ML17292A647

From kanterella
Jump to navigation Jump to search
Forwards Copy of FEMA Final Rept for 960925,Washington Nuclear Project-2 Exercise.No Deficiencies & 12 Arcas Noted. No Response Required
ML17292A647
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/09/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292A648 List:
References
NUDOCS 9701140078
Download: ML17292A647 (7)


Text

C:~'i;.~(.v~i REGULATOIZNFORNATION DISTRIBUTION 'TEN (RIDE) a c4 ACCESSION NBR 970 1 1 40078 DOC ~ DATE 97/0 1/09 NOTARIZED NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION GWYNN,T.P.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards copy of FEMA final rept for 960925<Washington Nuclear Project-2 exercise.No deficiencies

& 12 ARCAs noted.

No response required.

DISTRIBUTION CODE:

IE35D COPIES RECEIVED:LTR

(

ENCL I

SIZE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr Exercise NOTES:

A Rep T RECIPIENT ID CODF/NAME PD4-2 PD INTERNAL:

E CENTER NRR DRPM PERB RGN4 FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME COLBURNFT NRR/DISP/PIPB OE DIR NRC PDR COPIES

'LTTR ENCL 1

1 1

1 1

1 1

1 0

R D

0 C

V E

m i

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK tDCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

t 1

, ~p,R RECy (4

P 4

0 g

~.

<+i

~~)

+*~~4 t

UNITEDSTATES

'NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 9

)097 J. V. Parrish, Chief Executive Officer Washington Public Power Supply System 3000 George Washington Way P.O. Box 968, MD 1023 Richland, Washington 99352

SUBJECT:

FEDERAL EMERGENCY MANAGEMENTAGENCY'S REPORT

Dear Mr. Parrish:

Enclosed is a copy-of the Federal Emergency Management Agency's final report for the September 25, 1996, Washington Nuclear Project-2 exercise.

The report indicates that there were no deficiencies and 12 areas requiring corrective actions identified during the exercise.

No response to the NRC is required.

Ifyou have any questions concerning this letter, please contact Ms. Gail M. Good of my staff at (817) 860-8215.

Sincerely, Th as P. Gw Di ctor ision of Reactor Safety

Enclosure:

As stated Docket No.: 50-397 License No.:

NPF-21 cc w/o enclosure:

Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 970if40078 970i09 PDR ADQCK 0500039'7 F

PDR

Washington Public Power Supply System Mr. Paul R. Bemis (Mail Drop PE20)

Vice President, Nuclear Operations Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968=

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Al E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Lourdes C. Fernandez (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Malcolm H. Phillips, Jr., Esq.

Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS) bcc to DMB (IE35) bcc distrib. by RIV:

L. J. Callan

'DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

T. Essig (NRR/DRPM/PERB)

C. Hackney, RSLO Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

WCFO File 140047 DOCUMENT NAME: G:iDRSLTRSiFEMAEX96.WNP To receive copy of document, Indicate in box'c"= Copy without enctosu es "E" = Copy with enctosures "N" "- No copy BMurray GMGood:cg SEPA:PSB E

C:PSB E

D:DRS TPGwyn 01/+97 01

/97 01/ /97 OFFICIAL REC RD COPY

Washington Public Power Supply System Larry E. Moore, RAC Chairman FEMA Region X PT Division (PT-TE-REP) 130 228th Street, S.W.

Bothell, Washington 98021-9796

Washington Public Power Supply System E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS) bcc to DMB (IE35) bcc distrib. by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

T. Essig (NRR/DRPM/PERB)

C. Hackney, RSLO Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

WCFO File DOCUMENT NAME: G:>DRSLTRS~tFEMAEX96.WNP To receive copy of document, indicate in box: "C" = Copy without encfosu es "E" = Copy with enclosures "N"= No copy SEPA:PSB E

GMGood:cg 01/+97 D:DRS TPGwyn 01/ /97 C:PSB E

BMurray 01

/97 OFFICIAL REC RD COPY