination of reactor pressure vessel shell welds is denied.

We understand that you will submit a revised alternative to the augmented inspection requirements in the near future.

With respect to request for relief 2ISI-01 (Part 2) for the reactor vessel head and requests for relief 2ISI-02, 2ISI-04, 2ISI-10, and 2ISI-12 for shell-to-flange welds, the staff has determined that the testing requirements for the subject components are impractical and pursuant to 10 CFR 50.55a(g)(6)(i),

the granting of relief is authorized by law, will not endanger life, property or the common defense and security, and is otherwise in the public interest.

The staff has determined that the proposed alternatives for requests for relief 2ISI-03, 2ISI-07, and 2ISI-14, are acceptable pursuant to 10 CFR 50.55a(a)(3)(i).

The staff has determined that with respect to requests for relief 2ISI-05, 2ISI-06, 2ISI-08, and 2ISI-09, compliance by Washington Public Power Supply System would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety, and therefore the proposed alternative is authorized pursuant to 10 CFR 50.55a(a)(3)(ii).

The licensee's proposed alternative to use Code Case N-416-1 in lieu of Code requirements contained in relief request 2ISI-13 is authorized pursuant to 10 CFR 50.55a(a)(3)(ii),

provided that an additional surface examination is performed on the root pass layer of Class 3 butt and socket welds.

Code Case N-416-1 is authorized for use until such time as the Code Case is published in Regulatory Guide 1. 147.

After that time, the licensee is to follow all the provisions in Code Case N-416-1 with limitations issued in Regulatory Guide 1.147, if any.

95i2i80i30 95i2i2 PDR ADQCK 050003'P7 PDR

1

~

t t

I'

Hr. J.

V. Parrish In making this determination, we have given due consideration to the burden that could result if those requirements were imposed on your facility.

Therefore, the staff finds your requests for relief acceptable, and by this letter, relief is granted for 2ISI-01 (Part 2), 2ISI-02, 2ISI-03, 2ISI-04, 2ISI-05, 2ISI-06, 2ISI-07, 2ISI-08, 2ISI-09, 2ISI-10, 2ISI-12, 2ISI-13, and 2ISI-14.

Relief request 2ISI-ll regarding inservice inspection requirements of snubbers is considered part of the inservice testing (IST) program, and is being evaluated separately.

This completes our action on TAC No. M91352. If you have any, questions, please contact the Project Manager, Dim Clifford, at (301) 415-1352.

Sincerely, Docket No. 50-397

Enclosure:

'Safety Evaluation cc w/encl:

See next page Milliam H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Hr. J.

V. Parrish cc w/encl:

Hr. J.

H. Swailes MNP-2 Plant General Hanager Mashington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352-0968 Chief Counsel (Hail Drop 396)

Mashington Public Power Supply System P.O.

Box 968

Richland, Mashington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.

Box 43172 Olympia, Mashington 98504-3172 Hr. D. A. Swank (Mail Drop PE20)

WNP-2 Licensing Manager Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Hr. Paul R.

Bemis (Hail Drop PE20)

Director, Regulatory and Industry Affairs Washington Public Power Supply System P.O.

Box 968

Richland, Mashington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.

Box 69

Prosser, Mashington 99350-0190 Hr. R. C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 69 Richland; Mashington 99352-0968 H. H. Philips, Jr.,

Esq.

Winston 5 Strawn 1400 L Street, N.M.

Washington, DC 20005-3502

(y I

I il i

Hr. J.

V. Parrish In making this determination, we have given due consideration to the burden that could result if those requirements were imposed on your facility.

Therefore, the staff finds your requests for relief acceptable, and by this letter, relief is granted for 2ISI-Ol (Part 2), 2ISI-02, 2ISI-03, 2ISI-04, 2ISI-05, 2ISI-06, 2ISI-07, 2ISI-08, 2ISI-09, 2ISI-10, 2ISI-12, 2ISI-13, and 2ISI-14.

Relief request 2ISI-ll regarding inservice inspection requirements of snubbers is considered part of the inservice testing (IST) program, and is being evaluated separately.

This completes our action on TAC No. H91352.

If you have any questions, please contact the Project Manager, Jim Clifford, at (301) 415-1352.

Sincerely, Docket No. 50-397

Enclosure:

Safety Evaluation cc w/encl:

See next page ORIGINAL SIGNED BY J.

STONE FOR:

William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of:Nuclear Reactor Regulation DISTRIBUTION:

Docket File PUBLIC JRoe EAdensam WBateman JClifford EPeyton RZimmerman JHitchell, EDO ACRS PDIV-2 Reading

OGC, 015B18
KPerkins, WCFO
JDyer, RIV
HWong, WCFO GHill (2),

T5C3 WRussell/FMiraglia DOCUMENT NAME: WNP91352.REL OFC DATE PDIV-2/PD WBateman lP//l/95 OGC JClifford:pk C~oc~

z/>/95 e

on tl j5Q'95

((QO/95 OFFICIAL RECORD COPY PD IV-2/LA PD I PH

~

~

4 f

,f

~

~ 2+

1 Hr. J. V. Parrish In making this determination, we have given due consideration to the burden that could result if those requirements were imposed on your facility.

Therefore, the staff finds your requests for relief acceptable, and by this letter, relief is granted for 2ISI-01 (Part 2), 2ISI-02, 2ISI-03, 2ISI-04, 2ISI-05, 2ISI-06, 2ISI-07, 2ISI-08, 2ISI-09, 2ISI-10, 2ISI-12, 2ISI-13, and 2ISI-14.

Relief request 2ISI-ll regarding inservice inspection requirements of snubbers is considered part of the inservice testing (IST) program, and is being evaluated separately.

This completes our action on TAC No. H91352. If you have any questions, please contact the Project Manager, Jim Clifford, at (301) 415-1352.

Sincerely, ORIGINAL SIGNED BY J.

STONE FOR:

Docket No. 50-397

Enclosure:

Safety Evaluation cc w/encl:

See next page William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation DISTRIBUTION:

Docket File PUBLIC JRoe EAdensam WBateman JClifford EPeyton RZimmerman JMitchell, EDO ACRS PDIV-2 Reading

OGC, 015818
KPerkins, WCFO
JDyer, RIV
HWong, MCFO GHill (2),

T5C3 WRussell/FMiraglia DOCUMENT NAME: WNP91352.REL OFC PDIV-2 LA PDI

PM OGC PDIV-2/PD NAHE e

on JClifford:pk c~nc.~

WBateman DATE i1 /5Q'95 (i+0/95 gp./4 /95 (g/g/95 OFFICIAL RECORD COPY

0

~l l

1e 1