ML17303B142

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/88-12,50-529/88-12 & 50-530/88-12 on 880408-08 & Notice of Deviation
ML17303B142
Person / Time
Site: Palo Verde  
Issue date: 05/12/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17303B143 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8805310255
Download: ML17303B142 (6)


See also: IR 05000528/1988012

Text

ACCELERATED

DJSTRIBUTJON

DEMONSTRA'@ON

gySTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR-8805310255

DOC.DATE- 88/05/12

NOTARIZED: NO

DOCKET

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

STN-50-'529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

PATE,R.J.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

VAN BRUNT,E.E.

Arizona Nuclear Power Project (formerly Arizona Public Serv

SUBJECT:

Forwards Insp Repts 50-528/88-12,50-529/88-13

S 50-530/88-12

on 880408-08

& notice of deviation.

DISTRIBUTION CODE: IE01D

COPIES

RECEIVED:LTR

>

ENCL Q

SIZE w~] 7

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Standardized

plant.

Standardized

plant.

Standardized

plant.

05000528S

05000529

05000530/

RECIPIENT

ID CODE/NAME

PD5

PD

DAVIS,M

RNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE

IEBE

,J

EG PIL

02

RGN

ILE

01

EXTERNAL: LPDR

NSIC

NOTES

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

2

2

1

1

1

1

.1

1

1

1

1

.1

1

1

1

1

RECIPIENT

ID CODE/NAME

LICITRA,E

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

I

0

S

h

D

D

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

28

ENCL

28

Docket Nos.

50-528

50"529

50-530

Arizona Nuclear

Power Project

P.

0.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr.

E.

E.

Van Brunt, Jr.

Executive Vice President

Gentlemen:

SUBJECT:

NRC Inspection of Palo Verde Units 1,

2 and 3.

This refers to the special

announced

inspection

conducted

by Mr. J.

F. Melfi

of this office, Mr.

B. Marcus of the office of Nuclear Reactor Regulation,

and

Mr. A.'dy,

NRC contractor,

on April 4 through April 8, 1988, of activities

authorized

by NRC License

Nos.

NPF-41,

NPF-51,

and NPF-74,

and to the

discussion of our findings held with Mr. J.

D. Driscoll, and other members of

your staff on April 8, 1988.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Mithin these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that one of your

activities deviated

from your commitments to the

NRC,

as set forth in the

Notice of Deviation, enclosed

herewith

as Appendix A.

Please

respond to this

notice as requested

in the Appendix.

In accordance

with 10

CFR 2.790(a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

The response

requested

by this letter

and the accompanying

notice are not

subject to the clearance

procedures

of the Office of Management

and Budget as

required

by the Paperwork Reduction Act of 1980,

PL 96-5ll.

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely

0r(9 idal5I g.fl<d

Robert J.

Pate,

Chief

Reactor Safety Branch

88058i0255 8805i2

PDR

ADOCK 05000528

9

DCD

FQ/

MAY f 2

1988

Enclosures:

1.

Notice of Deviation, Appendix A

2.

Inspection

Report

No. 50-528/88-12,

50-529/88"13,

50-530/88-12

cc w/enclosures

(1) and (2)

J.

G.

Haynes,

Vice President,

Nuclear Production

M.

F. quinn, Director, Nuclear Safety

8c Licensing

R.

Papworth, Director, equality Assurance

L. Souza,

Manager,

equality Audits 8 Monitoring

T.

D. Shriver,

Manager,

Compliance

C.

N.

Russo,

Manager,

gA Audits/Monitoring

L. Bernabei,

GAP

T. Hogan,

ACC

A.

C. Gehr, Snell

and Milmer

State of Arizona

bcc w/enclosures:

D. Persinko,

NRR

M.

R. Johnson,

NRR/ILRB

G. Knighton,

NRR/PD5

Project Inspector

Resident Inspector

G.

Cook

B. Faulkenberry

J. Martin

Docket File

bcc w/o enclosure

2:

LFMB

M. Smith

Region

V

QP g

JMel fi

SRiL'hards

5/sf /88/

5/ l> /88

AJo nson

5// /88

RJPate

5/f /88

[ REQUEST

COPY

g

EST

COPY

g RE/VEST

g

REQUEST

COPY

g

/

NO

ES /

NO

YES /

0

YES /

NO

[ SE

TO

~]

ES /