Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203B416 + (06:54:25, 8 December 2024)
- ML20203B414 + (06:54:29, 8 December 2024)
- ML20203B413 + (06:54:30, 8 December 2024)
- ML20203B412 + (06:54:30, 8 December 2024)
- ML20203B411 + (06:54:31, 8 December 2024)
- ML20203B408 + (06:54:32, 8 December 2024)
- ML20203B409 + (06:54:32, 8 December 2024)
- ML20203B406 + (06:54:33, 8 December 2024)
- ML20203B407 + (06:54:33, 8 December 2024)
- ML20203B404 + (06:54:37, 8 December 2024)
- 0CAN038608, Advises That Due to Author Appointment as Senior Vice President of Generation,Transmission & Engineering, G Campbell Designated Senior Nuclear Mgt Representative for Util.Future Correspondence Should Be Directed to Campbell + (06:54:38, 8 December 2024)
- ML20203B401 + (06:54:39, 8 December 2024)
- ML20203B399 + (06:54:39, 8 December 2024)
- ML20203B398 + (06:54:40, 8 December 2024)
- ML20203B396 + (06:54:40, 8 December 2024)
- ML20203B395 + (06:54:41, 8 December 2024)
- ML20203B393 + (06:54:42, 8 December 2024)
- ML20203B392 + (06:54:45, 8 December 2024)
- ML20203B391 + (06:54:46, 8 December 2024)
- ML20203B390 + (06:54:46, 8 December 2024)
- ML20203B385 + (06:54:47, 8 December 2024)
- ML20203B386 + (06:54:47, 8 December 2024)
- 05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121 + (06:54:53, 8 December 2024)
- ML20203B378 + (06:54:57, 8 December 2024)
- ML20203B373 + (06:54:58, 8 December 2024)
- ML20203B374 + (06:54:58, 8 December 2024)
- ML20203B371 + (06:54:59, 8 December 2024)
- ML20203B372 + (06:54:59, 8 December 2024)
- ML20203B367 + (06:55:00, 8 December 2024)
- ML20203B369 + (06:55:00, 8 December 2024)
- ML20203B365 + (06:55:01, 8 December 2024)
- ML20203B364 + (06:55:02, 8 December 2024)
- ML20203B362 + (06:55:03, 8 December 2024)
- ML20203B361 + (06:55:04, 8 December 2024)
- ML20203B360 + (06:55:04, 8 December 2024)
- ML20203B359 + (06:55:05, 8 December 2024)
- ML20203B356 + (06:55:06, 8 December 2024)
- ML20203B354 + (06:55:07, 8 December 2024)
- ML20203B352 + (06:55:07, 8 December 2024)
- ML20203B350 + (06:55:08, 8 December 2024)
- ML20203B351 + (06:55:08, 8 December 2024)
- NSD-NRC-97-5454, Discusses SSAR Rev,Proposing Suppl Criteria That Would Require Min Shear Reinforcement at Most Locations of AP600 Basemat.Draft SSAR Rev Encl + (06:55:09, 8 December 2024)
- ML20203B348 + (06:55:09, 8 December 2024)
- ML20203B345 + (06:55:15, 8 December 2024)
- ML20203B343 + (06:55:15, 8 December 2024)
- ML20203B342 + (06:55:16, 8 December 2024)
- 1CAN048605, Provides Info to Document 860327 Telcon Re Seismic Design Issue Noted in Insp Rept 50-313/86-01 on 860106-31.Disagrees W/Nrc Conclusion That Seismic Class 2 Structures Not Considered in Plant Design + (06:55:17, 8 December 2024)
- ML20203B336 + (06:55:17, 8 December 2024)
- ML20203B334 + (06:55:19, 8 December 2024)
- ML20203B333 + (06:55:19, 8 December 2024)
- ML20203B332 + (06:55:20, 8 December 2024)
- ML20203B330 + (06:55:22, 8 December 2024)