ML17345A556
| ML17345A556 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/23/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17345A557 | List: |
| References | |
| NUDOCS 8812080050 | |
| Download: ML17345A556 (3) | |
See also: IR 05000250/1988028
Text
DOCKET ¹
05000250
05000251
NOTES:
gc CE~~~
DISTKBU'2ON
DKM0. iSTRATION
SY.FTEM
4i
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8812080050
DOC.DATE: 88/11/23
NOTARIZED: NO
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
AUTH.NAME
AUTHOR AFFILIATION
HERDT,A.R.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY W.Fz
Florida Power
& Light Co.
/
SUBJECT:
Forwards
Insp Repts
50-250/88-28
& 50-251/88-28
on 881003-07
& 881017-21
DISTRIBUTION CODE:
IEOZD
COPIES
RECEIVED:LTRj
ENCLj
SIZE: AV /
T1TLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
R
I
RECIPIENT
ID CODE/NAME
PD2-2
RGN2
XTERNAL: LPDR
INTERNAL: AEOD
NRR MORISSEAUiD
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1
1
1
.RECIPIENT
ID CODE/NAME
EDISON,G
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBERMANiJ
EG
L
02
NRC PDR
RESL MARTINPD
'COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
R
I
NOZE 'IO ALL RIDS". RECIPIENTS:
PLEASE HELP US XO REDUCE HASTE!
CXNQKT 'IHE DXUMEÃZ CGNIROL DESK,
RtXN Pl-37
(EXT. 20079)
TO ELIKBQTR YOUR KQK FBCH DIPHGEPZIQN
LIBTS mR DOCKS mu rmiT NEEDt
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
Docket Nos. 50-250,
50-251
License
Nos.
Nov RSSBB
Florida Power
and Light Company
ATTN:
Mr.
W. F.
Conway
Senior Vice'resident - Nuclear
P. 0.
Box 14000
Juno Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-250/88-28
AND 50-251/88-28)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
William P. Kleinsorge
on October
3-7 and October 17-21,
1988.
The inspection-
included
a review of activities authorized for your Turkey Point facility.
At
the conclusion of the inspection,
the findings were discussed
with those
members
of your staff identified in the enclosed
Inspection
Report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection 'consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
The inspection
findings indicate that certain activi ties
appeared
to violate
NRC requirements.
The violations,
references
to pertinent
requirements,
and
elements
to be included in your response
are described
in. the enclosed
Notice
of Violation.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required by the
Paperwork Reduction Act of 1980,
Pub.
L. No,96-511.
8812080050
881123
- DOCK 050002>0
G
PNU
Power
and Light Company
NOV 23 1988
Should you have any questions
concerning this letter-, please
contact us.
Sincerely,
QR)Q)MAL ")Gl","D BY
ALA,g R. Hit,'DT
Alan R. Herdt, Chief
Engineering
Branch
.
Division-of Reactor
Safety
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
A. S.
Odom, Vice President
Turkey Point Nuclear Plant-
+.
E. Cross,
Plant Manager
Turkey Point Nuclear Plant
~.
W. Bladow, Plant
gA Superintendent
Q. Arias, Jr., Regulatory
and Compliance
Supervisor
State of Florida
~
~
~
cc w/encls:
G.
E. Edison, Project Manager, Project
Directorate II-2, Division of Reactor
Projects,
~RC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
I
g~
R
~
~
p
einsorge: tj
arri on
1//'t /SS
//1/SS
Blake
r//1/ss
R Crlenjak
u./g/SS