Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203B539 + (06:53:17, 8 December 2024)
- ML20203B535 + (06:53:18, 8 December 2024)
- ML20203B536 + (06:53:18, 8 December 2024)
- ML20203B533 + (06:53:19, 8 December 2024)
- ML20203B531 + (06:53:20, 8 December 2024)
- ML20203B532 + (06:53:20, 8 December 2024)
- ML20203B528 + (06:53:25, 8 December 2024)
- ML20203B527 + (06:53:26, 8 December 2024)
- ML20203B523 + (06:53:27, 8 December 2024)
- ML20203B522 + (06:53:28, 8 December 2024)
- B16894, Notifies That on 970919,Regulatory Compliance at Facilities Consolidated & Now Reports to Unit 2 Director of Unit Svcs, in Response to Violation B of NOV Associated W/Insp Repts 50-245/96-09,50-336/96-09 & 50-423/96-09 + (06:53:29, 8 December 2024)
- ML20203B519 + (06:53:30, 8 December 2024)
- ML20203B518 + (06:53:30, 8 December 2024)
- ML20203B515 + (06:53:31, 8 December 2024)
- ML20203B517 + (06:53:31, 8 December 2024)
- ML20203B514 + (06:53:32, 8 December 2024)
- ML20203B513 + (06:53:33, 8 December 2024)
- ML20203B509 + (06:53:34, 8 December 2024)
- ML20203B506 + (06:53:35, 8 December 2024)
- ML20203B503 + (06:53:39, 8 December 2024)
- 05000289/LER-1986-006, :on 860315,turbine/reactor Tripped.Caused by Low Oil Pressure.Procedure Changes Initiated to Ensure Standby Lube Oil Cooler Filled & Pressurized Prior to Attempting to Swap Coolers + (06:53:41, 8 December 2024)
- ML20203B501 + (06:53:42, 8 December 2024)
- 05000424/LER-1998-003, :on 980128,I&C Personnel Were Conducting 18 Month Calibrations on Neutron Flux Monitoring System Unit 2 Train B RSP Indicators.Caused by Circuit Board Failure. Unit 2 Testing Was Peformed + (06:53:44, 8 December 2024)
- ML20203B498 + (06:53:45, 8 December 2024)
- ML20203B496 + (06:53:45, 8 December 2024)
- ML20203B495 + (06:53:47, 8 December 2024)
- ML20203B490 + (06:53:48, 8 December 2024)
- ML20203B494 + (06:53:48, 8 December 2024)
- ML20203B489 + (06:53:49, 8 December 2024)
- ML20203B487 + (06:53:50, 8 December 2024)
- ML20203B476 + (06:53:53, 8 December 2024)
- ML20203B475 + (06:53:54, 8 December 2024)
- ML20203B473 + (06:53:55, 8 December 2024)
- ML20203B469 + (06:53:56, 8 December 2024)
- ML20203B467 + (06:53:57, 8 December 2024)
- ML20203B468 + (06:53:57, 8 December 2024)
- ML20203B464 + (06:53:58, 8 December 2024)
- ML20203B463 + (06:53:58, 8 December 2024)
- ML20203B462 + (06:53:59, 8 December 2024)
- ML20203B461 + (06:54:00, 8 December 2024)
- 05000306/LER-1998-001-01, :on 980121,10 Transformers Were Locked Out. Caused by Cognitive Error by Sys Engineer Writing Work Order to Isolate Breaker 1H3.Revised Procedures + (06:54:01, 8 December 2024)
- ML20203B458 + (06:54:02, 8 December 2024)
- W3P86-0178, Requests That 851202 Tech Spec Change Request NPF-38-10 to Amend Administrative Control Section 6.4.1 Be Withdrawn + (06:54:03, 8 December 2024)
- ML20203B453 + (06:54:04, 8 December 2024)
- ML20203B454 + (06:54:04, 8 December 2024)
- ML20203B452 + (06:54:06, 8 December 2024)
- ML20203B451 + (06:54:06, 8 December 2024)
- ML20203B449 + (06:54:07, 8 December 2024)
- ML20203B450 + (06:54:07, 8 December 2024)
- ML20203B447 + (06:54:08, 8 December 2024)
- ML20203B448 + (06:54:08, 8 December 2024)
- 05000309/LER-1986-003, :on 860612,trip Occurred Due to Inadvertent Closure of Main Steam Line Excess Flow Check Valve.Caused by Failure of Rupture Disks.Several long-term Measures Addressing Rupture Disk Failure Initiated + (06:54:10, 8 December 2024)