Discusses Insp Rept 50-397/96-16 on 961014-28 & Forwards Revised Notice of Violation
ML17292A624
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/10/1996
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292A625 List:
References
NUDOCS 9612160372
Download: ML17292A624 (6)


See also: IR 05000397/1996016

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9612160372

DOC.DATE: 96/12/10

NOTARIZED:

NO

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

AUTH.NAME

AUTHOR AFFILIATION

OLLINS,S.J.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT: Discusses

insp rept 50-397/96-16

on 961014-28

& forwards

revised notice of violation,

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

I

ENCL

(

SIZE:

5

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET

05000397

l Z

RECIPIENT

ID

CODE/NAME'D4-2

PD

INTERNAL: ACRS

C

FILE CE

H HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

COLBURNPT

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Y

ERNAL: LITCO BRYCEPJ

H

NRC PDR

1

1

1

1

NOAC

1

1

D

E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

1P,g REQOC

0O

l

()1

4~

q,

+>>*+>>

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION Iv

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

December 10, 1996

J. V. Parrish, Chief Executive Officer

Washington Public Power Supply System

3000 George Washington Way

P.O. Box 968, MD 1023

Richland, Washington

99352

SUBJECT:

NRC INSPECTION REPORT 50-397/96-16AND REVISED NOTICE OF

VIOLATION

Dear Mr. Parrish:

Thank you for your letters (G02-96-197 and G02-96-208) of October 14 and 28, 1996, in

response to our inspection report and Notice of Violation dated September

12, 1996,

concerning two violations related to an error in data entry into the control room log and

incorrect strip chart paper installed in a source range recorder.

Both violations were

incident to other activities related to the manipulation of reactivity controls which were the

discussion of a predecisional enforcement conference conducted on October 22, 1996, in

the NRC Region IV office. However, at the conference we questioned your basis for the

denial and you subsequently modified your position by letter dated October 28, 1996.

We have reviewed your replies and the additional information you provided in the letter

dated November 1, 1996.

We disagree with certain conclusions the Supply System

reached with respect to concerns raised in the Notice of Violation dated September

12,

1996. Specifically, we do not agree that the violations should be characterized

as "minor."

First, both violations were associated with the early criticality event.

Secondly, if the

violations recurred, we would have

a more significant concern with respect to control room

activities and administrative recordkeeping.

Therefore, the issues

are considered of more

than minor significance.

In your response to NRC Violation 50-397/9616-02,

which the Supply System denied, you

indicated that the use of linear strip chart paper as an alternative method when no

logarithmic paper is available is an acceptable practice.

However, in this instance

logarithmic strip paper was available.

Further, we know of no procedural guidance to

ensure that the record is annoted as to its proper logarithmic scale for future identification.

Therefore, we believe this is a valid violation.

96f2i60372 96i210

PDR

ADOCK 05000397

8

PDR

Washington Public Power Supply

System

-2-

Because both concerns

are examples of inadequate

administrative recordkeeping,

the two

violations are being combined into one violation with two examples.

Also, because

these

violations were identified by the NRC, they are not eligible for treatment as noncited

violations.

Therefore, the original Notice of Violation is hereby withdrawn. A revised

Severity Level IV violation is being issued herewith and is described

in the enclosed Notice

of Violation.

At the conference, your staff noted that, although there were questions regarding the

regulatory disposition, the supply system believed the issues were valid and needed

corrective action.

As such, your staff took the appropriate steps to ensure these violations

do not recur.

The NRC has concluded that information regarding the reason for the

violation, the corrective action taken and planned to correct the violation and prevent

r currence and the date when full compliance was achieved is already adequately

addressed

on the docket in your responses

to NRC Inspection Report No. 50-397/96-16

dated October 14, and 28, 1996, and the additional information you submitted on

November 1, 1996. Therefore, you are not required to respond to this letter unless the

description therein does not accurately reflect your corrective actions or your position.

In

that case, or if you choose to provide additional information, you should follow the

instructions specified in the enclosed Notice.

We willreview the implementation of your corrective actions during a future inspection to

determine that full compliance has been achieved and will be maintained.

Sincerely,

Samue

J.

o

i s

Deputy Regional Administrator

Enclosure:

Revised Notice of Violation

cc w/enclosure:

Frederick S. Adair, Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Chairman

Benton County Board of Commissioners

P.O. Box 69

Prosser, Washington

99350-0190

Washington Public Power Supply

System

-3-

Mr. Paul R. Bemis (Mail Drop PE20)

Vice President,

Nuclear Operations

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President,

Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

~ Mr. David A, Swank (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Al E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Ms. Lourdes C. Fernandez

(Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Malcolm H. Phillips, Jr., Esq.

Winston 5. Strawn

1400 L Street, N.W.

'ashington,

D.C. 20005-3502

Washington Public Power Supply

System

-4-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE01)

bcc distrib. by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

RIV

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

G. F. Sanborn,

EO

W. L. Brown, RC

J. Lieberman, OE, MS: 7-H5

OE: EA File, MS: 7-H5

Resident Inspector

DRS-PSB

MIS System

File

M. Hammond (PAO, WCFO)

DOCUMENT NAME: R:tWN2616AK.TOM

To receive copy of document,

Indicate ln box: "C" = Copy without enclosures

"E" = Copy with enclosures

"N" = No copy

RIV AC OB

E

EO

SPE

E

AC PB

D:DRP

N

TOMcKernon"

11/27/96

GFSanborn"

11/27/96

12/'6

c

y 96

GWJohnst

. ) FRHu

JEDy

12/+96

D:DRS

N

D:OE

D

TPGwynn

12/ /96

JLieberma

12

/96

SCo

ns

1 Q/96

"Previously concurred

OFFICIAL RECORD COPY

Washington Public Power Supply

System

4-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System {IPAS)

bcc to DMB (IE01)

bcc distrib. by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

RIV

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

G. F. Sanborn,

EO

W. L. Brown, RC

J. Lieberman, OE, MS: 7-H5

OE: EA File, MS: 7-H5

Resident Inspector

DRS-PSB

MIS System

File

M. Hammond {PAO, WCFO)

DOCUMENT NAME':tWN2616AK.TOM

To receive copy of document, indicate in box: "C" = Copy without enciosures

"E" = Copy with enclosures

"N"= No copy

RIV:AC:OB

E

EO

E

SPE

E

AC'PBE

E

TOMcKer on

11$ 96

11/ /96

1 1/g/96

11/ /96

D:DRS

N

DRA

GFSanbo

~ GWJohnston

FRHuey

D:DRP

N

JEDyer

11/ /96

TPGwynn

11/ /96

S JCollins

11/ /96

OFFICIAL RECORD COPY