GO2-97-004, Monthly Operating Rept for Dec 1996 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1996 for WNP-2
ML17292A663
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-004, GO2-97-4, NUDOCS 9701230153
Download: ML17292A663 (6)


Text

Y REGULATI ZNFORMATZON DZSTRZBUTZOtYSTEM (RZDS)

ACCESSION NBR:9701230153 DOC.DATE: 96/12/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1996 for WNP-2.W/970109 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

T E

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: A ILE CENTER 01 RT EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 p

R D

U E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(

I TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 'll

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ Richland, Washington 99352-0968 January 9, 1997 G02-97-004 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT DECEMBER 1996 Transmitted herewith is the Monthly Operating Report for the month of December 1996 as required by Technical Specification 6.9.1.6.

Respectfully, G. O. Smith Plant General Manager MailDrop 9270 CC:

LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston &Strawn INPO ANILibrary UtilityData Institute DLWilliams - BPA / 399 i970i230i53 qhi23i s,, PDRII( ADCICK 05000397 R '<'DR

OPERATING STATUS REPORT for WNP-2 Date:

January 1, 1997 2.

3.

4.

5.

6.

7.

8, 9.

10.

Outage + On-line Hours:

744.0 3486 1199 1153 1153 1107 none none Docket:

50-397 Reporting Period: DECEMBER 1996 Uhlity

Contact:

Bernice Kasko (509) 377-4473 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity - summer (Gross MW,):

Maximum Dependable Capacity - summer (Net MW, ):

Ifchanges occur above since last report, give reasons:

Power to which restricted, ifany (Net MW,):

Reasons for restrictions, ifany:

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 2,583,143 882,470 850,855 100.0%

100.0%

103.3%

99.2%

0.0%

0.0 YEAR 8,784.0 6,236.8 985.9 5,999.6 997.4 17,388,480 5,807,310 5,549,957 68.3%

79.7%

57.1%

54.8%

2.0%

123.3 CUMULATIVE 105,632.2 75,872.6 1,730.8 73,250.1 1,956.2 217,846,030 73,384,790 70,308,275 69.3%

71.2%

60.9%

60.0%

10.3%

8,443.0 26.

Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/12/97, duration is 42 days 27.

Ifcurrently shutdown, estimated startup date:

Note:

Cumulative Unit Capacity Factors (MDC&DER) are calculated with weighted averages.

l

t t

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

DECEMBER 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: January 1, 1997 COMPLETED BY: B Knsko TELEPHONE:

(509) 377~73 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)

AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1142 1145 1151 1151 1145 1146 1020 1150 1146 1142 1143 1147 1146 1148 1149 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1149 1152 1153 1154 1154 1151 1152 1150 1148 1147 1145 1154 1148 1140 1145

'137 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS au ar REPORT PERIOD:

DECEMBER 1996 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: January 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 No.

N/A Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence SUhSIARY:

TYPE 77orced S - Scheduled REASON AAqiurumeur Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD

~1-Mauua 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT G-Ol 1E its

&H