ML17303B133

From kanterella
Jump to navigation Jump to search
Special Rept 2-SR-88-005:on 880509,inservice Insp of Steam Generators Completed Resulting in Plugging of 34 Tubes in Steam Generator 1 & 27 Tubes in Steam Generator 2.Complete Results of Insp Will Be Provided within 12 Months
ML17303B133
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/18/1988
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
192-00375-JGH-T, 192-375-JGH-T, 2-SR-88-005, 2-SR-88-5, NUDOCS 8805250365
Download: ML17303B133 (6)


Text

, ACCELERATED D1%1BUTION DEMONSTRATION SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8805250365 DOC.DATE: 88/05/18 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION HAYNES,J.G. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 2-SR-88-005:on 880509,inservice insp of steam generators completed resulting in plugging of tubes.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Standardized plant. 05000529 ~

8 RECIPIENT COPIES RECXPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 LICITRA,E 1 1 DAVIS,M 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 AEOD/DOA 1 1 AEOD/DSP/NAS 1 1 AEOD/DSP/ROAB 2 2' AEOD/DSP/TPAB 1 1 ARM/DCTS/DAB 1 DEDRO 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RAB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/DRIS/SIB 9A 1 1 S/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 EG FI 02 1 1 RES TELFORD,J 1 1 B 1 1 RES/DRPS DEPY 1 1 RGN5 FILE 01 1 1 EXTERNAL EG&G WILLIAMSg S 4 4 FORD BLDG HOY,A 1 1 H ST LOBBY NARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC HARRIS,J 1 1 NSIC MAYS,G 1 1 NOTES: 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 48 ENCL 47

II Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 192-00375-JGH/TDS/JEM May 18, 1988 U. S. Nuclear Regulatory Commission NRC Document Control Desk Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License No. NPF-51)

Special Report 2-SR-88-005 File: 88-020-404 Attached please find Special Report 2-SR-88-005 prepared and submitted pursuant to Technical Specification 3.3.4 and Technical Specification 6.9.2.

This report discusses steam generator tubes plugged as a result of an Inservice Inspection.

If you have any questions, please contact T. D. Shriver, Compliance Manager at (602) 393-2521.

Very tr y yours, 4J. G. K ynes Vice President Nuclear Production JGK/TDS/JEM/kj Attachment cc: 0. M. DeMichele (all w/a)

E. E. Van Brunt, Jr.

J. B. Hartin T. J. Polich E. A. Licitra A. C. Gehr INPO Records Center SS05250365 SS051S

/g g,$

I I

PDR ADOCK 05000529 S DCD

PALO VERDE NUCLEAR GENERATING STATION STEAM GENERATOR TUBE PLUGGING License No. NPF-51 Docket No. STN-529 Special Report 2-SR-88-005 This special report is required by Palo Verde Unit 2 Technical Specification 4.4.4.5 REPORTS a, within 15 days following the completion of each inservice inspection of steam generator tubes.

On May 9, 1988, Palo Verde Unit 2 was in Mode 6 (REFUELING), when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of 34 tubes in steam generator number 1 and 27 tubes in steam generator number 2 ~

The complete results of the steam generator tube inservice inspection will be submitted to the Commission in a Special Report within 12 months following completion of the inspection as required by Technical Specification section 4.4.4.5 REPORTS b.

l