ML17303B096
| ML17303B096 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/29/1988 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 161-00992-EEVB, 161-992-EEVB, NUDOCS 8805090437 | |
| Download: ML17303B096 (4) | |
Text
p ACCEIZRATED D
BUTION DEMONS WTION SYSTEM P
I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8805090437 DOC.DATE: 88/04/29 NOTARIZED NO DOCKET g FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION VAN BRUNT,E.E.
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Corrects wording of commitment on Page 4 of insp rept for License NPF-65.
DISTRIBUTION CODE: IE01D COPIES RECEIVED: LTR i
ENCL Q SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Standardized plant.
05000530 ~
RECIPIENT ID CODE/NAME
'D5 PD DAVIS,M INTERNAL: ACRS DEDRO NRR/DLPQ/PEB 11 NRR/DOEA DIR 11
-JAR/DREP/RPB 10 NRR/PMAS/ILRB12 OE IEBERMAN,J REG FILEZ 02 RGNB FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 2
2 2
'2 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LICITRA,E AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC 15-B-18 RES/DRPS DIR NRC PDR COPIES LTTR ENCL 2
2 1
1 1
1 1
1 1
-1..
1 1'
1 1
1 1
1 1
1 I
A NOTES:
. 1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 28 ENCL
Hl i>
ii)
Arizona NuclearPower Project P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 161-00992-EEVB/RAB April 29; 1988 Docket No.
STN.50-530 U.
S. Nuclear Regulatory Commission Washington, D. C. 20555" ATTN: Document Control Desk
Reference:
(1) Letter from NRC to 'E.
E. Van Brunt, Jr,
- ANPP, dated April 5, 1988.
Subject:
NRC'nspection of Palo Verde Nuclear Generating Station, Unit No. 3.
(2) Letter fromJ.
G. Haynes, ANPP, to NRC, dated September 14, 1987'.
Subject:
Unit 3 "B" Diesel Generator Bearing Temperature Monitor.
Dear Sir:
Subject:
Palo Verde.Nucl'ear Generating. Station (PVNGS)
Unit 3 NRC'nspection of PVNGS Unit 3 File: 88-'019-026 ANPP has received the reference (1) letter, and we wish t'o correct the wording of the commitment on page. 4 of the Inspection Report.
As stated. on that page, ANPP committed to install the thermocouple/trip in the number 2 main bearing of the 3B diesel generator at the first outage of Unit 3 for any purpose.
In reference '2, ANPP committed to install the.
thermocouple/trip device the first time the unit is operating in MODE 5, after receiving the necessary parts.
As stated in our letter, due to the time required to complete the installation and testing of this device, the installation should be done in MODE '5.
ANPP has received'he necessary parts and intends to complete the installation as stated in reference (2).
If you have any questions on this matter, please contact Mr. R. A. Bernier of my staff.
Very truly ours E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/RAB/ls cc:
G.
W. Knighton T.'. Polich A. C. Gehr M. J.
Davis SS05090437'S0429 PDR ADOCK 05000530 DCD