ML17347A910
| ML17347A910 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 12/31/1988 |
| From: | Bonnett D, Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-89-15, NUDOCS 8901230360 | |
| Download: ML17347A910 (29) | |
Text
A(.'CELERATED Dl'.>111BUTION DEMONSTRATION SYSTEM REGULATOR+NFORMATION. DISTRIBUTION +TEM (RIDE)
ACCESSION NBR:8901230360 DOC.DATE: 88/12/31 NOTARIZED: NO DOCKET FACIL:50-000 'Generic Docket 05000000 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-.251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
05000335 50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
05000389
-AUTH.NAME AUTHOR AFFILIATION BONNETT,D.M.
Florida Power
& Light Co.
CONWAY,W.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION or Turkey Point Units tr.
ENCL SIZE:
NOTES:
SUBJECT:
Monthly operating repts for Dec 198 3
4,
& St.Lucie Units 1
& 2. /
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 R
RPB 10 REG ILE Ol EXTERNAL: EG&G SIMPSON,F LPDR NSIC COPIES LTTR ENCL 1
0 1
0 10 10 1
1 1
1 1
1 1
1 1
1 2
2 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NORRIS, J AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGN2 EG&G WILLIAMSFS NRC PDR COPIES LTTR ENCL 5
5 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 R
I D
h NOXE 10 ALL "RIDS" RECIPZZAIS:
PIZASE HELP US TO REDUCE WASXF!
COG'ACZ 'IHE DOCUMENT CXKHRL DESK, ROCN Pl-37 (EZF. 20079)
KO EIZKlHATH YOUR NAME 'PKH DIPHUBUTIGN LISTS H)R DOCUMENIS YOU DONFT NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 34 ENCL 31.
0 Al e
,AlME DAILY UNIT PURER LEVEL DOCKET No.
UNIT DATE CONPLETED BY TELEPHONE 50-335 St. Lucie f1 January 16, 1989 D. N. Bonett 407 694-4432
- December, 19BB DAY AVERA6E DAILY PSKR LEVEL (N Qe-Net) 12/ 1/88 12/ 2/88 12/ 3/88 12/ 4/88 12/ 5/88 12/ 6/88 12/ 7/88 12/ 8/88 12/ 9/88 12/10/88 12/11/88 12/12/88 12/13/88 12/14/88 12/15/88 12/16/88 12/17/88 12/18/88 1'2/19/88 12/20/88 12/21'/88 "12/22/88 12/23/88 12/24/88 12/25/88 12/26/88 12/27/88 12/28/88 12/29/88 12/30/88 12/31/88 865 868 870 870 869 869 869 867 863 859 832 714 715 722 721 722 722 735 871 877 877 874 874 873 873 874 875 874 871 871 870 8901230360 881231 PDR AOOCK 05000250 t
R PDC
4I
OPERATING STATUS OF'ERATING DAT* REPORT DOCYET NO bO 335 DATE 1/ 9/89 COMPLETED BY D+
Mi BONETT TELEPHONE 407/694/4432 1 i UNIT NAMEt ST i LUCIE UHXT 1
2.
REPORTXHG PERIOD+
.DECEMBER 1988 3,
LICENSED THERMAL POWER (NWT):
2700 4
o HAMEF'LATE RATING (GROSS MWE) i 850 5 o DESXGN ELECTRICAL R*TING (HET MWE) i 830 6+
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) +
872 7+
MAXIMUM DEPEND*BLE CAP*CITY (NET MWE):
839 Si IF'HANGES OCCUR IN CAF'ACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)
SXHCE LAST REPORTr GTVE REASONS+
9, POWER LEVEL TO WHICH RESTRICTED IF *NY (NET MWE) le+
RE*SONS FOR RESTRICTIONS r IF ANY+
MONTHLY
-YTD-CUMULATIVE 11 HOUI'S IN REF'ORT PERIOD'2 NUMBER OF HOURS REACTOR WAS CRXTXC*L 13; REACTOR RESERVE SHUTDOWN HOURS 14 i HOURS GENERATOR ON-LINE 15'HXT RESERVE SHUTDOWN HOURS 16i GROSS THERMAL ENERGY GENERATED (NWH) 17+
GROSS ELECTRICAL ENERGY GENERATED (NWH) 18+
HET ELECTRIC*L ENERGY GENERATED (NWH) 19'NXT SERVICE FACTOR
'0.
UHXT AVAILABILITYFACTOR 21.
CAF'ACITY FACTOR (USING MDC NET) 22'APACITY FACTOR (USING DER NET)
/3.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS 'SCHEDULED OVER NEXT 6 MONTHS 744 744iO 0.0 744iO OiO 1938835 654790 621739 100iO 100.0 99i6 100+7 e,e 8784 7554i3 OiO 74e9.
