Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A565 + (16:38:17, 7 January 2025)
- ML17345A564 + (16:38:18, 7 January 2025)
- ML17345A562 + (16:38:19, 7 January 2025)
- ML17345A560 + (16:38:21, 7 January 2025)
- ML17345A559 + (16:38:22, 7 January 2025)
- ML17345A558 + (16:38:24, 7 January 2025)
- ML17345A556 + (16:38:25, 7 January 2025)
- L-88-518, Provides Addl Info Re Drawing Update Program at Plant,Per 881114 Mgt Meeting.Small Bore Piping & Tubing on Selected safety-related & Important to Safety Sys Were Walked Down to Verify Functionality & Develop Isometrics + (16:38:26, 7 January 2025)
- L-88-509, Forwards mgt-on-shift Weekly Rept for Wk Starting 881111,per 871019 Order.Plant Supervisor Nuclear Shift Repts Also Encl + (16:38:28, 7 January 2025)
- ML17345A553 + (16:38:31, 7 January 2025)
- IR 05000250/1988029 + (16:38:35, 7 January 2025)
- ML17345A548 + (16:38:37, 7 January 2025)
- L-88-502, Forwards Select Sys Assessment Progress Summary for Oct 1988 + (16:38:44, 7 January 2025)
- L-88-500, Forwards mgt-on-shift Weekly Repts for Wk Starting 881104, Per 871019 Order & Plant supervisor-nuclear Shift Repts + (16:38:47, 7 January 2025)
- ML17345A541 + (16:38:49, 7 January 2025)
- 05000250/LER-1986-041, :on 860201,RHR Pumps Not in Operation,Per Tech Spec During Refueling Pool Fill During Previous Refueling Outage.Caused by Inadequate Review of Plant Procedures. Administrative Procedure 103.18 Revised + (16:38:51, 7 January 2025)
- L-88-491, Forwards Summary of mgt-on-shift Weekly Repts,Per Commission 871019 Order + (16:38:52, 7 January 2025)
- L-88-501, Special Rept:On 881012,13,25 & 28,five Fire Protection Impairments Left Open in Excess of Tech Specs Permitted Time Limits.Caused by Either Plant Mods or Equipment Maint.Plant Continues to Implement Compensatory Measures as Applicable + (16:38:54, 7 January 2025)
- ML17345A537 + (16:38:56, 7 January 2025)
- L-88-496, Revised Semiannual Radiactive Effluent Release Rept, Jan-June 1988 + (16:38:57, 7 January 2025)
- IR 05000250/1988025 + (16:39:00, 7 January 2025)
- 05000250/LER-1988-025, :on 881013,determined That Potential Interaction Existed Between Emergency Diesel Generator Pump Control Sys Which Could Have Prevented Fulfillment of Safety Function.Caused by Inadequate Design + (16:39:02, 7 January 2025)
- L-88-497, Monthly Operating Repts for Oct 1988 for St Lucie Units 1 & 2 + (16:39:03, 7 January 2025)
- ML17345A528 + (16:39:05, 7 January 2025)
- ML17345A527 + (16:39:06, 7 January 2025)
- 05000353/LER-1917-008, Regarding Eog Inoperable for Greater than 30 Days Resulting in Condition Prohibited by Technical Specifications + (16:39:08, 7 January 2025)
- ML17345A518 + (16:39:13, 7 January 2025)
- ML17345A517 + (16:39:16, 7 January 2025)
- RAIO-1217-57401, LLC - Response to NRC Request for Additional Information No. 219 (Erai No. 8998) on the NuScale Design Certification Application + (16:39:17, 7 January 2025)
- ML17345A516 + (16:39:17, 7 January 2025)
- W3F1-2017-0080, Submittal of Technical Requirements Manual Update + (16:39:25, 7 January 2025)
- W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 + (16:39:28, 7 January 2025)
- IR 05000250/1988021 + (16:39:30, 7 January 2025)
- L-88-485, Forwards mgt-on-shift Weekly Rept for Wk Starting 881021. Areas for Improvement Include,Communication,Labeling & Resspirator Requirements + (16:39:31, 7 January 2025)
- ML17345A505 + (16:39:34, 7 January 2025)
- L-88-477, Forwards mgt-on-shift Weekly Rept,Per 871019 Order.Plant Supervisor Nuclear Shift Repts Also Encl + (16:39:36, 7 January 2025)
- ML17345A503 + (16:39:40, 7 January 2025)
- L-88-489, Informs of Desire to Discuss PRA at 881114 Mgt Meeting + (16:39:41, 7 January 2025)
- L-88-481, Provides Info in Response to Request Re Application of Leak Before Break Technology to Primary Coolant Sys Piping at Plant + (16:39:44, 7 January 2025)
- L-88-475, Provides Supplemental Response to NRC Bulletin 88-004 Re Potential safety-related Pump Loss + (16:39:46, 7 January 2025)
- L-88-471, Special Rept:Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Util Making Effort to Obtain Required Parts.Compensatory Measures Continue to Be Implemented as Applicable + (16:39:48, 7 January 2025)
- 05000250/LER-1988-024, :on 881001,RHR Pump Declared Out Svc Due to Leakage from Pump Seal.Cause Not Identified.Seal Cooler Flushed Prior to Reassembly to Remove Foreign Matl & Installation Technique Revised + (16:39:52, 7 January 2025)
- IR 05000250/1988031 + (16:39:54, 7 January 2025)
- ML17345A495 + (16:39:55, 7 January 2025)
- ML17345A494 + (16:39:56, 7 January 2025)
- ML17345A493 + (16:40:00, 7 January 2025)
- IR 05000250/1988024 + (16:40:05, 7 January 2025)
- ML17345A489 + (16:40:07, 7 January 2025)
- IR 05000250/1988026 + (16:40:12, 7 January 2025)
- ML17345A486 + (16:40:14, 7 January 2025)
- ML17345A485 + (16:40:16, 7 January 2025)