Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-97-027, Notifies That Kj Hlavaty Will No Longer Be Maintaining SRO License at Plant,Effective 970201 + (09:23:07, 8 January 2025)
- ML17292A699 + (09:23:09, 8 January 2025)
- TAC:M92541 + (09:23:09, 8 January 2025)
- ML17292A697 + (09:23:10, 8 January 2025)
- GO2-97-022, Forwards Response to NRC Requirement to Provide Info Re Adequacy & Availability of Design Bases Info for Plant + (09:23:11, 8 January 2025)
- ML17292A696 + (09:23:11, 8 January 2025)
- IR 05000397/1996026 + (09:23:15, 8 January 2025)
- ML17292A682 + (09:23:16, 8 January 2025)
- ML17292A681 + (09:23:17, 8 January 2025)
- ML17292A678 + (09:23:18, 8 January 2025)
- ML17292A676 + (09:23:19, 8 January 2025)
- GO2-97-019, Comments on Final Draft SE of Proposed Conversion to Improved TS + (09:23:20, 8 January 2025)
- GO2-96-234, Submits Guarantee of Payment of Deferred Premium for $10 Million Dollars,Per 10CFR140.21 + (09:23:22, 8 January 2025)
- ML17292A674 + (09:23:22, 8 January 2025)
- GO2-97-015, Responds to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (09:23:24, 8 January 2025)
- GO2-97-012, Requests Withdrawal of Request for Amend to TS 6.0, Administrative Controls + (09:23:25, 8 January 2025)
- ML17292A665 + (09:23:27, 8 January 2025)
- 05000397/LER-1996-009, :on 961220,miscalculation of Instantaneous Overcurrent Relay Settings Resulted in Inoperability of safety-related Equipment.Caused by Utilization of Inappropriate Design.Testing Was Completed + (09:23:28, 8 January 2025)
- GO2-97-004, Monthly Operating Rept for Dec 1996 for WNP-2 + (09:23:29, 8 January 2025)
- ML17292A662 + (09:23:31, 8 January 2025)
- ML17292A659 + (09:23:32, 8 January 2025)
- ML17292A660 + (09:23:32, 8 January 2025)
- GO2-97-006, Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl + (09:23:33, 8 January 2025)
- GO2-97-005, Requests Closure of Post-TMI Commitment to Submit Quarterly Safety Relief Valve in-service Repts to GE Nuclear Energy + (09:23:34, 8 January 2025)
- ML17292A655 + (09:23:36, 8 January 2025)
- GO2-96-247, Requests Enforcement Discretion from DG Testing Per TS 3.8.1.1.A.Request Specifically Asks That SR 4.8.1.1.2.a.4 Not Be Repeated for Duration of Current Entry to TS Action 3.8.1.1.a + (09:23:37, 8 January 2025)
- IR 05000397/1996016 + (09:23:38, 8 January 2025)
- GO2-97-001, Submits Supplemental Info & Corrective Actions to Insp Rept 50-397/96-18.Corrective Actions:Problem Evaluation Rept 296-0802 Generated to Document & Resolve Failure to Link PSA Results W/Maint Rule Reliability Criteria + (09:23:39, 8 January 2025)
- ML17292A650 + (09:23:43, 8 January 2025)
- ML17292A647 + (09:23:44, 8 January 2025)
- 05000397/LER-1996-008, :on 961205,failure to Comply with TS Action Requirement for Emergency Core Cooling Sys Actuation Instrumentation Occurred Due to Unidentified Inoperability Condition.Pmr Initiated + (09:23:46, 8 January 2025)
- TAC:M94226 + (09:23:47, 8 January 2025)
- NUREG-1434, Forwards Final Draft SE of Washington Public Power Supply System Proposed Conversion of Washington Nuclear Project 2 TS to Improve TS Based on NUREG-1434, Standard TS of GE Plants,Bwr 6, Rev 1 Dated Apr 1995.W/o Encl + (09:23:48, 8 January 2025)
- ML17292A643 + (09:23:49, 8 January 2025)
- GO2-96-253, Informs of Change of Address for Corporate Offices.Current Distribution List for Nrc,Encl + (09:23:50, 8 January 2025)
- GO2-96-252, Forwards Rept Qualification of Supply Sys Use of RODEX2 Code, for Gap Conductance Calculation in Topical Rept WPPSS-FTS-131, Applications Topical Rept for BWR Design & Analysis. Rept Provides Justification for Use of Code + (09:23:52, 8 January 2025)
- ML17292A641 + (09:23:52, 8 January 2025)
- GO2-96-246, Submits Response to GL 94-02,Action 2, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Boiling Water Reactors + (09:23:53, 8 January 2025)
- ML17292A638 + (09:23:55, 8 January 2025)
- 05000397/LER-1996-007, :on 961122,electrical Breakers Were Not Seismically Qualified in Test/Disconnect Position.Circuit Breaker Mfg Did Not Consider Raced Out Breaker Position During Testing.Relocated Circuit Breakers + (09:23:56, 8 January 2025)
- GO2-96-016, Washington Public Power Supply Sys Annual Rept for 1996 + (09:23:58, 8 January 2025)
- GO2-96-241, Submits Proposed Mod to Amend Requests Revs a & B Re Overall Conversion of Current TS to Improved TS Based Upon NUREG-1434,rev 1 + (09:23:59, 8 January 2025)
- ML17292A634 + (09:23:59, 8 January 2025)
- GO2-96-239, Monthly Operating Rept for Nov 1996 for WNP-2 + (09:24:01, 8 January 2025)
- GO2-96-238, Forwards Util Rept on FW Nozzle Exams Performed During Spring 1996 Refueling Outage + (09:24:02, 8 January 2025)
- ML17292A628 + (09:24:04, 8 January 2025)
- ML17292A624 + (09:24:05, 8 January 2025)
- IR 05000397/1996014 + (09:24:06, 8 January 2025)
- ML17292A622 + (09:24:07, 8 January 2025)
- GO2-96-237, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-16.Corrective Actions:Asd Testing Stopped & site- Wide Timeout for All Employees Conducted + (09:24:08, 8 January 2025)
- GO2-96-235, Submits Cycle 12 Startup Rept for Plant Per Ts.Encl Repts Provide Descriptions of Startup & Power Ascension Testing Activities + (09:24:10, 8 January 2025)