GO2-96-008, Monthly Operating Rept for Dec 1995 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1995 for WNP-2
ML17291B194
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-008, GO2-96-8, NUDOCS 9601190110
Download: ML17291B194 (8)


Text

CATEGORY j.

REGULATORINFORMATION DISTRIBUTION ISTEM (RIDE)

ACCRSSJOk NBR:9601190110 DOC.DATE: 95/12/31 NOTARIZED: NO DOCKET ¹ FACIL 50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.AAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1995 for WNP-2.W/960111 ltr.'ISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR J ENCL L SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS CENTER RGN4 EXTERNAL: LITCO BRYCEFJ H

NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT,. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBFR OF COPIES REQUIRED:

LTTR '9 ENCL'9

V fr

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George 'Washington Way

~ Richland, Washington 99352 January 11, 1996 G02-96-008 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT DECEMBER 1995 Transmitted herewith is the Monthly Operating Report for the month of December 1995 as required by Technical Specification 6.9.1.6.

Sincerely,

. V; Parrish (Mail Drop 1023)

Vice President, Nuclear Operations JVP'DGE CC:

LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)

INPO ANILibrary UtilityData Institute BPA (399)

I'60ii90ii0 95i23i PDR ADGCK 05000397 R

PDR 180073 zptI l1

L We (l",ig'";!

OPERATING STATUS REPORT for WNP-2 Date:

January 1, 1996 1.

2.

3.

4.

5.

6.

7.

8.

9.

3486 1199 1153 1145 1099 none Docket:

50-397 Reporting Period:

DECEMBER 1995 Outage + On-line Hours:

744.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours Power to which restricted, ifany (Net MW,):

about 98% for most of December Reasons for restrictions, ifany:

administrative limitplaced on plant operations until special feedwater flow test results were validated, which resulted in about a 2%

decrease in power.

Revised electrical ratings in the process of beirig re-calculated.

MONTH YEAR CUMULATIVE 744.0 8,760.0 96,848.2 744.0 6,935.2 69,635.8 0.0 404.5 744.9 744.0 6,682.9 67,250.5 0.0 577.1 958.8 1,866,688 21,194,710 200,457,550 630,470 7,223,980 67,577,480 603,598 6,933,183 64,758,318 100.0%

76.3%

69.4%

100.0%

82.9%

70.4%

73.8%

72.5%

61.2%

70.3%

69.8%

60.4%

0.0%

5.0%

11.0%

0.0 348.6 8,319.7 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

27.

Ifcurrently shutdown, estimated startup date:

Refueling, 4/13/96, 55 days NA Note:

Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

DECEMBER 1995 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 January 1, 1996 D. G. Embree (509) 377-8448 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)

AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 1119 681 697 893 1143 1147 1080 670 676 675 676 673 672 676 679 16 17 18 19 20 21 22 23 24 25 26 27 29 30 31 680 682 680 680 681 682 684 684 685 684 682 870 1151 1154 1156 1158 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly,

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

NOVEMBER 1995 DOCKET NO.:

50-397 UNIT NAME:

WNP-2 DATE:

January 1, 1996 COMPLETED BY:

D.G. Embree TELEPHONE:

(509) 3774448 No.

Date Type Hours

Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-12 12/01/95 S

72.0 H

ZZ ZZZZZZ Economic dispatch (load following) at the request of ~

the BPA.

95-13 12/07/95 S

489.9 H

NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.

SUMMARY

At the beginning of the month, the plant was operating near full power.

The plant was placed in economic dispatch goad following) at the request of the BPA for most of the month.

The plant returned to full power operation at the end of the month.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG-0161 Exhibits F &H

g