Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17347A951 + (15:29:18, 7 January 2025)
- ML17347A950 + (15:29:20, 7 January 2025)
- ML17347A949 + (15:29:21, 7 January 2025)
- ML17347A948 + (15:29:22, 7 January 2025)
- PNO-II-89-008A, on 890116,during Plant Shutdown Required by Tech Spec Update Licensee Discovered Incore Flux Mapping Thimble Tubes Cracked & Leaking.Thimble Tube Conduit Cut Out of Seal Table & Replaced.Unit to Be Placed on Line 890202 + (15:29:24, 7 January 2025)
- ML17347A946 + (15:29:25, 7 January 2025)
- IR 05000250/1988036 + (15:29:27, 7 January 2025)
- ML17347A943 + (15:29:29, 7 January 2025)
- PNO-II-89-008, former Employee Filed Numerous concerns,2.206 Petition & Complaint W/Dept of Labor Re Plant & Submitted All Records & Files to Segments of Media.Petitioner Concerns Previously Identified & Addressed in NRC Insp Repts + (15:29:32, 7 January 2025)
- ML17347A941 + (15:29:33, 7 January 2025)
- ML17347A940 + (15:29:34, 7 January 2025)
- ML17347A939 + (15:29:36, 7 January 2025)
- ML17347A938 + (15:29:37, 7 January 2025)
- ML17347A937 + (15:29:38, 7 January 2025)
- ML17347A936 + (15:29:40, 7 January 2025)
- ML17347A935 + (15:29:41, 7 January 2025)
- ML17347A933 + (15:29:42, 7 January 2025)
- ML17347A931 + (15:29:44, 7 January 2025)
- ML17347A929 + (15:29:45, 7 January 2025)
- L-89-025, Forwards Dec 1988 Select Sys Assessment Progress Summary,Per Commission 860812 Order + (15:29:46, 7 January 2025)
- ML17347A926 + (15:29:50, 7 January 2025)
- ML17347A925 + (15:29:51, 7 January 2025)
- ML17347A923 + (15:29:52, 7 January 2025)
- PNO-II-89-006, on 890116,discovered That Incore Flux Mapping Thimble Tube J12 Cracked & Leaking at Rate of Approximately 18 Drops/Min.Plant Cooldown to Cold Shutdown Was Commenced. Licensee Evaluating Problem + (15:29:56, 7 January 2025)
- ML17347A921 + (15:29:57, 7 January 2025)
- PNO-II-89-005, on 890107,reactor Operator Noted Decreasing Pressurizer Level.Caused by Leak from Nonrunning RHR 3B Pump Discharge Line Drain Isolation Valve.Valve Closed & Leak Secured.Root Cause Under Investigation + (15:29:59, 7 January 2025)
- ML17347A919 + (15:30:01, 7 January 2025)
- ML17347A913 + (15:30:02, 7 January 2025)
- ML17347A912 + (15:30:03, 7 January 2025)
- ML17347A911 + (15:30:05, 7 January 2025)
- ML17347A910 + (15:30:06, 7 January 2025)
- ML17347A907 + (15:30:07, 7 January 2025)
- PLA-7665, No Action Safety Function Anchor Darling Double Disc Gate Valves + (15:30:08, 7 January 2025)
- ML17347A905 + (15:30:11, 7 January 2025)
- ML17347A904 + (15:30:12, 7 January 2025)
- ML17347A902 + (15:30:14, 7 January 2025)
- ML17347A895 + (15:30:16, 7 January 2025)
- 05000250/LER-1988-032, :on 881202,personnel Error Resulted in Loss of Power to Vital Instrument Bus & Isolation of Stated Ventilation Sys.Operator Counseled.Spare Inverter Relabeled as Spare & Procedures Revised + (15:30:19, 7 January 2025)
- 05000250/LER-1988-028, :on 881117,control Room Ventilation Sys Shifted to Recirculation Mode While Conducting Test of Channel B Air Intake Radiation Monitor RAI 6642.Caused by Maladjustment of Monitor During Calibr.Instruction Revised + (15:30:23, 7 January 2025)
- L-88-510, Submits Requested Addl Info Re Emergency Power Sys Enhancement Project.Project Will Be Implemented in Two Phases Consisting of Outage & pre-outage Activities to Meet Integrated Schedule 1990 Completion Date + (15:30:28, 7 January 2025)
- ML17347A881 + (15:30:31, 7 January 2025)
- L-88-478, Forwards Comments on Proof & Review Version of Tech Specs Issued to Util on 880609,in Form of marked-up Pages.Further Comments Resulting from Issues Identified Late in Review Will Be Provided During Comment Resolution Period + (15:30:33, 7 January 2025)
- ML17347A879 + (15:30:36, 7 January 2025)
- L-88-452, Forwards mgt-on-shift Weekly Rept for Wk Starting 880930 + (15:30:38, 7 January 2025)
- ML17347A877 + (15:30:41, 7 January 2025)
- L-88-460, Submits Fee for 880527 Application for Review of Electrical Power Sys Enhancements + (15:30:42, 7 January 2025)
- ML17347A875 + (15:30:46, 7 January 2025)
- 05000250/LER-1988-022, :on 880920,emergency Diesel Generator a Declared out-of-svc Due to High Fuel Oil Pressure.Diesel Generator B out-of-svc Since 880917.Caused by Excessive Particles in Filter.Filter Replaced + (15:30:51, 7 January 2025)
- IR 05000250/1988020 + (15:30:54, 7 January 2025)
- L-88-435, Forwards Integrated Schedule Monthly Summary for Sept 1988 + (15:30:57, 7 January 2025)
- L-88-451, Special Rept:Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Caused by Duration of Work Required to Replace One of Component Cooling Water Hxs.Compensatory Measure Implemented + (15:31:00, 7 January 2025)