Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17303B155 + (07:54:02, 8 January 2025)
- ML17303B154 + (07:54:03, 8 January 2025)
- TAC:67816 + (07:54:04, 8 January 2025)
- ML17303B153 + (07:54:04, 8 January 2025)
- ML17303B151 + (07:54:06, 8 January 2025)
- ML17303B149 + (07:54:09, 8 January 2025)
- ML17303B148 + (07:54:10, 8 January 2025)
- ML17303B147 + (07:54:11, 8 January 2025)
- PNO-V-88-034, on 880523,possible Whole Body Exposure of 3.2 Rems Occurred During Preparations for Decontamination of Reactor Refueling Cavity.Caused by Sudden Increase in Remotely Monitored Teledose Monitor Device Worn by Worker + (07:54:12, 8 January 2025)
- IR 05000528/1988012 + (07:54:17, 8 January 2025)
- ML17303B144 + (07:54:19, 8 January 2025)
- ML17303B142 + (07:54:19, 8 January 2025)
- ML17303B139 + (07:54:20, 8 January 2025)
- PNO-V-88-033, on 880514,unit Tripped on DNBR & High Linear Power Density in Response to Insertion of Control Element Assemblies.Computer Program Used for Predicting Xenon Levels Contained Erroneous Constants.Constants Refined + (07:54:22, 8 January 2025)
- IR 05000528/1988010 + (07:54:28, 8 January 2025)
- ML17303B135 + (07:54:29, 8 January 2025)
- ML17303B134 + (07:54:30, 8 January 2025)
- ML17303B133 + (07:54:31, 8 January 2025)
- ML17303B129 + (07:54:31, 8 January 2025)
- ML17303B126 + (07:54:33, 8 January 2025)
- ML17303B123 + (07:54:35, 8 January 2025)
- ML17303B124 + (07:54:35, 8 January 2025)
- ML17303B122 + (07:54:36, 8 January 2025)
- ML17303B120 + (07:54:37, 8 January 2025)
- IR 05000528/1988008 + (07:54:38, 8 January 2025)
- ML17303B115 + (07:54:39, 8 January 2025)
- ML17303B113 + (07:54:40, 8 January 2025)
- ML17303B111 + (07:54:41, 8 January 2025)
- TAC:68172 + (07:54:41, 8 January 2025)
- ML17303B110 + (07:54:42, 8 January 2025)
- ML17303B108 + (07:54:43, 8 January 2025)
- TAC:67778 + (07:54:43, 8 January 2025)
- ML17303B107 + (07:54:43, 8 January 2025)
- ML17303B106 + (07:54:45, 8 January 2025)
- ML17303B105 + (07:54:46, 8 January 2025)
- ML17303B104 + (07:54:46, 8 January 2025)
- ML17303B101 + (07:54:47, 8 January 2025)
- ML17303B103 + (07:54:47, 8 January 2025)
- 05000530/LER-1988-004-02, :on 880406,loss of Power Event Occurred Which Resulted in Train B ESF Load Sequencer Sys Actuation.Caused by Error in Work Document Being Utilized to Replace Current Transformer.Maint Testing Stopped + (07:54:49, 8 January 2025)
- ML17303B096 + (07:54:50, 8 January 2025)
- TAC:66679 + (07:54:50, 8 January 2025)
- TAC:61841 + (07:54:52, 8 January 2025)
- ML17303B093 + (07:54:52, 8 January 2025)
- ML17303B086 + (07:54:54, 8 January 2025)
- ML17303B089 + (07:54:54, 8 January 2025)
- PNO-V-88-028, on 880428,unplanned Unit Shutdown Occurred. Caused by Oil Leak on Reactor Coolant Pump 2A.Oil Filter Flange Repaired & Instrumentation & Control Surveillances Completed + (07:54:56, 8 January 2025)
- ML17303B083 + (07:54:57, 8 January 2025)
- PNO-V-88-027, on 880419,licensee Provided Preliminary Rept to Region V Ofc That QC Inspector Had Signed as Completed QC Foreign Matl Exclusion Insp,Which Appartently Had Not Actually Been Conducted.Inspector Involved Terminated + (07:54:58, 8 January 2025)
- ML17303B079 + (07:54:59, 8 January 2025)
- ML17303B080 + (07:54:59, 8 January 2025)
- ML17303B078 + (07:55:00, 8 January 2025)