ML17303B120
| ML17303B120 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/12/1988 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17303B121 | List: |
| References | |
| NUDOCS 8805230067 | |
| Download: ML17303B120 (12) | |
Text
elks AEGu P
~4 0
Op 0O I
+
<<~
0+
/J ++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO.
STN 50-528 PALO VERDE NUCLEAR GENERATING STATION, UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 33 License No. NPF-41 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The submittals, dated November 21, 1986 and December 7, 1987, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison
- Company, Public Service Company of New Mexico, Los Angeles Department of lfater and
- Power, and Southern California Public Power Authority (licensees),
comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of Act, and the regulations of the CoIIIIission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, paragraph 2.E of Facility Operating License No. NPF-41 is hereby amended to read as follows:
E.
The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The Safeguard Contingency Plan is incorporated into the Physical Security Plan.
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:
"Palo Verde 8805230067 880512 I
PDR ADOCH, 05000528 P
Ij I
I
~*
Nuclear Station Physical Security Plan," with revisions submitted through December 7,
1987; and "Palo Verde Nuclear Generating Station Gum d Training and gualification Plan," with revisions submitted through December 26, 1987.
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
3.
This license amendment is effective as of the date of issuance FOR THE NUCLEAR REGULATORY COMMISSION gc,'z.e <P~
F~
George W. Knighton, Project Director Project Directorate V
Division of Reactor Projects - III IV, V and Special Projects Date of Issuance:
~ay 12, 1988
~
gag REGS, (4
P0 Cy ClO I
O
++*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO.
STN 50-529 PALO VERDE NUCLEAR GENERATING STATION UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 20 License No. NPF-51 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The submittals, dated November 21, 1986 and December',
- 1987, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and
- Power, and Southern California Public Power Authority (licensees),
comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of Act, and the regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the colon defense and security or to the health and safety of the public; E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, paragraph 2.E of Facility Operating License No. NPF-51 is hereby amended to read as follows:
E.
The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The Safeguard Contingency Plan is incorporated into the Physical Security Plan.
The plans, which contain Safeguards Information protected under 10 CFR 73,21, are entitled:
"Palo Verde
Nuclear Station Physical Security Plan," with revisions submitted through December 7, 1987; and "Palo Verde Nuclear Generating Station Guard Training and gualification Plan," with revisions submitted through December 26, 1987.
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION gP~8'.
+~~.g A A~
George M. Knighton, Project Director Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Date of Issuance:
May 12, 1988
~
~p8 REOy, tp,0 OO
++*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO.
STN 50-530 PALO VERDE NUCLEAR GENERATING STATION, UNIT NO.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
7 License No. NPF-74 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
C.
D.
E.
The submittals, dated November 21, 1986 and December 7, 1987, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power DistIict, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Mater and
- Power, and Southern California Public Power Authority (licensees),
comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of Act, and the regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, paragraph 2.E of Facility Operating License No.
NPF-74 is hereby amended to read as follows:
E.
The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The Safeguard Contingency P1an is incorporated into the Physical Security Plan.
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:
"Palo Verde
[I
-2<<
Nuclear Station Physical Security Plan," with revisions submitted through December 7, 1987; and "Palo Verde Nuclear Generating Station Guard Training and gualification Plan," with revisions submitted through December 26, 1987.
Changes made in accordance with 10 CFR 73.55 shall be implemented in a'ccordance with the schedule set forth therein.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
~r~ George Li. Knighton, Project Director
~
~
~
Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Date of Issuance:
May 12, 1988