ML17291B210
| ML17291B210 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/25/1996 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291B211 | List: |
| References | |
| NUDOCS 9601300302 | |
| Download: ML17291B210 (4) | |
See also: IR 05000397/1995032
Text
<p,R REOy+
I
>'
>>)t*<<4
JAN 2 5 iggg
g
go
gx~3
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011.8064
Washington Public Power Supply System
ATN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George Washington
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
NRC INSPECTION REPORT 50-397/95-32
This refers to the inspection
conducted
by Mr. T. 0.
McKernon of this office
on December
11-15,
1995, at the Washington Nuclear Project-2 facility.
The
purpose of the inspection
was to determine whether activities authorized
by
the license were conducted safely and in accordance
with NRC requirements.
At the conclusion of the inspection.
the findings were discussed
with
Mr. C. Schwarz
and those
members of your staff identified in the enclosed
report.
Areas examined during the inspection
included the administration of an initial
licensed operator retake examination
and
a follow-up to previous concerns
identified in NRC Inspection Report 50-397/95-19
conducted during June
1995.
Within these
areas.
the inspection consisted of selective examinations of
procedures
and representative
records,
interviews with personnel,
and
observation of activities in progress.
The results of this inspection are
documented
on page 2, of the enclosed
report.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room
Should you have any questions
concerning this inspection.
we will be pleased
to discuss
them with you.
Sincerely,
Docket:
50-397
License:
r%g
~
C~~.
Th
as
P.
Gw)
. Dir
or
D vision of Reactor
Safety
9601300302
960125
ADQCK 05000397
8
Washington Public Power
Supply
System
-2-
Enclosure:
NRC Inspection
Report
50-397/95-32
w/attachments
1-2
cc w/enclosure
and attachment l:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
ND 927H
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George Washington
Way
P.O.
Box 968,
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair. Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
MNP-2 Licensing Manager
P.O.
Box 968 {Hail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R.
Bemist Director
Regulatory
and Industry Affairs
P.O.
Box 968 {Mail Drop PE20)
Richland.
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser.
Mashington
99350-0190
Winston
8 Strawn
ATTN:
N. H. Phi lips.
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply System
Bill Shaeffer,
Operations
Training Manager
9"~A nc~~no I>jawhinqtqn slav
i'.U.
pUA WOO,
>'IU lVZO
Richland.
99352-0968
Washington Public Power Supply
System
-3-
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
M.
Hammond
(PAO,
WCFO)
bcc distrib. by RIV w/attachments
1-2
S.
Richards
(NRR/DRCH/HOLB)
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
~ e
'g.'~
bcc distrib. by RIV w/attachment
1:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB.
MS:
TWFN 9E10)
L. Hurley
DOCUMENT NAME: R:t WN2NWN532RP.TOM
To receive copy of docurnen4 Indicate in box: "C" ~ Copy w haut enctosures
"E'
Copy with enclosures "N" = No copy
C
C:OB
RE:OB
D:DR
TPGwynn
01/,
/96
Ol/ 4 /96
"
Olh,'+9
Vl I l4IAI
lie 4VihU vvi
TOMcKernon:c
JITa ia '.
PBF:DRP
Gl/.j,q/96
D:DRS
TPGwyn
01/
/96
Washington Public Power Supply
System
-3-
E-Mail report to D. 'Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE42) w/attachments
1-2
bcc distrib. by RIV w/attachment
1:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB.
MS:
TWFN 9E10)
L. Hurley
bcc distrib. by RIV w/attachments
1-2
S. Richards
(NRR/DRCH/HOLB)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME: R:t WN2%WN532RP.TOM
To receive copy of docurnen4 Indicate In box: "CCopy 'out endosures
"E" ~ Copy with enctosures "N""-No copy
RE:OB
TOMcKernon:c
C:OB
JITa ia
D:DR
PGwynn
PBF:DRP
0:DRS
TPGwyn
Ol /i /QF'>am9
Z
n't/Wu/96
togt LCLAL f<Ct.UKH t.UV7
ol, /,
/96