Text
CATEGORY 2
A
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
i "
) ACCESSION NBR:9701230117
DOC.DATE: 97/Ol/10
NOTARIZED: NO
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
UTH.NAME
AUTHOR AFFILIATION
ERPJ.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
DOCKET
05000397
SUBJECT: Forwards insp rept 50-397/96-24
on 961027-1207.No violations
noted.
C
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR I ENCL
i
SIZE:
3 7 /6
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
A
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
T.
LE CENTE
7bRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
RNAL: LITCO BRYCEPJ
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
COLBURN,T
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
D
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
~S
SEOUL~
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 760114064
January
10, 1997
J. V. Parrish, Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968, MD 1023
Richland, Washington
99352
SUBJECT: NRC INSPECTION REPORT 50-397/96-24
Dear Mr. Parrish:
An NRC inspection was conducted
October 27 through December 7, 1996, at your
Washington Nuclear Project-2 reactor facility. The enclosed report presents the scope and
results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at
the Washington Nuclear Project-2 facility was generally characterized
by professional,
safety-conscious
operations.
In particular, we noted that your technicians demonstrated
good skills during surveillance activities.
However, we also noted that an apparent
nonconservative
decision by engineering personnel,
associated
with scheduling the repair
of the residual heat removal keepfill pump, resulted in pump failure and train inoperability.
ln addition, we noted poor communications
on the part of a licensed senior reactor
operator, combined with questionable work planning, contributed to minor injury of two
maintenance
workers.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter,
its enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you,
Sincerely,
Division of Reactor Projects
Docket No.: 50-397
License No.:
Enclosures:
1.
NRC Inspection Report
50-397/96-24
970i230ii7 970ii0
ADQCK 05000397
9
Washington Public Power
Supply System
-2-
cc w/enclosures:
Frederick S. Adair, Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Paul R. Bemis (Mail Drop PE20)
Vice President,
Nuclear Operations
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President,
Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Al E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Ms. Lourdes C. Fernandez
(Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Malcolm H. Phillips, Jr., Esq.
Winston 5. Strawn
1400 L Street, N.W.
D.C, 20005-3502
Washington Public Power
Supply System
-3-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Richard Correia (RPC)
E-Mail report to Ronald Frahm, Jr. (RKF)
bcc distrib. by RIV:
L, J. Callan
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
WCFO File
DOCUMENT NAME: R:i WN2iWN624RP.RCB
i
To receive copy of document,
indicate In box: "C" = Copy without e ci sures
"F'
Copy with enciosures "N" = No copy
RIV'RI:DRP/E
C
RCBarr:j
1/2/97
AC:DRP/E
C
FRHuey
1/2/97
D:WCFO
KEPerkins
01
97
01/ /97
01/ /97
930gg~
OFFICIAL RECORD COPY
lE~/