GO2-96-239, Monthly Operating Rept for Nov 1996 for WNP-2
| ML17292A631 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/30/1996 |
| From: | Kasko B, Galen Smith WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-96-239, NUDOCS 9612190113 | |
| Download: ML17292A631 (7) | |
Text
CATEGORY j.
REGULATO.
INFORMATION DISTRIBUTION JSTEM (RIDS)
ACCESSION NBR:9612190113 DOC.DATE: 96/11/30 NOTARIZED:
NO DOCKET FACIE:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B.
washington Publ'c Power Supply System SMITH,G.O.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Nov 1996 for WNP-2.W/961210 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD4-2 PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 COLBURN,T COPIES LTTR ENCL 1
1 E
INTERNAL FILE C OC DBA/PAD 1
1 1
1 1
1 AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 1
1 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 D
0 U
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ Richland, Washington 99352-0968 December 10, 1996 G02-96-239 Docket No. 50-397*
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1996 Transmitted herewith is the Monthly Operating Report for the month of November 1996 as required by Technical Specification 6.9.1.6.
Respectfully, G. O. Smith Plant General Manager MailDrop 9270 cc:
LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston &Strawn INPO ANILibrary UtilityData Institute DLWilliams - BPA / 399 9612i9011S Pgiig0 PDR ADOCK 05000397i R
PDR ygaoc
~i
OPERATING STATUS REPORT for WNP-2 Date:
December 1, 1996 2.
3.
4.
5.
6.
7.
8.
9.
10.
Outage + On-line Hours:
720.0 3486 1199 1153 1153 1107 none none Docket:
50-397 Reporting Period: NOVEMBER 1996 UtilityContact:
Bernice Kasko (509) 377-4473 Licensed Thermal Power (MW,):
Nameplate Rating (Gross MW, ):
Design Electrical Rating (Net MW,):
Maximum Dependable Capacity - summer (Gross MW,):
Maximum Dependable Capacity - summer (Net MW, ):
Ifchanges occur above since last report, give reasons:
Power to which restricted, ifany (Net MW,):
Reasons for restrictions, ifany:
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours MONTH 720.0 720.0 0.0 720.0 0.0 2,404,370 821,320 791,479 100.0%
100.0%
99.3%
95.3%
0.0%
0.0 YEAR 8,040.0 5,492.8 985.9 5,255.6 997.4 14,805,337 4,924,840 4,699,102 65.4%
77.8%
52.8%
50.7%
2.3%
123.3 CUMULATIVE 104,888.2 75,128.6 1,730.8 72,506.1 1,956.2 215,262,887 72,502,320 69,457,420 69.1%
71.0%
60.6%
59.7%
10,4%
8,443.0 26.
Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/12/97, duration is 42 days 27.
Ifcurrently shutdown, estimated startup date:
Note:
Cumulative Unit Capacity Factors (MDC&DER) are calculated with weighted averages.
e t
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNlT: WNP-2 DATE: December 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:
NOVEMBER 1996 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)
AVERAGEDAILYPOWER LEVEL DAY (Net MWe) 10 12 13 15 1052 627 1131 1145 1152 1140 1151 1142 766 709
'146 1142 1135 1147 1152 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1144 1127 1149 1151 1150 1152 1153 1152 1154 1158 1151 1153 1145 1152 1149 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:
NOV1MBER 1996 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: December 1, i/96 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96-14 11/2/96 F
Zero N/A N/A CB MOTORX Reduced power to 49% to perform maintenance on ASD channel.
96-15 11/11/96 S
Zero B
N/A N/A HB/HE VALVEX Reduced power to 75% to perform monthly turbine valve testing.
SUKSXARY:
At the end of the month WNP-2 was operating at 100% power.
TYPE orced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other METHOD
~1-Manus 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT VREG-01 1 E its F &