OiO 19673517 6595010 6250363 84o4 84i4 84+8 85'ii6 105456+0 79098.6 205i3 78379+3 39i3 201021187 661'18595 62451'530 74i3 74' 73o7 72t&
3.8 25 o 1F SHUT DOWH AT EHD OF REF'ORT F'ERIOD y ESTIMATED DATE OF STARTUP
~
'I
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 1988 DOCKET NO.
UNiT NAME St. Lucie Unit 81 DATE January 16.
1989 COMPLETED BY TELEPHONE (407) 694-4432 No.
Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Licensee Event Reports'ystem Code4 Component Codes Cause &Corrective Actionto PreventRecurrence Unit fl operated at essentially full power and had no shutdowns or significant power reductions.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error(Explain)
H - Other(Explain)
Method 1 - Manual 2-ManualScram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Exphin)
ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)
Exhibit 1-Same Source
0
'L q JtP
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-335 St. Lucie Unit 81 January 16.. 1989 D. M. Bonett' 407) 694-4432 REPORT. MONTH December 1988 St. Lucie Unit f1 operated at essentially full power and had no shutdowns or significant power reductions.
In accordance with. requirements of Technical Specification 6.9.1.6, there were. no challenges to PORV or safety valves during, the report period.
AVIATE OAILV UNIT PURER LEVEL
~
DOCKET NQ.
UNIT DATE CONPLETED BY TELEPHONE 50-389 St. Lucie g2 D. H'Bonett
<432 NNTH December 1988 DAY AVERA6E DAILY PSKR LEVEL (N Qe-Net) 12/ 1/88 12/ 2/88 12/ 3/88 12/ 4/88.
12/ 5/88 12/ 6/88 12/ 7/88 12/ 8/88 12/ 9/88 12/10/88 12/11/88 12/12/88 12/13/88 12/14/88 12/15/88 12/16/88 12/17/88 12/18/88 12/19/88 12/20/88 12/21/88 12/22/88 12/23/88 12/24/88 12/25/88 12/26/88 12/27/88 12/28/88 12/29/88 12/30/88
" 12/31'/88 857 858 859 859 859 859 861 860 858 856 858 858
= 859 859 861 860 860 861 860 861'60 859 856 854 855 856 857 857 854 853 852
l~
'Iv
OPERATING STATUS OF'ERATING DATA REPORT DOCKET NO 50 389 DATE 1/ 9/89 COMPLETED BY D.
N.
BOHETT TELEPHONE 407/694/4432 1+
UNIT N*NE:
ST o LUCIE UNIT 2 2,
REPORTING PERXOD:
DECEMBER 1988 3+
LICENSED THERMAL POWER (MWT)+
2700 4i NAMEPLATE RATING (GROSS MWE) o 850 5
DESIGN ELECTRICAL R*TXHG. (NET MWE)'30 6,
MAXIMUM DEPENDABLE C*PACITY (GROSS NWE);
882 7
MAXIMUM DEPENDABLE CAP*CITY (NET MWE)'839 8,
XF'HANGES OCCUR IN CAF'ACXTY R*TINGS. (ITEMS NUMBER 3 THROUGH 7)
SXNCE LAST REPORT~
GIVE REASONS+
9 i POWER L'EVEL TO'HICH RESTRICTED r IF, AHY (HET MWE) ie, RE*SONS FOR RESTRICTIONS. IF AHY:
MONTHLY
-YTD-CUNUL*TIVE HOURS IN REF'ORT F'ERIODi 744 12 NUMBER OF HOURS REACTOR WAS CRITICAL 744 0
13o REACTOR RESERVE SHUTDOWN HOURS OoO 14, HOURS GENERATOR ON-LINE 744' 15'NXT RESERVE SHUTDOWN HOURS OiO 16.
GROSS THERMAL ENERGY GENERATED (MWH) 2009108 17+
GROSS ELECTRICAL ENERGY. GENERATED (NWH) 672220 18.
HET ELECTRICAL ENERGY GENERATED (NWH) 638326 19'NIT SERVICE FACTOR 100+0 2e, UNIT AVAILABILITYFACTOR 100+0 21+
CAF'ACITY FACTOR
( USXNG NDC NET )
102+ 3 22'APACITY F*CTOR (USING DER NET) 103+4 23>
UNXT FORCED OUTAGE RATE OiO 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING! 'SCHEDULED FOR 83 DAYS BEGINNING 2/4/89 8784 8784+0 0.0 8784+0 OiO 23487030 7808180 7407105 100+0 100' 100+5 101+6 e.e 47353+0 41542+0 0 i 0 40821i6 OoO 106483670 35496840 33574893 86.2 86+2 86+6 86+4 5o8 25.
