L-88-502, Forwards Select Sys Assessment Progress Summary for Oct 1988

From kanterella
Jump to navigation Jump to search
Forwards Select Sys Assessment Progress Summary for Oct 1988
ML17345A543
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/23/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-502, NUDOCS 8811290367
Download: ML17345A543 (6)


Text

ta ACCELERATZD DI

'BUTJON DEMONSTRA, ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811290367 DOC.DATE: 88/11/23 NOTARIZED: NO

.FACIL:50-250 Turkey.Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards select sys assessment progress rept for Oct Q.988.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR g ENCL $

SIZE:

TITLE: OR Submittal:

General Distribution DOCKET C.'5000250 05000251 NOTES".

RECIPIENT

,ID)CODE/NAME

,PD2-2 LA

,:EDISON,G I

INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB ll NU BSTRACT G FILE COPIES LTTR"ENCL

~*1

'0 1

1 1

0 1

1 1

1 1

1 1

1 1

1 RECIPIENT COPIES

,) ID CODE/NAME'", LTTR ENCL'>'D2-2 PD 2

2 NRR/DEST/ADS 7E 1

1 NRR/DEST/ESB 8D 1

1 NRR/DEST/RSB 8E 1

1 NRR/PMAS/ILRB12 1

1 OGC/HDS2 1

0 RES/DSIR/EIB 1

1 D

I 8

A

'D Dll I

EXTERNAL: LPDR NSFC 1

1 1

1 NRC PDR 1

1 il't n1 NOZE 'IO ALL "RIDS" RECIPIENTS:

PIZASE HELP US XO REDUCE WASTE 02KACZ IHE DOCUMENZ CGHTROL DESKS RXM Pl-37 (EZT. 20079)

TO ELIMINATE YOUR MME FMM DISTRIK7ZION LISTS H)R DOCUMEMIS YOU DGNiT NEEDk A

D.

D'OTAL NUMBER"OF COPIES 'REQUIRED:

LTTR 19 ENCL 16

r

,~

8 ~

1, ll

P.

X 14000, JUNO BEACH, FL 33408-0420 NOVEMBER 2 3 1988 L-88-502 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos.

50-250 and 50-251 Select S stem Assessment Pro ress Summer Pursuant to the Nuclear Regulatory Commission Order dated August 12,

1986, the attachment, to this letter provides the October 1988 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, W. F.

Senio nway ice President

- Nuclear WFC/SDF/gp Attachment cc:

Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant SDF.SS

)0 8811290367 881123 PDR ADOCK 05000250 R

PDC an FPL Group company

Attachment SELECT SYSTEM REVIEW OCTOBER 1988 PROGRESS Desi n Basis Reconstitution Phase II review of historic Plant Changes/Modifications (PC/M's) under the Risk Based Assessment program is continuing.

This has been incorporated into the Design Basis Verification task discussed below.

Reconstitution of design bases for Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Cooling was completed with the issuance of draft design basis documents.

This completes FPL's commitment regarding this task.

Design Basis Verification for these systems will proceed in accordance with the Integrated Schedule.

Completion of this activity is scheduled for June 1,

1989.

Design Basis Verification activities for the original fifteen Select Systems continues in accordance with the Integrated Schedule.

Completion of this activity is scheduled for May 8, 1989.

Walkdowns Unit 3

4 P

& ID and Small Bore Piping and Tubing walkdowns of Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Cooling are proceeding in accordance with the Integrated Schedule.

The inside Unit 4 Containment P

& ID walkdown task was completed.

The inside

Unit, 4

Containment Small Bore Piping and Tubing walkdowns are scheduled for completion by the end of the current refueling outage.

Other Si nificant Pro ress Efforts are underway on Unit 4 outage related modifications and repairs identified by the Integrated Schedule as FPL's commitments to the NRC under this program.

The task to provide a permanent nitrogen backup system to the main steam isolation valves has been replaced by a modification to add air accumulators in place of the nitrogen system.

DOCKET NO(S) 50-250/50-251 Mr. W. F.

Conway Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company Posh Office Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT AND NORTH ANNA

'I,STRI'BUTION N

b

'lS.

1988 PDI.I:,2 kg Fi,l vi(o encl, G, -Edi.'son w/encl, D ttli.lier w/encl The following documents concerning our review of the subject facility are transmitted for your informati on.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

'ated Environmental Assessment and Finding of,-No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated

[jQ Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated 11/2/88 Lsee page(8) j Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.,

Amendment No.

dated Order Extending Construction Completion Date, dated I

Monthly Operating 'Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by'etter dated

Enclosures:

As stated cc:

See next page Divisoon of Reactor Projects I/II Office of Nuclear Reactor Regulation~