ML17291B220
| ML17291B220 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/06/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291B222 | List: |
| References | |
| NUDOCS 9602120042 | |
| Download: ML17291B220 (6) | |
See also: IR 05000397/1995033
Text
))h.
'c~ gIh REC0
~
~ g
'o
c
I
fl
O
'o 4~
j'-'a*++
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE. SUITE 400
ARLINGTON,TEXAS 76011.8064
FFB -6 l996
Washington Public
Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-33
This refers to the inspection
conducted
by Messrs.
R.C. Barr, J.
W. Clifford,
D.
E. Corporandy,
F.
L. Brush,
and T.
R.
Meadows of this office on
November 26,
1995,
through January
6,
1996, at the Washington Nuclear
Project-2 facility.
The purpose of the inspection
was to determine
whether
activities authorized
by the license
were conducted
safely
and in accordance
with NRC requirements.
At the conclusion of the inspection,
the findings were
discussed
with those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Performance
in the engineering
area during this report period
was
inconsistent.
Engineering
responded
well to
a damaged
reactor core isolation
cooling system pipe support
and
a failure of an emergency diesel
generator
to
start properly.
However,
initial evaluation of the lifting of a diesel
starting air relief valve did not consider other potential
causes
and the
initial evaluation of an apparent
water
hammer event in the service water
system did not proceed
in a timely manner.
We recognize that you have
initiatives in your Performance
Enhancement
Strategy to improve performance
in
the engineering
area.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed
in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
.
J.
E. Dyer, Director
Division of Reactor Projects
9602f20042
960206
ADOCK 05000397
6
f
S
J
0
Washington Public Power Supply
System
Docket:
50-397
License:
Enclosure:
NRC Inspection
Report
50-397/95-33
cc w/enclosure:
Washington Public
Power
Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Manager
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public
Power
Supply System
ATTN:
P.
R. Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
& Strawn
ATTN:
M. H. Philips,
Esq
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public
Power Supply
System
-3-
FEB -6'l996
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distri b.
by RIV:
L. J
~ Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV Fi1 e
Branch Chief (DRP/TSS)
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:i WN2iWN533RP.RCB
To receive copy of docrvnant, indicate
inborn
C
~ Copy without enclosures
"E
~ Copy with enclosures "ff ~ No copy
RIV: ttSRI
RBARR
01/ I/96
C:DRP/E
HJWONG
OI/g//96
D:DRP
JEDYER
~4 /96
1
0
1
II
'
Washington Public
Power Supply
System
FEB -6 l996
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
'eah
Tremper
(OC/LFDCB, HS:
TWFN 9EIO)
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:i WN2~tWN533RP.RCB
Te receive copy ci docmnent, indicate inborn "C" ~ Copy without enclosures
"E
~ Copy with enclosures "rt" ~ No copy
RIV:iSRI
RBARR
01/ //96
C:DRP/E
HJWONG
01/3//96
D DRP
JEDYER'gj(r /96
0
C
L
C
0