1F SHUT DOWN AT END OF REPORT PERIODS ESTIMATED DATE OF'TARTUP;
$ 4(
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH
- December, 1988 DOCKET NO.
DATE Januar 16 1989 COMPLETED BY D-N. Bonett.
TELEPHONE (4D7) 694-4432.
No.
Date Type Duration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report iii System Code4 Component codes Cause &Corrective Actionto PreventRecurrence Unit f2 operated at essentially full power and had no shutdowns or significant power reductions.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Reguhtory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Exphin)
ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report (LER)File (NUREG4161)
Exhibit 1-Same Source
ik
S MMARYOF OPERATING EXPERI.
E DOCKET NO.
UNIT DATE'OMPLETED BY TELEPHONE
'50-389 St.
Lu'cie Unit f2 January 16, 1989 D. H. Sonett (407) 694-4432 REPORT MONTH Decemb r St. Lucie Unit f2 operated at essentially full power and had no shutdowns or significant power.reductions.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period.
AVE!BE OAILY UNIT PONER LEVEL ~
IKET'NO.
50-250 UNIT Turkey Point f3 DATE Januar 16.
1989 CNPLETED BY D. H. 'Bonett TELEPHONE 407 694-4432 g~TH December.
1988 DAY AVERA6E DAILY POMER LEVEL (N~t) 12/ 1/88 12/ 2/88 12/ 3/88 12/ 4/88 12/ S/88 12/ 6/88 12/ 7/88 12/ 8/88 12/ 9/88 12/10/88 12/11/88 12/12/88 12/13/88 12/14/88 12/1S/88 12/16/88 12/17/88 12/18/88'2/19/88 12/20/88 1.2/21/88 12/22/88 12/23/88'2/24/88'2/2S/88 12/26/88 12/27/88 12/28/88 12/29/88 12/30/88 12/31/88
-8
-1 1'12
-13
-13
-13
-13
-13
-13
-13
-13
-13
-13
-13
-13
-13
-13
-13.
-22
-21
-17
-16
-16
-16
-16
-15
-14
-14
-14 1'4
0 II P
1
- kwl,
OPERATING STATUS OPERATZHG DATA REPORT DOCKET HO 50 250 DATE 1/ 9/89 COMPLETED BY D+
M.
BONETT TELEPHONE 407/694/4432 1 o UHIT NAME o TURKEY POXHT UHIT 3 2.
REPORTXHG PERXOD'ECEMBER 1988 3+
LICENSED THERMAL POWER (MWT):
2200 4o NAMEPLATE RATTNG (GROSS MWE):
768 5
DESIGN ELECTRICAL RATXNG (NET MWE) +
693 6+
MAXIMUM,DEPENDABLE CAPACITY (GROSS MWE)o 699 7+
MAXIMUM DEPEHDABLE CAPACITY ('HET MWE) i 666
- 8. IF CHANGES OCCUR ZH CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SXNCE LAST REPORT~
GIVE REASONS+
9i POWER LEVEL TO WHICH RESTRICTED'F AHY (HET MWE) 10.
REASONS FOR RESTRICTIONS XF ANY:
MONTJ-EELY YTD-CUMULATZVE 11+
HOURS IN REPORT 'PERIOD i 12+
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14+
130URS GENERATOR OH-LXNE 15'NIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (MWH) 17+
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18+
HET ELECTRICAL ENERGY GENERATED (MWH) 19+
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21'APACITY. FACTOR (USXNG MDC HET) 22'APACITY FACTOR (USING DER HET) 23+
UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 OiO O.e e,e OiO 0
0
-11'168 0+8 e,e 0.0 0+0 1()0i 0 8784 5408,1 0.0 5322t3 0+0 11389486 3664525 3451758 60i6 60+6 59.0 56+7 39o4 i40913i6 93383+7 844i4 92157i4 121+8 191193749 61262526 57930544 65' 65 t 5 63.0 59i3 12+ 7 25 i IF SHUT DOWN AT END OF REPORT PERIOD ~
ESTIMATED DATE OF STARTUP l 01/15/89
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH
- December, 1988 DOCKET NO.
UNtT NAME Turke Point Unit f3.
DATE January 16, 1989 COMPLETED By D
N Bonett TELEPHONE 4oI 694-4432.
No.
Date Type'uration (Hours)
Reasons Method of Shutting Down Reactor Ucensee Event Reports System Code 4 Component Codes Cause &Conective Actionto PreventRecurrence 10 12 881001 881210 881230 230.2 A
481.8 32 HA GENERA ZZ ZZZZZZ MA PIPEXX Unit f3 remained shutdown for electrical generator rotor replace-ment.
Procedure and drawing revisions.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other(Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Exphin)
ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) Rle (NUREG4161)
Exhibit 1-Same Source
t t
SUMMARY
OF OPERATING EXPERIENCE DOCKET'NO.
