Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203A855 + (06:59:15, 8 December 2024)
- ML20203A851 + (06:59:16, 8 December 2024)
- ML20203A853 + (06:59:16, 8 December 2024)
- ML20203A850 + (06:59:17, 8 December 2024)
- 05000265/LER-1986-004-06, :on 860314,HPCI Turbine Tripped Due to Turbine Exhaust Pressure Switch 2-2368A Failure.Caused by Corroded Seals in Pressure Switch Allowing Moisture in Casing.Switch Replaced + (06:59:19, 8 December 2024)
- TAC:M99688 + (06:59:20, 8 December 2024)
- PNO-II-97-062, on 971211,licensee Reported That Between Apr 1995 & Jul 1996 Nine Misadministrations Involving Sr-90 Eye Applicator Occurred,As Result of Apparent Incorrect Decay Calculation of Source.Commonwealth of Pr Will Be Notified + (06:59:20, 8 December 2024)
- ML20203A843 + (06:59:21, 8 December 2024)
- ML20203A844 + (06:59:21, 8 December 2024)
- ML20203A842 + (06:59:22, 8 December 2024)
- ML20203A841 + (06:59:23, 8 December 2024)
- ML20203A840 + (06:59:23, 8 December 2024)
- ML20203A839 + (06:59:24, 8 December 2024)
- ML20203A837 + (06:59:24, 8 December 2024)
- ML20203A836 + (06:59:25, 8 December 2024)
- ML20203A834 + (06:59:26, 8 December 2024)
- 05000483/LER-1998-002, :on 980115,determined That Missile Shield Had Not Been Closed During Past Eight Refueling Outages.Caused by TS Failing to Address Missile Shield During Refueling Outages.Developed Administrative Controls + (06:59:27, 8 December 2024)
- ML20203A831 + (06:59:28, 8 December 2024)
- ML20203A829 + (06:59:29, 8 December 2024)
- ML20203A826 + (06:59:29, 8 December 2024)
- ML20203A822 + (06:59:31, 8 December 2024)
- 05000245/LER-1998-001-02, :on 980109,MRP Determined That There Have Been Periods During Power Operation When Backup Pressure Regulator Was Oos.Caused by Inadequate Understanding of Safety Analysis.Evaluation Will Be Performed + (06:59:33, 8 December 2024)
- ML20203A819 + (06:59:34, 8 December 2024)
- ML20203A817 + (06:59:35, 8 December 2024)
- ML20203A813 + (06:59:36, 8 December 2024)
- ML20203A814 + (06:59:36, 8 December 2024)
- ML20203A812 + (06:59:37, 8 December 2024)
- ML20203A811 + (06:59:37, 8 December 2024)
- ML20203A808 + (06:59:38, 8 December 2024)
- ML20203A809 + (06:59:38, 8 December 2024)
- ML20203A806 + (06:59:39, 8 December 2024)
- ML20203A805 + (06:59:40, 8 December 2024)
- 05000263/LER-1986-008, :on 860307,isolations of Reactor Bldg Ventilation Sys & Initiations of Standby Gas Treatment Sys Occurred.Caused by Spurious hi-hi Trip from Channel B Gas Monitor.Test Switches Will Be Installed + (06:59:46, 8 December 2024)
- ML20203A797 + (06:59:47, 8 December 2024)
- ML20203A796 + (06:59:48, 8 December 2024)
- ML20203A793 + (06:59:49, 8 December 2024)
- ML20203A795 + (06:59:49, 8 December 2024)
- 05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl + (06:59:50, 8 December 2024)
- ML20203A789 + (06:59:50, 8 December 2024)
- ML20203A788 + (06:59:51, 8 December 2024)
- ML20203A781 + (06:59:52, 8 December 2024)
- ML20203A779 + (06:59:52, 8 December 2024)
- ML20203A778 + (06:59:53, 8 December 2024)
- ULNRC-03735, Forwards Rev 10 to Callaway Cycle 9 COLR, Providing Updated Modified Rod Insertion Limits for Cycle 9.Rept Submitted Per TS 6.9.1.9 + (06:59:53, 8 December 2024)
- ML20203A776 + (06:59:54, 8 December 2024)
- ML20203A773 + (06:59:55, 8 December 2024)
- ML20203A772 + (06:59:55, 8 December 2024)
- ML20203A771 + (06:59:56, 8 December 2024)
- U-603141, Constitutes Utils Final Response to Reporting Requirements Specified by GL 96-01, Testing of SR Logic Circuits. Completion of Requested Actions,Confirmed + (06:59:57, 8 December 2024)
- ML20203A770 + (06:59:57, 8 December 2024)
- ML20203A765 + (07:00:05, 8 December 2024)
- ML20203A759 + (07:00:06, 8 December 2024)