ML17347A912
| ML17347A912 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/11/1989 |
| From: | Decker T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8901260089 | |
| Download: ML17347A912 (6) | |
Text
~ gC CKEZRATED DlSTR1BUTI ON DEMONSTRATION SYFI'Eg I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
P ACCESSION NBR:8901260089 DOC.DATE: 89/01/11 NOTARIZED:
NO DOCKET FACIL;.50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
05000250 I
~
~
50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION ECKER,T.R.
Division of Radiation Protection
& Emergency Preparedness RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.,
SUBJECT:
Ack receipt of analytical results
& comparisons of E
non-radiological chemistry confirmatory measurements study.
DISTRIBUTION CODE:
IE06D COPIES RECEIVED:LTR I ENCL Q SIZE:
cP TITLE: Environ
& Radiological (50 DKT)-Insp Rept/Notice of Violation Respons NOTES:
C RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: AEOD/DSP NMSS/SGOB 4E4 NRR/DOEA/EAB ll NRR/DREP/RPB 10 NUDOCS-BSTRACT L
02 RGN2 FILE 01 RGN4 MURRAYIB TERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 2
2 1
1' 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD2-2 PD, NMSS/LLOB 5E4 NRR/DLPQ/PEB 11 NRR/DREP/EPB 10 NRR/PMAS/ILRB12 OGC/HDS2 RES RGN2/DRSS/EPRPB
-NRC PDR RESL MARTIN,D COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
NOTE IO ALL "RIDS" RKX.IPIEGS:
PIEASE HELP US IO REDOCE HASTE!
CXRZACZ 'IHE DOQJMEHZ CONTROL DESK RXM Pl-37 (EZI'. 20079)
KO EIiMCNAXE YOUR NAME PKH DIBTRIBUTICN LISTS FOR DOCUKWZS YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL 22
Florida Power and Light Company
~
~
~
ATTN:
Mr. W. F.
Conway Senior Vice President
- Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
0
SUBJECT:
DOCKET NOS. 50-250 AND 50-251, NON-RADIOLOGICAL CONFIRMATORY MEASUREMENT RESULTS SUPPLEMENT TO INSPECTION REPORT NOS. 50-250/88-06 AND 50-251/88-06 As part of a special NRC non-radiological chemistry confirmatory measurements study, in conjunction with Brookhaven National Laboratory (BNL), spiked liquid samples were brought to your Turkey Point facility on March 7, 1988, for your analysis.
We are in receipt of your analytical results and the comparisons of your results to the NRC/BNL results are presented in Enclosure 1.
The acceptance criteria for these comparisons are discussed in Enclosure 2.
The results should be reviewed in greater -detail by cognizant plant staff members and will be discussed during future NRC inspections.
Sincerely;=
Enclosures:
1.
Non-Radiological Confirmatory Measurement Results 2.
Criteria for Comparing Analytical Measurements Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc w/encls:
JJ.
S., Odom, Vice President Turkey Point Nuclear Plant
+J.'.
- Cross, Plant Manager Turkey Point Nuclear Plant
+.
W. Bladow, Plant gA Superintendent P. Arias, Jr., Regulatory and Compliance Supervisor State of Florida bcc w/encls:
(See page 2)
Florida Power and Light Company
~
~
~
b w/encl s:
. E. Edison, Project Manager, Project Directorate II-2, Division of Reactor
- rojects, NRR
'C Resident Inspector DRS Technical Assistant Document Control Desk 0
RII RII RII Hughey
- JKahle, RCrleAjak 12/~/88 12/).3/88 I
gr/gc)
I~
iO