Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G267 + (06:01:56, 8 December 2024)
- PNO-III-93-027, on 930504,listed Individuals Filed Suit Against NRC on Dry Cask Storage Sys at Plant.Util Planning to Begin Movement of Sf Into Storage Casks on 930507 + (06:01:56, 8 December 2024)
- ML20203G264 + (06:01:57, 8 December 2024)
- ML20203G261 + (06:01:58, 8 December 2024)
- ML20203G263 + (06:01:58, 8 December 2024)
- ML20203G259 + (06:01:59, 8 December 2024)
- ML20203G258 + (06:02:00, 8 December 2024)
- ML20203G256 + (06:02:03, 8 December 2024)
- ML20203G254 + (06:02:04, 8 December 2024)
- ML20203G255 + (06:02:04, 8 December 2024)
- ML20203G249 + (06:02:08, 8 December 2024)
- 05000346/LER-1986-015, :on 860321,domestic Water Lines Servicing Shower Eye Washes in Battery Rooms a & B Not Seismically Supported & Threatened safety-related Battery Chargers.Lines Removed.Portable Eye Wash Stations Installed + (06:02:10, 8 December 2024)
- ML20203G246 + (06:02:11, 8 December 2024)
- ML20203G243 + (06:02:13, 8 December 2024)
- PNO-III-93-038, on 930701,licensee Discovered Highly Radioactive Object on Floor of upender-tilt Pit in Refueling Area of Containment.There Have Been No Radiation Overexposures as Result of Event + (06:02:13, 8 December 2024)
- ML20203G241 + (06:02:14, 8 December 2024)
- 05000304/LER-1986-011-04, :on 860324,during Periodic Test of Nuclear Instrumentation Sys Reactor Protection Logic,Reactor Tripped.Caused by Procedural Deficiencies Resulting in Induced Noise.Revs to Procedures Planned + (06:02:15, 8 December 2024)
- ML20203G239 + (06:02:16, 8 December 2024)
- ML20203G237 + (06:02:17, 8 December 2024)
- ML20203G236 + (06:02:18, 8 December 2024)
- 05000529/LER-1986-014, :on 860325,during Plant Protection Sys Monthly Functional Test,Main Steam Isolation Sys Actuation on Trains a & B Occurred.Caused by Technicians Not Adhering to Procedural Instructions.Technicians Counseled + (06:02:20, 8 December 2024)
- 05000282/LER-1986-003-01, :on 860324,during Testing of Substation Equipment,Loss of One Source of Offsite Power & Automatic Start of Emergency Diesel Generators Occurred.Caused by Technician Error.Event Reviewed W/Personnel + (06:02:26, 8 December 2024)
- ML20203G231 + (06:02:27, 8 December 2024)
- ML20203G229 + (06:02:28, 8 December 2024)
- PNO-III-92-035A, on 920625,AIT Completed Onsite Review of 960608 Fuel Element Incident,In Which Fuel Elements Removed from Reactor Core While Reactor Critical & at Very Low Power.No Significant Consequences of Incident Occurred + (06:02:28, 8 December 2024)
- 05000387/LER-1986-011, :on 860325,reactor Protection Sys Actuated. Caused by Maint Personnel Error,Resulting in Upscale Spike from Intermediate Range Monitor.Existing Procedures Adequate.No Further Action Planned + (06:02:30, 8 December 2024)
- ML20203G227 + (06:02:31, 8 December 2024)
- ML20203G226 + (06:02:31, 8 December 2024)
- ML20203G225 + (06:02:32, 8 December 2024)
- ML20203G224 + (06:02:33, 8 December 2024)
- ML20203G223 + (06:02:33, 8 December 2024)
- ML20203G222 + (06:02:34, 8 December 2024)
- ML20203G219 + (06:02:38, 8 December 2024)
- ML20203G217 + (06:02:39, 8 December 2024)
- PNO-V-93-008, on 930222,State of California Licensed Well Logging Company Notified Region V That 100 Mci Cs-137 Sealed Source Was Discovered Missing from Storage Container Following Shipment of Container to Offshore Oil Platform + (06:02:39, 8 December 2024)
- ML20203G214 + (06:02:40, 8 December 2024)
- ML20203G215 + (06:02:40, 8 December 2024)
- PNO-II-93-008A, on 930301,plant Was Manually Tripped from Full Power When Operators Noticed Increase in Main Generator Voltage.Leak Believed to Be Caused by Erosion of Piping + (06:02:41, 8 December 2024)
- ML20203G208 + (06:02:42, 8 December 2024)
- ML20203G212 + (06:02:42, 8 December 2024)
- ML20203G202 + (06:02:45, 8 December 2024)
- ML20203G201 + (06:02:46, 8 December 2024)
- ML20203G199 + (06:02:47, 8 December 2024)
- ML20203G198 + (06:02:48, 8 December 2024)
- ML20203G197 + (06:02:48, 8 December 2024)
- BVY-97-171, Special Rept:On 971105,fire Alarm Panel & Suppression Sys Were Out of Svc Greater than 14 Days.Caused by Hardware Problems W/New Zone Modules Developed During Mods.Sys Placed Back in Svc on 971121 + (06:02:49, 8 December 2024)
- ML20203G194 + (06:02:50, 8 December 2024)
- ML20203G193 + (06:02:51, 8 December 2024)
- PNO-III-92-058, on 921022,licensee Identified 7 Inch Long Crack at Weld Interface Between First 18 Inch Weldlet & 30 Inch Condensate Header for Number 4 Direct Contact Feedwater Heater.Licensee Decided to Commence Plant Shutdown + (06:02:53, 8 December 2024)
- ML20203G189 + (06:02:53, 8 December 2024)
- ML20203G186 + (06:02:54, 8 December 2024)
- ML20203G184 + (06:02:54, 8 December 2024)