Forwards Insp Rept 50-397/95-32 Conducted on 951211-15. Areas Examined Included Administration of Initial Licensed Operator Retake Exam & follow-up to Previous Concerns Identified in Insp Conducted in June 1995
ML17291B210
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/25/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291B211 List:
References
NUDOCS 9601300302
Download: ML17291B210 (4)


See also: IR 05000397/1995032

Text

<p,R REOy+

I

>'

>>)t*<<4

JAN 2 5 iggg

g

go

gx~3

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

Washington Public Power Supply System

ATN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC INSPECTION REPORT 50-397/95-32

This refers to the inspection

conducted

by Mr. T. 0.

McKernon of this office

on December

11-15,

1995, at the Washington Nuclear Project-2 facility.

The

purpose of the inspection

was to determine whether activities authorized

by

the license were conducted safely and in accordance

with NRC requirements.

At the conclusion of the inspection.

the findings were discussed

with

Mr. C. Schwarz

and those

members of your staff identified in the enclosed

report.

Areas examined during the inspection

included the administration of an initial

licensed operator retake examination

and

a follow-up to previous concerns

identified in NRC Inspection Report 50-397/95-19

conducted during June

1995.

Within these

areas.

the inspection consisted of selective examinations of

procedures

and representative

records,

interviews with personnel,

and

observation of activities in progress.

The results of this inspection are

documented

on page 2, of the enclosed

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room

Should you have any questions

concerning this inspection.

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

r%g

~

C~~.

Th

as

P.

Gw)

. Dir

or

D vision of Reactor

Safety

9601300302

960125

PDR

ADQCK 05000397

8

PDR

Washington Public Power

Supply

System

-2-

Enclosure:

NRC Inspection

Report

50-397/95-32

w/attachments

1-2

cc w/enclosure

and attachment l:

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

ND 927H

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

Chief Counsel

3000 George Washington

Way

P.O.

Box 968,

ND 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair. Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

MNP-2 Licensing Manager

P.O.

Box 968 {Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R.

Bemist Director

Regulatory

and Industry Affairs

P.O.

Box 968 {Mail Drop PE20)

Richland.

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser.

Mashington

99350-0190

Winston

8 Strawn

ATTN:

N. H. Phi lips.

Esq.

1400

L Street,

N.W.

Washington.

D.C.

20005-3502

Washington Public Power Supply System

Bill Shaeffer,

Operations

Training Manager

9"~A nc~~no I>jawhinqtqn slav

i'.U.

pUA WOO,

>'IU lVZO

Richland.

Washington

99352-0968

Washington Public Power Supply

System

-3-

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

bcc distrib. by RIV w/attachments

1-2

S.

Richards

(NRR/DRCH/HOLB)

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

~ e

'g.'~

bcc distrib. by RIV w/attachment

1:

L. J. Callan

DRS-PSB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB.

MS:

TWFN 9E10)

L. Hurley

DOCUMENT NAME: R:t WN2NWN532RP.TOM

To receive copy of docurnen4 Indicate in box: "C" ~ Copy w haut enctosures

"E'

Copy with enclosures "N" = No copy

C

C:OB

RE:OB

D:DR

TPGwynn

01/,

/96

Ol/ 4 /96

"

Olh,'+9

Vl I l4IAI

lie 4VihU vvi

TOMcKernon:c

JITa ia '.

PBF:DRP

Gl/.j,q/96

D:DRS

TPGwyn

01/

/96

Washington Public Power Supply

System

-3-

E-Mail report to D. 'Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE42) w/attachments

1-2

bcc distrib. by RIV w/attachment

1:

L. J. Callan

DRS-PSB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB.

MS:

TWFN 9E10)

L. Hurley

bcc distrib. by RIV w/attachments

1-2

S. Richards

(NRR/DRCH/HOLB)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME: R:t WN2%WN532RP.TOM

To receive copy of docurnen4 Indicate In box: "CCopy 'out endosures

"E" ~ Copy with enctosures "N""-No copy

RE:OB

TOMcKernon:c

C:OB

JITa ia

D:DR

PGwynn

PBF:DRP

0:DRS

TPGwyn

Ol /i /QF'>am9

Z

n't/Wu/96

togt LCLAL f<Ct.UKH t.UV7

ol, /,

/96