Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203A953 + (06:58:34, 8 December 2024)
- ML20203A950 + (06:58:35, 8 December 2024)
- ML20203A949 + (06:58:36, 8 December 2024)
- ML20203A947 + (06:58:36, 8 December 2024)
- B16950, Provides Response to Item I of GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (06:58:37, 8 December 2024)
- ML20203A946 + (06:58:37, 8 December 2024)
- ML20203A939 + (06:58:38, 8 December 2024)
- BSEP-99-0014, Withdraws 971114 Request for NRC Approval of Proposed Combined RPV Matl Surveillance Program & Associated Exemptions for Bsep,Units 1 & 2.Util Is Developing Integrated RPV Matl Surveillance Program,Per 10CFR50,App H + (06:58:39, 8 December 2024)
- ML20203A938 + (06:58:39, 8 December 2024)
- ML20203A933 + (06:58:40, 8 December 2024)
- ML20203A930 + (06:58:42, 8 December 2024)
- ML20203A927 + (06:58:43, 8 December 2024)
- ML20203A928 + (06:58:43, 8 December 2024)
- ML20203A926 + (06:58:44, 8 December 2024)
- ML20203A924 + (06:58:45, 8 December 2024)
- ML20203A923 + (06:58:46, 8 December 2024)
- ML20203A920 + (06:58:46, 8 December 2024)
- W3P86-2313, Application for Amend to License NPF-38,consisting of Tech Spec Change Requests NPF-38-24,-25,-26,-27 & -28 Re Revs to Axial Shape Index Allowable Ranges,Moderator Temp Coefficient Allowable Ranges & Insertion Limits.Fee Paid + (06:58:47, 8 December 2024)
- ML20203A918 + (06:58:47, 8 December 2024)
- ML20203A915 + (06:58:48, 8 December 2024)
- ML20203A913 + (06:58:49, 8 December 2024)
- VPN-016-98, Documents Extension for Submittal of Portland General Electric Co Response to NOV 50-344/97-05 Which Was Transmitted to Util W/Nrc Insp Rept 50-344/97-05 + (06:58:50, 8 December 2024)
- ML20203A911 + (06:58:50, 8 December 2024)
- ML20203A908 + (06:58:52, 8 December 2024)
- ML20203A907 + (06:58:53, 8 December 2024)
- ML20203A906 + (06:58:53, 8 December 2024)
- ML20203A903 + (06:58:54, 8 December 2024)
- ML20203A905 + (06:58:54, 8 December 2024)
- ML20203A902 + (06:58:55, 8 December 2024)
- ML20203A900 + (06:58:56, 8 December 2024)
- ML20203A899 + (06:58:56, 8 December 2024)
- 05000254/LER-1997-025-01, :on 961216,failed to Calibr APRM to Flow Signal within Required Interval.Caused by Inadequate Change Mgt.Counselled Personnel Responsible for Change,Conducted Trend Investigation & Revised Procedures + (06:58:58, 8 December 2024)
- ML20203A895 + (06:58:59, 8 December 2024)
- ML20203A892 + (06:59:00, 8 December 2024)
- NOC-AE-000094, Provides Notification of Removal of Restriction from Gw Wasek,Sro License 43666,effective 980211.W/o Attachment + (06:59:01, 8 December 2024)
- ML20203A891 + (06:59:01, 8 December 2024)
- ML20203A889 + (06:59:02, 8 December 2024)
- ML20203A887 + (06:59:02, 8 December 2024)
- ML20203A885 + (06:59:03, 8 December 2024)
- ML20203A883 + (06:59:04, 8 December 2024)
- ML20203A880 + (06:59:05, 8 December 2024)
- ML20203A881 + (06:59:05, 8 December 2024)
- NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center + (06:59:06, 8 December 2024)
- PNO-IV-86-024, on 860710,overflow of Approx 2,000 Gallons Occurred While Filling Emergency Diesel Fuel Oil Storage Tank.Augmented Fire Protection Measures Established.Cleanup Underway + (06:59:07, 8 December 2024)
- ML20203A875 + (06:59:07, 8 December 2024)
- ML20203A872 + (06:59:08, 8 December 2024)
- 05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed + (06:59:09, 8 December 2024)
- PY-CEI-NRR-2259, Plant,Jan-Dec 1997 Annual Rept to Nrc + (06:59:09, 8 December 2024)
- ML20203A865 + (06:59:10, 8 December 2024)
- B16868, Informs That J Rogers,SOP-10703-0 & D Bronson,SOP-10702-0,no Longer Need to Maintain Senior Operating Licenses + (06:59:11, 8 December 2024)
- ML20203A864 + (06:59:11, 8 December 2024)
- BVY-97-166, Requests Extension of Addl Fifteen Days to Respond to NRC 971120 RAI Re EDG Skid Mounted Piping + (06:59:12, 8 December 2024)