ML17347A902

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amends 134 & 128 to Licenses DPR-31 & DPR-41,respectively & Final Determination of Nshc.Amends Revise Tech Spec Section 3.1.2 by Incorporating Revised Pressure & Temp Limits for RCS & Pressurizer
ML17347A902
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/10/1989
From: Edison G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17347A898 List:
References
NUDOCS 8901190145
Download: ML17347A902 (4)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION FLORIDA POWER AND LIGHT COMPANY DOCKET NOS. 50-250 AND 50-251 NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment Nos.

134 and 128 to Facility Operating License Nos.

DPR-31 and DPR-41, respectively, to the Florida Power and Light Company (the licensee),

which revised the Technical Specifications for operation of the Turkey Point Plant, Unit Nos.

3 and 4, located in Dade County, Florida.

The amendments w~re effective as of the date of issuance.

The amendments revise Section 3.1.2 of the Technical Specifications (TS) by incorporating revised pressure and temperature (P/T) limits for the Reactor Coolant System and pressurizer.

The P/T limits currently in the TS are applicable up to 10 effective full power years, and will soon expire.

The amendments replace these P/T curves with revised curves applicable up to 20 effective full power years.

The amendments also revise ihe applicable "Bases" discussion to be consistent with the new limits, and reformat the TS to be consistent with more recent standards TS.

The application. for the amendments complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.

S901i90i45 890Li~0 PDR ADOCK 05000250 P

PQU

Notice of Consideration of Issuance of Amendments and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on October 19, 1988 (53 FR 40988).

A request for a hearing was filed on November 17, 1988 by Joette Lorion.

Under its regulations, the Commission may issue and make an amendment immediately effective, notwithstanding the pendency before it of a request for a hearing from any person, in advance of the holding and completion of any required hearing, where it has determined that no significant hazards considerations are involved.

The Commission has applied the standards of 10 CFR 50.92 and has made a

final determination that the amendments involve no significant hazards considerations.

The basis for this determination is contained in the Safety Evaluation related to this action.

Accordingly, as described

above, the amendments have been issued and made immediately effective and any hearing will be held after issuance.

The Commission has determined that the amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22.

Therefore, pursuant to 10 CFR 51.22(b),

no environmental impact statement or environmental assessment was prepared for these amendments.

For further detai ls with respect to the action, see (1) the application for amendments dated September 21, 1988, (2) Amendment Nos.

134 and 128 to Facility Operating License Nos.

DPR-31 and DPR-41, and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document

Room, 2120 L Street, N.W., Washington, D.C.,

and at the Environmental and Urban Affairs Library, Florida International University, Miami, Florida 33199.

A copy of items (2) and (3) may be obtained upon request:

addressed to the U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:

Director, Division of Reactor Projects I/II.

Dated at Rockville, Maryland this 10th day of January 1989.

FOR THE NUCLEAR REGULATORY COMMISSION Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

4