ML20203G227
Person / Time
Site: Beaver Valley
Issue date: 07/28/1986
From: Tam P
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20199F520 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8608010035
Download: ML20203G227 (2)


Text

, _ - _ -

Docket No. 50-412 NRC PDR ^ D. Miller Local PDR ACRS (10)

Mr. J. J. Carey, Vice President PADf2 Rdg Tech Branch Duquesne Light Company T. Novak Gray File Nuclear Group OGC Post Office Box 4 E. Jordan Shippingport, PA 15077 B. Grimes J. Partlow

Dear Mr. Carey:

N. Thompson, DHFT

Subject:

Beaver Valley Unit 2 - Detailed Control Poom Design Review (DCRDR)

Interim SER The enclosed Safety Evaluation Report (SER) contains the results of our evaluation of the Beaver Valley Power Station, Unit 2 DCRDR. Assisted by consultants from Lawrence Livemore National Laboratories, we have reviewed your DCRDR Sumary Report and conducted a pre-implementation onsite audit of the DCRDR on February 11 and 12,1986. A Technical Evaluation Report (TER) was prepared by our consultants and is attached to the interim SER. We agree with the technical positions and conclusions presented in the TER.

The organization, process and results of the BVPS-2 DCRDR were compared to the guidelines of Supplement I to NUREG-0737 and Section 18.1 of the Standard Review Plan. DLC has conducted a comprehensive DCRDR and we conclude that DLC has generally satisfied the guidelines of Supplement 1 to NUREG-0737. Several items remain to be completed and must be addressed in a supplemental sumary report to be submitted at least 120 days prior to loading fuel for review and approval by the staff. These items are described in the enclosed interim SER and TER.

This information request affects fewer than 10 respondents; therefore, OPB clearance is not required under P.L.96-511.

Sincerely, Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page L & PM: PAD #2a D.P dr PTam:h ' LRubenstein 7/J 86 7/lf/8 724/86 8600010035 DR 860728 ADOCK 05000412 PDR

Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station cc:

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Jay E. Silberg, Esq. Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Beaver Valley Two Project Washington, DC 20036 P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Director, Pennsylvania Emergency Management Agency Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 i Shippingport, Pennsylvania 15077 U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre .

301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 l U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229 i

. - .