Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291B233 + (09:30:11, 8 January 2025)
- GO2-96-023, Monthly Operating Rept for Jan 1996 for WNP Unit 2 + (09:30:13, 8 January 2025)
- GO2-96-027, Submits Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (09:30:14, 8 January 2025)
- ML17291B227 + (09:30:16, 8 January 2025)
- GO2-96-021, Requests for Exemption from Certain 10CFR73.55(e)(1) Re Detection Aid Requirements + (09:30:17, 8 January 2025)
- IR 05000397/1995099 + (09:30:18, 8 January 2025)
- ML17291B224 + (09:30:20, 8 January 2025)
- IR 05000397/1995033 + (09:30:29, 8 January 2025)
- SBK-L-17172, Seventh Annual Update to the License Renewal Application + (09:30:30, 8 January 2025)
- ML17291B220 + (09:30:32, 8 January 2025)
- ML17291B219 + (09:30:32, 8 January 2025)
- ML17291B217 + (09:30:33, 8 January 2025)
- ML17291B215 + (09:30:34, 8 January 2025)
- ML17291B214 + (09:30:35, 8 January 2025)
- ML17291B213 + (09:30:36, 8 January 2025)
- IR 05000397/1995032 + (09:30:37, 8 January 2025)
- GO2-96-017, Forwards Response to Violation Noted in Insp Rept 50-397/95-31.Corrective Actions:Equipment Operator Involved Counselled on Proper Use of Protective Clothing & Importance of Adhering to Requirements of Radiation Work Permit + (09:30:38, 8 January 2025)
- ML17291B210 + (09:30:38, 8 January 2025)
- GO2-96-014, Application for Amend to License NPF-21 Re Primary Containment Leakage Testing + (09:30:40, 8 January 2025)
- ML17291B206 + (09:30:41, 8 January 2025)
- TAC:M88626 + (09:30:42, 8 January 2025)
- TAC:M93807 + (09:30:43, 8 January 2025)
- ML17291B204 + (09:30:43, 8 January 2025)
- ML17291B203 + (09:30:44, 8 January 2025)
- ML17291B202 + (09:30:45, 8 January 2025)
- ML17291B200 + (09:30:46, 8 January 2025)
- ML17291B198 + (09:30:47, 8 January 2025)
- GO2-96-010, Provides Response to GL 94-03, Integranular Stress Corrosion Cracking of Core Shrouds in Bwrs + (09:30:48, 8 January 2025)
- IR 05000397/1995029 + (09:30:50, 8 January 2025)
- ML17291B195 + (09:30:51, 8 January 2025)
- GO2-96-008, Monthly Operating Rept for Dec 1995 for WNP-2 + (09:30:52, 8 January 2025)
- GO2-96-005, Informs That Go Smith Became Plant Manager,Effective 951221.JH Swailes Formerly Plant General Manager,Assigned Position of Director,Engineer + (09:30:53, 8 January 2025)
- PNO-IV-94-022, on 940426,manual Reactor Trip Occurred Due to Recirculation Flow Cycling.Licensee Plans to Remain Shutdown & Begin Refueling Outage 8 That Was Planned to Start 940429 + (09:30:56, 8 January 2025)
- ML17291B191 + (09:30:57, 8 January 2025)
- GO2-95-285, Informs NRC of Changes to Commitments Pertaining to Maint Procedure Update Program + (09:30:58, 8 January 2025)
- ML17291B187 + (09:30:58, 8 January 2025)
- ML17291B184 + (09:31:00, 8 January 2025)
- ML17291B182 + (09:31:01, 8 January 2025)
- ML17291B181 + (09:31:02, 8 January 2025)
- ML17291B179 + (09:31:03, 8 January 2025)
- GO2-95-282, Requests Approval for Use Alternative to ASME Boiler & Pressure Vessel Code Requirements for Exam of Longitudinal Welds in Class 1 & 2 Piping + (09:31:04, 8 January 2025)
- GO2-95-281, Provides Suppl Info Re Relief Request for Temporary non-code Repair of Standby Svc Water Piping,Per GL 90-05 + (09:31:05, 8 January 2025)
- GO2-95-277, Reactor Power Uprate Startup Test Rept, for WNP-2 + (09:31:06, 8 January 2025)
- ML17291B171 + (09:31:08, 8 January 2025)
- GO2-95-275, Forwards Proposed Alternative Exams for 10CFR50.55a(g)(6), Augmented Exam of Rv & Requests That Proposed Alternate to 10CFR50.55a(g)(6) Be Accepted as Revised Relief Request 2-ISI-001 for First 10-yr ISI Interval + (09:31:09, 8 January 2025)
- GO2-95-274, Withdraws Request for Amend to TS to Relocate Component Lists in Accordance W/Gl 91-08 & Selected Implementation of Commissions Policy Statement on TS Improvements + (09:31:10, 8 January 2025)
- GO2-95-283, Provides Supplemental Info Re Water Level Calculation in Retran Model + (09:31:12, 8 January 2025)
- GO2-95-271, Forwards Second 10-Yr ISI Program Plan Relief Request for Exam Category B-F + (09:31:13, 8 January 2025)
- GO2-95-272, Responds to NRC Re Violations Noted in Insp Rept 50-397/95-29.Corrective Actions:Valve Tested & Degraded. Exercising Frequency for RCIC-V-28 Increased from Weekly to daily.RCIC-V-28 Replaced W/Swing Type Check Valve + (09:31:15, 8 January 2025)
- IR 05000397/1995020 + (09:31:17, 8 January 2025)
- GO2-95-269, Responds to NRC Re Violation Noted in Insp Rept 50-397/95-30 on 950925-28.Corrective Actions:Door C-115 & Similar Doors Modified to Incorporate Fixed Hasps Through Which Padlocks Used to Lock Doors + (09:31:18, 8 January 2025)