ML17347A939
| ML17347A939 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/27/1989 |
| From: | Lieberman J, Rosano R NRC OFFICE OF ENFORCEMENT (OE) |
| To: | |
| References | |
| EA-88-267, EN-89-006, EN-89-6, NUDOCS 8902030207 | |
| Download: ML17347A939 (2) | |
Text
ACCELERATED D)STt
'Tl0>
DE MON STRAT+'i
&'STEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8902030207 DOC.DATE: 89/01/27 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION ROSANO,R.
Ofc of Enforcement (Post 870413)
LIEBERMAN,J.
Ofc of Enforcement (Post 870413)
RECIP.NAME RECIPIENT AFFILIATION R
SUBJECT:
EN-89-006:on 890201,notice of violation
& proposed imposition of CP in amount of $100,000 will be issued.
DISTRIBUTION CODE:
IE33D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Enforcement Notice (EN)
NOTES RECIPIENT ID CODE/NAME INTERNAL: AEOD/DOA DEDRO NRR/DREP/EPB 10 NUDOCS-ABSTRACT OE LIEBERMAN,J, RGN2/DRSS/EPRPB EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME AEOD/DSP/TPAB NRR/DOEA/EAB 11 NRR/PMAS/ILRB12 OE FILE 01
~REG~:~
02 NRC PDR COPIES LTTR ENCL R
I S
h NOIK K) ALL "RIDS" RECZPZENIS:
PLEASE HELP US 'lO REDUCE %PETE!
CDNI'ACT 'IHE DOQJNEÃZ Ct.VZROL DESK, BOOM Pl-37 (EXP. 20079) K) EL32GMTE YOUR NAME FKR DZPQGEPZIGN LISTS FOR DOCUMEÃZS YOU DON'T NEEDj C7 TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~ ENCL 14 D
S
January 27, 1989 EN 89-06 OFFICE OF ENFORCEMENT NOTIFICATION S
I C
CEMENT ACTION Licensee:
Florida Power and Light=Company (EA 88-267)
(Turkey Point)
Docket Nos. 50-250; 50-251
Subject:
PROPOSED IMPOSITION OF CIVIL PENALTY - $100,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of One Hundred Thousand Dollars
($ 100,000) will be issue'd on or about February 1,
1989 to Florida Power and Light Company.
This action is based on the improper repositioning of a security guar'd posted as a compensatory measure and his resulting inability to maintain surveillance over the area to which he was originally assigned.
In addition, the NRC was not notified of this event until after the required time period.
The escalation and mitigation factors were considered and the base penalty was increased by 100% due to the licensee's continued poor performance in the area of security.
It should be noted that the licensee has not been enforcement action.
The schedule of issuance and Mailing of Notice Telephone Notif>cation of Licensee The State of Florida will be notified.
specifically informed of the notification is:
February 1,
1989 February 1,
1989 The licensee has thirty days from the date of the Notice in which to respond.
Following NRC evaluation of the response, the civi 1 penalty may be remitted, mitigated, or imposed by Order.
Contact:
- RRosano, OE 20740 Distribution J.
Lieberman, 20741 OllFN 3'; f o Chairm~an ech Comm. Roberts Comm. Carr Comm.
Rogers Comm. Curtiss SECY ACRS CA GPA OMFN 3: /o EDO DEDRO NRR OE NMSS OCC OI SP OSP MNBB 8; /<
RH AEOD Regional Offices MAIL RI ~:1o RIVI:i<
ADM: Doc. Hgt. Br.
RIi ~le RV 3.;
a PDR RES GIA PRELIMINARY INFORMATION -
NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNOUNCED o(