UNIT DATE COMPLETED. BY TELEPHONE'0-250'urkey Point Unit g3 January 16, 1989 D. M. Bonett (407) 694-4432 REPORT MONTH December 1988 See the "Unit Shutdowns and Power Reductions" Sheet for 'Unit 83.
0
AlME DAILY UNIT PURER LEVEL DOCKET NQ.
UNIT DATE CONPLETED BY TELEPHONE,
.50-251 Turkey Point f4 Januar 16 1 8 D. H. Bonett 407 694-4432 December 1988 DAY AVERNNE DAILY PSKR LEVEL (I~t) 12/ 1/88 12/ 2/88 12/ 3/88 12/ 4/88 12/ 5/88 12/ 6/88 12/.7/88.
1'2/ 8/88 12/ 9/88 12/10/88 1 /11/SS 12/1'2/88 12/13/88 12/14/88 12/15/88 12/16/88 12/17/88 12/18/88 12/19/88 12/20/88 12/21/88 12/22/88 12'/23/88
'12/24/88 12/25/88 12/26/SS 12/27/88 12/28/88 12/29/88 12/30/88 12/31/88 0
0 0
0 0
0 0
0 0
0 0
'0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
OPERATING STATUS OPERATING DATA REPORT DOCKET NQ 50 251 DATE 1/ 9/89 COMPLETED BY Di Mi BONETT TELEPHONE 407/694/4432 1,
UNIT NAME: TURKEY POINT UNIT 2.
REPORTING PERIOD'ECEMBER 1988 3+
LXCENSED THERMAL POWER (MWT>i 2200 NAMEPLATE R*TING (GROSS MWE) t 760 5i DESIGN ELECTRICAL RATING (NET MWE) +
693 6+
MAXIMUM DEPEND*BLE CAPACITY (GROSS MWE) i 699 7i M*XIMUM DEPENDABLE CAPACITY (NET MWE) i 666 8+
XF CH*NGES OCCUR XN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT t GXVE REASONS+
9.
POWER LEVEL TO WHICH RESTRICTED ~
XF ANY <NET MWE) 10 i RE*SONS FOR RESTRICTIONS ~ IF ANYi MONTHLY
-YTD-CUMULATIVE 11+
HOURS XN REPORT PERIOD t 12 i NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LXNE 15.
UNIT RESFRVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (MWH) 1'7+
GROSS ELECTRICAL ENERGY GENERATED
<MWH) 18.
NET ELECTRIC*L ENERGY GENERATED (MWH) 19, UNIT SERVICE F*CTOR 20 i UNIT AVAILABXLITYFACTOR 21+
CAPACITY FACTOR (USING MDC NET >
22.
CAPACITY FACTOR (USING DER NET) 23'NIT.FORCED QUTAGE RATE 4.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 8+0 OiO OiO OoO 0
0
-877 0+0
,0+0 OiO OoO
.e,e 8784 5050+1 0.0 4988+0 0.0 18626797 3449038 3264477 56.8 53+6 19i7 134645.0 90236+6 166i6 87194oi 32' 184082420 58748802 55583259 64i8 64+8 63.3 59i6 iii4 25 XF SHUT -DOWN AT END OF REPORT PERIODS ESTIMATED DATE OF STARTUP'3/24/89
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 1988 DOCKET NO.
50-251 UNIT NAME Turke Point Unit f4.
Januar 16, 1989 COMPLETED By D. M. Bonett
-<<3-Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Reports System Code~
Component Codes Cause &Corrective Actionto Prevent Recurrence 880920 S
744 RC FVELXX Unit f4 remained shutdown for refueling and scheduled maintenance.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examiriation F - Administrative G - Operational Error (Explain)
H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Exphin)
ExhibitG-Instructions forPreparation ofData Entry Scheets Licensee Event Report(LER) Fde (NUREG4161) 5 Exhibit1-Same Source OS1547
DOCKET NO..
UNIT DATE COMPLETED BY TELEP.HONE 50-'251'urkey Point Unit g4 January -16.
1989 D. N. Sonett (407) 694-4432 REPORT:MONTH December.
1988 Unit f4 remained shutdown for refueling and scheduled maintenance.
P.O. Box 14000, Juno Beach, FL 33408-0420 JANUARY, i 7 1989 L-89-15 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.. 20555 Gentlemen:
RE:
Turkey Point Units 3 and 4
Docket Nos.. 50-250 and 50-251 St. Lucie Units 1 and 2
Docket.Nos.
50-335 and.50-389 Monthl 0 eratin Re ort Attached are the December 1988.Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and.2.
Very truly, yours, W. F.
Con ay Senior Vice President Nuclear WFC/DMB Attachments cc:
Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant an FPL'Group company
4 ik II 7'l,